Gold Hydrogen Limited – Quarterly Activities Report
Quarterly Activities Report for the Period Ended
31 March 2026
GOLD HYDROGEN LTD (ASX:GHY)
Shares on Issue
180,454,285
Market Capitalisation
A$63m (at A$0.35 per share)
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Company Secretary / CFO
Karl Schlobohm
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
Company Contacts:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
Karl Schlobohm – Company Secretary
kschlobohm@goldhydrogen.com.au
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Company Information:
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
X: @GHY_ASX
HIGHLIGHTS FOR THE MARCH QUARTER
Mobilisation of the Ramsay flow test program is imminent,
with procurement and regulatory approvals well advanced.
Equipment mobilisation is currently scheduled for late May,
with flow testing operations currently scheduled to
commence by late June.
The flow test campaign will undertake separate zonal testing
of discrete Natural Hydrogen and Helium-bearing
formations, representing the first comprehensive
production-style evaluation across the Ramsay wells.
Independent petrophysical re-interpretation of wireline
data from Ramsay 3 and Ramsay 4 has materially upgraded
the test program, identifying additional porous zones for
flow testing and increasing gross reservoir thickness in
Ramsay-3 by more than 200%.
Flow testing follows exceptional subsurface indicators,
including soil gas (geochemical) results of up to 2,160 ppm
Natural Hydrogen (c. 4,000x atmospheric background)
across the Ramsay Project area. Based on the published
information available, the Company considers its results to
be among the highest reported in Australia using this
method.
Phase I fluid inclusion studies across the Company’s
high-graded exclusive application areas support the presence
of regionally extensive Natural Hydrogen and Helium
generation systems across Gold Hydrogen’s 77,292 km²
tenement portfolio, underpinning the strategic importance
of the Ramsay tests.
Helium market conditions are highly supportive, with
pricing strengthening sharply on the back of sustained
demand (AI, medical, defence and advanced manufacturing)
and major supply disruptions, with an estimated 35% of
global supply currently offline due to Middle East instability.
In parallel with the flow test program, the Company is
working with Worley to assess early development pathways,
including the potential to fast-track a Helium development
at Ramsay to supply the Australian domestic market and
enhance Australia’s sovereign Helium capability.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 2
EXPLORATION AND TECHNICAL ACTIVITIES
General Background
Gold Hydrogen is focused on the discovery and development of Natural Hydrogen and Helium gases
in a potentially extensive and world class Natural Hydrogen and Helium province in South Australia.
The forecast domestic and global demand for Hydrogen, combined with new Natural Hydrogen
exploration techniques and experienced personnel, provides Gold Hydrogen with an extraordinary
opportunity to define and ultimately develop a new Natural Hydrogen gas province. Further to this,
Helium is extremely rare and expensive, there is limited world-wide production, and no production of
Helium in Australia at present. Gold Hydrogen is well placed to potentially prosper from this
opportunity.
The combined gas-related permit area of the Gold Hydrogen group exceeds 75,000km2
. Gold
Hydrogen holds one granted exploration license (the Ramsay Project - PEL 687) and one application
area, whilst its two 100% owned subsidiary companies (White Hydrogen Australia and Byrock
Resources) hold an additional seven (7) applications for Natural Hydrogen and Helium exploration
within South Australia. Gold Hydrogen is also the preferred applicant for four (4) gas storage
exploration licenses applications (GSELA) covering an area approximating 8,000km2
within the Yorke
Peninsula portion of PEL 687 in South Australia. These storage licence applications are in addition to
the granted exploration licence and application licences.
A summary of the status of the group’s petroleum, mineral and storage licence tenure at the end of
the Quarter is outlined in Appendix A. Refer also to the map at Figure 1.
