Highlights:
Exploration well testing operations, which are pioneering for both Natural Hydrogen and
Helium in a non-petroleum system, are set to commence today at the site of the Company’s
successful Ramsay 1 and Ramsay 2 exploration wells.
This is very much a new energy and resource play that Gold Hydrogen has confirmed with
historical data, and with its recent exploration and drilling results.
The Company’s Ramsay 1 and Ramsay 2 wells drilled late last year found Natural Hydrogen
at up to 86% purity, and Helium at up to 6.8% of raw gas, as previously reported.
The independent best estimate Prospective Resource for Natural Hydrogen on the
Company’s 100% owned PEL 687 is 1.3 billion kilograms, and for Helium the mean estimated
Prospective Resource is 96 billion cubic feet (Bcf) over approximately 25% of the tenement.
Refer Tables 1 and 2 for full details.
The Company has significant prospective resources with large-scale potential.
This is the start of a very exciting technical journey, and is not dissimilar to the eventual
success of existing world-renowned oil and gas energy projects, which took time to reach
their full potential.
The objectives of the exploration well tests are to obtain more samples of both Natural
Hydrogen and Helium for further specialist analysis in world-leading laboratories, and to
extract both Natural Hydrogen and Helium to surface.
Testing operations are expected to take most of March, with preliminary technical results
from the overall testing of both the Ramsay 1 and Ramsay 2 exploration wells program
expected by April, with further detailed laboratory analysis ongoing.
Results from the testing program will provide the Company with valuable information for
future drilling and well completion designs, for the future pilot program, and longer-term
commercialisation planning.
Planning continues on the Company’s broader 2024 work program, including a regional 2D
seismic program and the drilling of additional wells.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|1
The Directors of Gold Hydrogen Limited (Gold Hydrogen, ASX: GHY, the Company) are pleased to provide
an operational update on the Company’s groundbreaking Ramsay Project on the Yorke Peninsula,
prospective for both Natural Hydrogen and Helium.
Further Detail:
1. Overview of exploration testing operations on Ramsay 1 and Ramsay 2 wells:
Exploration well testing operations on the Ramsay 1 and Ramsay 2 wells are set to commence today. Well
testing experts, SGS Australia have supplied the flow back testing package which includes all pressure and
flow sensors and gas sampling equipment. Experienced gas contractors Well Pro and MPK have supplied
the coil tubing unit, plus the nitrogen pumping and wireline operations for the work. Well testing
operations are expected to take 2 to 3 weeks with extensive gas sampling to be conducted by SGS together
with Petro Lab and CSIRO. Gas samples will be sent to various local and international laboratories to have
full gas composition and noble gas isotope tests conducted. It is expected that these technical tests could
take several months to fully complete. Well testing experts ERCE have been engaged to provide an
independent review of the testing program, utilising experts in Perth and London.
2. Groundbreaking exploration testing for both Natural Hydrogen and Helium
This well testing program is the first dedicated Natural Hydrogen and Helium well test operation conducted
in Australia, and to the Company’s knowledge, it is likely one of only a few in the world.
The Company considers this to be the start of an exciting journey, which is not dissimilar to that undertaken
by world-renowned and ultimately successful oil and gas projects, like the early days in the CSG and shale
industries. For those particular resources, the exploration and completion techniques were developed
and optimised over time, improving project economics and ultimately leading to major projects being
developed. We anticipate a similar path forward for our Natural Hydrogen and Helium resources, although
the timeframe may be quicker as drilling and completions technologies developed for other gas resources
may be applicable to our Natural Hydrogen and Helium resources.
3. First key step on the journey to future commercialisation
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to commercialise over time.
There is very little data available for dedicated Hydrogen wells anywhere in the world due to the lack of
analogue wells. Accordingly, there is inherent uncertainty with regard to the expected outcomes of the
Ramsay 1 and Ramsay 2 exploration well testing program.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|2
To the Company’s knowledge, the only Natural Hydrogen field currently in production is located in Mali,
West Africa, where Natural Hydrogen production is used to power the small town of Bourakebougou. It
has been reported that the Natural Hydrogen wells in Mali do not have any decline in production and are
continually regenerating and producing at the same rate. 1
Helium is extremely valuable and indicatively, longer-term bulk pricing is expected to approximate USD450
per Mcf (thousand cubic feet). 2
Natural Hydrogen has a high energy content, and extracting it even in small quantities may prove
commercial for localised applications. Furthermore, given that Helium was also found within both the
Ramsay 1 and Ramsay 2 wells, being able to extract and process both gases in small quantities may provide
potential short-term commercial and / or proof of concept opportunities to help progress the Ramsay
Project.