Geochemical Sampling Pilot Study at Ramsay
A total of 39 soil gas samples were collected and analysed in March across the Ramsay area and along
road reserves using a mobile sampling unit operated by CSI Australia Pty Ltd (see Figure 2 for map and
summary of results obtained). Each sample was obtained from a hand augured hole to a depth of up
to 1.2 m (or refusal) at 0.5 to 1 km intervals along road reserves, with a nylon tube inserted to collect
a grab sample of soil gas from the base of the hole, following which the hole was backfilled. The grab
sample was analyzed on the spot using a portable Gas Chromatograph (GC) providing real-time
results, with Natural Hydrogen and Helium both analyzed to a 10 ppm detection limit. The technique
used is designed to minimize the possibility of Hydrogen generation by mechanical means. It also can
separate noble gases from Hydrogen in the column, which is not possible with confidence using
handheld field meters.
Results from the pilot study are extremely encouraging, with a maximum value of 2,160 ppm Natural
Hydrogen (almost 4,000 times background) obtained, and 635 ppm Natural Hydrogen in an adjoining
sample (collected 1km to the south). Based on the published information available, the Company
considers its results to be among the highest reported in Australia using this method. Furthermore,
these abnormally high levels were not near any previously known Natural Hydrogen occurrence, and
demonstrate the potential for an extension of the Ramsay project area to the south of the existing
wells.
Of the 39 samples collected, four samples exceeded 500 ppm Natural Hydrogen, including 1,100 ppm
Natural Hydrogen at the Ramsay 1 well location. The fact that the technique detected the Ramsay 1
occurrence is considered significant as it provides confidence in the sampling methodology over a
confirmed Natural Hydrogen occurrence at depth. The Company will look at additional areas for
follow-up sampling as a method to mature and de-risk additional drilling targets across PEL 687.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 3
Figure 1: Gold Hydrogen PEL 687 and PELA’s located in South Australia
`
Gold Hydrogen Limited – Quarterly Activities Report p. 4
Figure 2: Location and results of 39 soil gas samples collected by CSI
Regional Fluid Inclusion Study
A total of 51 rock samples were collected from drill core and cuttings from historic wells located on
the Company’s Petroleum License Application Areas (PELA’s) including the northern Yorke Peninsula
(PELA 688 and 792) and the Fleurieu Peninsula (PELA 688) (see Figure 3). The study targeted a wide
range of geological materials, including sedimentary rocks (sandstones and carbonates spanning the
Neoproterozoic to Tertiary), metamorphic rocks (metasediments, schists, and metasomatised units),
and basement lithologies such as granites, gneiss, amphibolites, and mafic intrusives. Particular
emphasis was placed on samples containing mineral features likely to host fluid inclusions, such as
veins, cemented fractures, and well-crystallised phases. Gas extraction and quantification processes
were carried out using the Fluid Inclusion Stratigraphy (FIS) technology by SLB, which releases gases
trapped in microscopic fluid inclusions through controlled crushing. The liberated gases are then
analysed to determine their composition, including the presence of Natural Hydrogen and / or Helium.
Preliminary results from 51 analysed samples indicate a widespread occurrence of both Natural
Hydrogen and Helium across the studied regions, including within PELA 792. Natural Hydrogen
concentrations exceeded background thresholds in 23 samples, while Helium exceeded threshold
levels in 29 samples. Of these elevated samples, 13 samples showed Helium more than 10 times higher
than background thresholds (see Table 1).
`
Gold Hydrogen Limited – Quarterly Activities Report p. 5
These detections span multiple lithologies and geological settings, suggesting that both gases are not
restricted to a single rock type or stratigraphic interval. The relatively frequent co-occurrence of
Natural Hydrogen and Helium indicates the potential for combined resource systems, with Helium
representing an additional high-value product. Overall, the results strongly support the Company’s
view that Natural Hydrogen occurrences and potential reservoirs could be widespread, and highlight
the potential of the Company’s exploration portfolio away from the world class Ramsay Project.
Additionally, Helium enrichment further enhances the exploration significance and opportunity for
new dual gas targets to be matured for future drilling. These findings justify continued, more detailed
investigation to better constrain gas origins, distribution, and economic potential within the PELA’s
exclusively held by the Company.