4. Objectives of exploration flow testing
The primary objective of the Ramsay 1 and Ramsay 2 well testing program is to obtain gas samples for
compositional and technical analysis, which will be undertaken in third-party laboratories.
Secondary objectives of the well testing program are to extract both Natural Hydrogen and Helium to
surface, and to obtain formation fluid samples for analysis.
From the well testing data obtained, Gold Hydrogen will better understand the characteristics of the
Natural Hydrogen and Helium reservoirs, including an understanding of potential wellbore skin damage
from drilling. The data obtained will assist the Company in gaining technical insights into how the Ramsay
Project area could be further explored and appraised, including future well designs and testing designs, as
well as providing input for the future pilot plant design.
Although the final results of the well testing program may take several months to be received and
analysed, initial results around gas composition from the combined testing of the Ramsay 1 and Ramsay 2
exploration wells are expected to be available by April.
Gold Hydrogen Managing Director, Neil McDonald said: “We have found both Natural Hydrogen and
Helium in our Ramsay 1 and 2 wells at world class purities, and our prospective resource estimates indicate
the potential for very large quantities. We know the gases are there, and the start of exploration well
testing operations is a good first step to the potential future commercialisation of both Natural Hydrogen
and Helium in this region. We look forward to obtaining more samples and extracting the gases to surface,
which will be very valuable data and information for the future appraisal and further development of the
project”.
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with hydrocarbons”,
First Break Volume 40, October 2022 (available via www.goldHydrogen.com.au/technical-articles/ )
2
February 2024, www.noblehelium.com.au , quoting Konbluth Consulting.
1
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|3
Ongoing Activities
To progress the Ramsay project area and to further explore PEL 687, a large scale regional 2D seismic
project is being designed and costed. The objectives for the seismic program will be to help delineate the
size of the potential Hydrogen and Helium accumulation(s) and support the identification of future drilling
targets on the Yorke Peninsula.
Planning is also underway for further drilling activity later in 2024.
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated with
the Ramsay Project and the Company’s commercial and business objectives. These risks relate to the
presence, recovery and potential volumes of both Hydrogen and Helium, but also due to the location of
the resource within agricultural areas and the proximity to National Parks on both Yorke Peninsula and
Kangaroo Island, requiring significant landholder and community engagement. The worldwide, Federal
and South Australian Government and industry efforts to secure Hydrogen as an alternative energy source
provides confidence that any technical and social concerns may be overcome.
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class Natural Hydrogen and Helium
gases in a potentially extensive province in South Australia. This region has only recently had its Natural
Hydrogen and Helium potential confirmed by the Company via its maiden drilling campaign. The domestic
and global demand for Hydrogen and Helium, combined with new exploration techniques and experienced
personnel, provides Gold Hydrogen with an extraordinary opportunity to define and ultimately develop a
new Natural Hydrogen and Helium gas province.
The combined permit area of the Gold Hydrogen group is approximately 75,332km2. Gold Hydrogen holds
one granted exploration license (the Ramsay Project - PEL 687) and its two 100% owned subsidiary
companies (White Hydrogen Australia and Byrock Resources) hold an additional seven (7) applications for
Natural Hydrogen and Helium exploration within South Australia. Gold Hydrogen is also the preferred
applicant for four (4) gas storage exploration licenses applications (GSELA) covering an area of 8,107km2
within the Yorke Peninsula portion of PEL 687 in South Australia. These storage licence applications are in
addition to the granted exploration licence and application licences.