Figure 3: Location of selected boreholes and samples taken for Fluid Inclusion Stratigraphy analysis
It is important to note that field-based activities in these PELA areas cannot commence until the permit
areas are progressed to granted status. However, this ongoing process of preliminary desktop work
is extremely useful in identifying priority areas and potential target zones for future on-ground
activities.
Number of samples at
or below background
thresholds
Number of samples up
to 10x above
background thresholds
Number of samples
greater than 10x above
background thresholds
Helium 28 16 13
Natural Hydrogen 28 23 0
Table 1: Fluid Inclusion Stratigraphy study results compared to background thresholds
`
Gold Hydrogen Limited – Quarterly Activities Report p. 6
Petrophysical Interpretation of Ramsay 3 and Ramsay 4 Wireline
The Company engaged ImageStrat Pty Ltd to conduct specialist processing of the STAR-UXPL borehole
image data which has improved both the resistivity and acoustic images acquired during wireline
logging of both Ramsay 3 and Ramsay 4, providing higher confidence in interpretation of the data.
Preliminary interpretation on the processed logs has uncovered additional fracture zones open to the
borehole wall and multiple additional porous intervals across both the Natural Hydrogen and Helium
bearing reservoirs. As a result, the gross reservoir thickness across the combined Parara, Kulpara and
Winulta formations in Ramsay 3 has increased by more than 200% and provided additional zones for
the near-term flow testing campaign (see Figure 4 and updated technical Table 2 and Table 3
appended).
Additional independent petrophysical QC, processing and interpretation continues across the full suite
of wireline logs acquired in Ramsay 3 and Ramsay 4. Interim results also confirm thicker gross reservoir
intervals than previously identified, and demonstrate that Ramsay 3 in particular appears to have
intersected enhanced porosity and permeability over the Kulpara Dolomite Formation which provides
further confidence of the presence of reservoir properties that could flow commercial quantities of
Helium.
Third party laboratory analysis of samples collected during the drilling of Ramsay 3 and Ramsay 4 is
ongoing and results will be integrated into petrophysical interpretations ahead of the upcoming
Ramsay flow test campaign.
Ramsay Flow Testing Operational Update
Results from the Company’s drilling operations to date have demonstrated that Natural Hydrogen and
Helium are present in separate formations, with Natural Hydrogen in the shallower Parara Formation
and Helium in the deeper Kulpara Formation. As a result, zonal testing of these distinct separate
Natural Hydrogen and Helium zones will be conducted as part of a strategy to demonstrate
commercial flow potential for both gas streams.
Of note, the current Helium supply disruptions occurring in the Middle East along with unprecedented
demand growth in advanced manufacturing sectors such as semiconductors and Artificial Intelligence
(AI) data centers provide an opportunity for the Company to consider a fast-tracked Helium
development strategy at Ramsay, which can provide early infrastructure and cashflow for
reinvestment into a larger scale, mid-term Natural Hydrogen project on the Yorke Peninsula. As
previously disclosed, the Company has engaged Worley to provide conceptual development screening
in relation to this opportunity. The upcoming flow test program will allow the Company to assess the
commercial flow rate potential separately of both the Natural Hydrogen and Helium bearing reservoirs
at Ramsay.
Operations, Approvals and Planning
Engineering work is progressing on the integrated fluid management system for the upcoming flow
test program, while ongoing well engineering is being aligned with subsurface modelling inputs to
maximise reservoir deliverability. Fluid management during well testing will involve reinjection of
produced fluid (water) into the Ramsay 1 well. A temporary above ground pipeline will transfer fluid
from the well on test to the Ramsay 1 well for reinjection, and the installation of this and all other well
testing equipment can only commence following receipt of approvals.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 7
The Company is working closely with the South Australian government and regulatory approvals for
the flow test program are progressing, with the mobilisation of test equipment planned to commence
immediately upon receiving approvals. Further updates will be provided once approvals are secured
and equipment mobilisation has commenced, with an estimated commencement of preliminary
testing activities expected by late June 2026.
Figure 4: Ramsay 3 Kulpara Dolomite STAR-UXPL image log interpretation demonstrating excellent
reservoir quality
`
Gold Hydrogen Limited – Quarterly Activities Report p. 8
Other Field Activities Ahead of Flow Testing
During Q1 2026, field activities included road verge geochemical sampling (discussed above), wellhead
monitoring, and a fluid injectivity test at Ramsay 1. Of note, the Ramsay 1 injectivity test was carried
out to provide an understanding of the well’s capacity to accept the planned injection of fluid from
the 2026 well testing operations. The injectivity test was a short-term operation with results
exceeding the planed injection rate of up to 20,000 bbl/day for the upcoming flow tests.
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Groundbreaking Exploration Testing for Both Natural Hydrogen and Helium
The Ramsay Project well testing program was the first dedicated Natural Hydrogen and Helium well
test operation conducted in Australia, and to the Company’s knowledge, it is likely one of only a few
in the world. The Company considers this to represent the initial steps of an exciting journey, which
is not dissimilar to that undertaken by various world-renowned and ultimately successful oil and gas
projects, such as the early days in the CSG and shale industries. For those particular resources, the
exploration and completion techniques were developed and optimised over time, improving project
economics and ultimately leading to major projects being developed. The Company anticipates a
similar path forward for its Natural Hydrogen and Helium prospective resources, although the
timeframe may be quicker as drilling and completions technologies developed for other gas resources
may be applicable to its Natural Hydrogen and Helium projects.
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to be potentially developed
over time.
There is very little data available for dedicated Natural Hydrogen wells anywhere in the world due to
the lack of analogue wells. To the Company’s knowledge, the only Natural Hydrogen field currently in
production is located in Mali, West Africa, where Natural Hydrogen production is used to power the
small town of Bourakébougou. It has been reported that the Natural Hydrogen wells in Mali do not
have any decline in production and are continually regenerating and producing at the same rate.1
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate
to the presence, recovery, and potential volumes of Natural Hydrogen and Helium, but also due to the
location of the current and potential project sites within agricultural areas and proximal to National
Parks on both the Yorke Peninsula and Kangaroo Island, requiring significant landholder and
community engagement. The worldwide, Federal and South Australian Government and industry
efforts to secure Hydrogen as an alternative energy source provides confidence that any technical and
social concerns may be overcome.
1
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with
hydrocarbons”, First Break Volume 40, October 2022 (available via www.goldhydrogen.com.au/technical-
articles/)
`
Gold Hydrogen Limited – Quarterly Activities Report p. 9
CORPORATE ACTIVITIES
As disclosed in the previous Quarter, preliminary discussions are continuing with a range of industry
parties interested in mid- and / or down-stream commercialisation opportunities for Natural
Hydrogen and / or Helium gases.
One area of significant focus is the potential for the ultimate development of a green methanol
project.
Ramsay Project – Green Methanol Feasibility Study
Green methanol is a key fuel choice for decarbonising shipping and aviation because it is liquid at room
temperature, making it easier to store and transport than gaseous Hydrogen, and its use in existing or
easily converted engines results in significant lifecycle CO2 emission reductions. Major shipping
companies are currently ordering methanol-ready ships, and investing in green methanol production
to meet net-zero targets.
The Yorke Peninsula is very well placed to be a global green methanol production hub with abundant
waste agricultural biomass (biogenic carbon) and renewable energy sources. Critical to the production
of green methanol is cost-competitive Hydrogen, which the Company is striving to bring to
commercialisation via its Ramsay Natural Hydrogen and Helium Project.
The production of green methanol made using Natural Hydrogen is expected to have commercially
competitive advantages over green methanol produced via electrolysis-derived (ie. man-made)
Hydrogen, based on the evidence available from the Bourakebougou Natural Hydrogen Field in Mali.
Gold Hydrogen’s Ramsay Project has a significant prospective resource of Natural Hydrogen which it
is aiming to advance via the technical programs outlined above.
An initial analysis of the biogenic carbon sources in and around the Yorke Peninsula indicate a readily
available supply of up to 1.5 million wtpa (wet tonnes per annum) of compliant biomass2
.
Furthermore, long-term renewable energy pricing (solar / wind / BESS (battery energy storage
systems)) indicates that a project on the Yorke Peninsula can be supplied at economic rates via the
electricity network3
. Port infrastructure and capacity is also available on the Yorke Peninsula (eg. Port
Giles, Ardrossan) for importing and exporting activities.
Gold Hydrogen plans to assess all of these factors in detail and complete a Feasibility Assessment of
the green methanol opportunity, and – as previously reported - has appointed Mr Simon Talbot to
help spearhead this initiative. Based on the results of the Feasibility Assessment, a pilot plant will be
considered and costed for initial production.
Current Green Methanol pricing is USD850-1,050 per tonne4
, and is already in use within the
international shipping industry.
The Company will provide more detailed updates on this initiative once the Feasibility Assessment
commences.
2
South Australian Crop and Pasture Report 2024-25, January 2025.
3
Australian Energy Market Operator, 2024 ELI Report, June 2024 (Appendix 5 – South Australia).
4
Methanol Institute: Methanol Institute (2024). "Economic Value of Methanol for Shipping under FuelEU
Maritime and EU ETS." Analysis by Dr. Jeroen Dierickx.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 10
Ramsay Project – Helium Engineering Study
As outlined in the Company’s most recent ASX release, another rapidly emerging area of focus is the
potential commercialisation of Helium gases, as Australia is solely reliant on Helium imports for critical
activities in medical, AI / datacentre and defence fields. The air-corrected purity levels of Helium
detected to date at the Ramsay Project are world class, and on the back of these results, Gold
Hydrogen has been working with Worley in relation to potential commercial production modelling.
The Company will provide more detailed updates on the Green Methanol and Helium Engineering
Study initiatives once further progress has been made.
Personnel Updates
The Company is pleased to announce the appointment of Marshall Hood as Gold Hydrogen’s
Executive Vice President - Operations.
Marshall has more than 22 years of technical, operational and commercial experience in the upstream
energy sector. His previous roles have included various managerial and technical roles including for
Bangchak Corporation, Nido Petroleum and Ophir Energy. He has a successful exploration track record
with more than 500mmboe of discovered resources across multiple operated assets.
Marshall is a former Director of the Natural Hydrogen Association of Australia and has a BSc in
Exploration Geophysics (1st
Class Hons) from Curtin University of Technology, Western Australia.
The Company would like to advise that Frank Glass recently left Gold Hydrogen following the
expiration of his contracted term as its Geological Advisor. The Company’s Board and management
would like to sincerely thank him for his efforts during his tenure.
In addition, the Company is pleased to announce that Billy Hadi Subrata, Chief Technical Officer (CTO)
for Gold Hydrogen, has received his Fellow status from Engineers Australia (FIEAust), becoming the
first Fellow recipient in the Natural Hydrogen and Helium industry, considered to be a prestigious
honor and due recognition in the engineering and technical space in Australia.
FINANCIAL REPORTING
Exploration expenditures that were outlaid during the Quarter primarily relate to the Company’s
flagship Ramsay Project (PEL 687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure Amount
Surface sampling, surveys and sub-surface studies $138,669
Environmental and permitting costs $88,486
Native Title, land access and licence fees $163,809
Drilling and related activities $4,750,710
Total $5,141,674
Periodic adjustments to the above may be made in the Company’s financial statements for the
capitalisation of eligible wages and the offset of R&D taxation refunds ($2,708,806 received during the
Quarter).
`
Gold Hydrogen Limited – Quarterly Activities Report p. 11
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $276,930 for the Quarter (although some
payments made during the Quarter may relate to prior periods).
This report has been authorised for release by the Board.
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldhydrogen.com.au kschlobohm@goldhydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
Website: www.goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
Twitter: @GHY_ASX
Contact: info@goldhydrogen.com.au
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which
are outside the control of the Company and which are subject to change without notice and could
cause the actual results, performance or achievements of the Company to be materially different from
the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Nothing contained in this announcement, nor any information made available to you
is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past,
present or the future performance of Gold Hydrogen Limited.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 12
Appendix A
Overview of the Gold Hydrogen Group’s PEL, PELAs, GSELAs and EL
Permit
Project
Name
Gold
Hydrogen
Interest
Applicant
Geologic Area
& Basin
Size
(km2)
Term
Grant
Date
Application
Date
Expiry
Date
Status Act
PEL 687 Ramsay 100%
Gold
Hydrogen
Limited
Stansbury Basin
& Kanmantoo
Trough
7,820 5 years 22/7/21 - 21/07/26 Granted
PGEA
2000
EL 6988 Warooka 100%
Sustainable
Minerals
Group Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
542 6 years 10/4/24 - 9/4/30 Granted
MA
1971
PEL(A) 688 Kanmantoo 100%
Byrock
Resources
Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
9,962 5 years - 12/5/21 - Pending
PGEA
2000
PEL(A) 699 Robe 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Otway Basin
9,624 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 700 Padthaway 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Troubridge Basin
9,748 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 701 Troubridge 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Troubridge Basin
9,750 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 702 Renmark 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,563 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 703 Boucat 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,833 5 years - 3/8/22 - Pending
PGEA
2000
PEL(A) 704 Baratta 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,850 5 years - 19/7/21 - Pending
PGEA
2000
GSEL(A) 755 Maitland 100%
White
Hydrogen
Australia Pty
Ltd
Stansbury Basin 2,470 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 756 Yorketown 100%
White
Hydrogen
Australia Pty
Ltd
Stansbury Basin 2,272 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 757 Flinders 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Trough
1,780 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 758 Penneshaw 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Trough
1,585 5 years - 28/4/22 - Pending
PGEA
2000
PEL(A)792 Pirie 100%
Gold
Hydrogen
Limited
Torrens Hinge
Zone& Gawler
Province
1,960 5 years - 5/11/24 - Pending
PGEA
2000
Areas stated for applications are based on the Company’s submissions. These are subject to change by the Department without
notification for boundary re-alignments, exclude areas and competing applications (if applicable).
There were no changes for the current Quarter.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 13
Table 2 – Updated Listing Rule 5.30 Information (Preliminary)
Name: Ramsay 3
Location (UTM zone 53
GDA2020)
X 749096 mE
Y 6151186 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation Parara, Kulpara, Winulta and Hiltaba basement
Gross thickness and net pay
thickness
Total Gross Thickness of 200m – 16m for Parara Limestone, 155m for
Kulpara Formation, 29m for Winulta Formation
Geological rock type Limestones, Dolomites, Dolomitic Sandstones and fractured Granites
Depth of the zones tested 148-870m
Type of test and duration Calibrated mud gas log data and Isotubes
Phase recovered Gas
Other types of recovery N/A
Flow rates, choke size, volumes
recovered
N/A
Fracture stimulation N/A
Material non hydrocarbons Hydrogen, Helium, Nitrogen, CO2
Insufficient information is presently available to determine net pay thickness.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 14
Table 3 – Updated Listing Rule 5.30 Information (Preliminary)
Name: Ramsay 4
Location (UTM zone 53
GDA2020)
X 747787 mE
Y 6149863 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation
Parara, Kulpara Limestone, Kulpara Dolomite, Winulta Sandstone,
Hiltaba Basement
Gross thickness and net pay
thickness
Total Gross Thickness 168m – 28m for Parara Formation, 112m for
Kulpara Limestone, 27m for Winulta Formation, 1m for Hiltaba
Basement
Geological rock type Limestones, Dolomites, Dolomitic Sandstones, Granite Basement
Depth of the zones tested
Parara 160 – 450m, Kulpara Limestone 450 – 580m, Kulpara
Dolomite 580 – 760m.580-760, Winulta Sandstone 760 – 820m
Type of test and duration Calibrated mud gas log data, Isotubes, wireline log data
Phase recovered Gas/water
Other types of recovery N/A
Flow r