The group’s permit areas are characterised by low population densities, cooperative stakeholders and
aspects of the natural environment suited to the exploration and development of a future Natural
Hydrogen and Helium gas province. Gold Hydrogen places considerable importance on close liaison with
landholders, traditional owners and all other stakeholders, and this approach has led to the grant of its
key tenement PEL 687 in South Australia. The Company intends to continue to invest in these efforts.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|4
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be found
on the Company’s website (www.goldHydrogen.com.au) together with a copy of the Company’s
Replacement Prospectus of 29 November 2022.
Gold Hydrogen also has accounts on LinkedIn and Twitter (@GHY_ASX), and copies of market releases will
be emailed to all interested parties who register via info@goldHydrogen.com.au
*** - *** - ***
This announcement has been authorised for release by the Managing Director.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director
nmcdonald@goldHydrogen.com.au
+61 7 3521 8038
Karl Schlobohm – Company Secretary / CFO
kschlobohm@goldHydrogen.com.au
+61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Australian Public Affairs
mdoman@apa.au
+61 421 888 858
Prospective Resource Statements
The Prospective Resource Statements for Natural Hydrogen and for Helium have been included in this
announcement under the approval of Mr Billy Hadi Subrata, Chief Engineer for Gold Hydrogen, who is a
Qualified Petroleum Reserves and Resources Evaluator. Mr Hadi Subrata confirms that, as at the date of
this announcement, there is no change to information or additional information, since the effective dates,
that would materially change the estimates of prospective resources quoted.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|5
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown
risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside
the control of the Company and which are subject to change without notice and could cause the actual
results, performance or achievements of the Company to be materially different from the future results,
performance or achievements expressed or implied by such statements. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking statements or other forecast. Nothing contained
in this announcement, nor any information made available to you is, or and shall be relied upon as, a
promise, representation, warranty or guarantee as to the past, present or the future performance of Gold
Hydrogen Limited.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|6
Table 1 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept 2021
PEL
Prospects
PEL 687
All
Prospects
and Leads
SPE
PRMS
Subclass
2U
1U
Best
Low
Estimate Estimate
Mean
3U
High
Estimate
Pg
Pd
Pc
207
1,313
4,187
8,820
22% 48% 10%
Yorke
Peninsula
PEL 687
Ramsay FB
Prospect
124
931
2,712
6,989
22% 50% 11%
PEL 687
Ramsay Lst
Prospect
10
70
191
492
26% 50% 13%
PEL 687
Maitland
Lead
7
26
40
92
17% 35%
6%
Kangaroo
Island
PEL 687
Navigator
Lead
34
152
280
678
19% 40%
8%
PEL 687
Kanmantoo Prospect
32
134
237
569
25% 40% 10%
*This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the
notes in the Company’s ASX release of 13 January 2023.
It should be noted that the estimated quantities of Natural Hydrogen that may potentially be
recovered by the application of a future development project(s) relate to undiscovered
accumulations. These estimates have both an associated risk of discovery and a risk of
development. Further exploration, appraisal and evaluation is required to determine the existence
of a significant quantity of potentially recoverable Natural Hydrogen.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this announcement is based on, and fairly
represents, information and supporting documentation prepared by independent consultants “Teof
Rodrigues & Associates” with an effective date of 30 September 2021, and which forms part of the
Company’s Replacement Prospectus dated 29 November 2022. The Prospective Resource Statement,
together with all relevant notes, also appears in the Company’s ASX release of 13 January 2023.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|7
Table 2 – Prospective Resource Statement for Helium
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL
PEL
Prospects
687
PEL 687
PEL 687
SPE
PRMS
Subclass
Formation
1U
2U
Low
Best
Estimate Estimate
3U
Mean High
Estimate
Pg
All
Total
7
41
96
243
17% 60% 10%
Kulpara Formation
0.8
3.6
7.0
17.1
29% 60% 17%
Winulta Formation
0.1
0.6
1.6
4.0
12% 60% 7%
Fractured Basement
0.7
3.8
6.9
16.7
13% 60% 8%
Total
2
8
15
38
20% 60% 12%
Kulpara Formation
2.1
12.8
30.5
77.6
23% 60% 14%
Winulta Formation
0.3
2.4
7.7
19.8
8%
Fractured Basement
Prospect Hilbata Suite
1.6
10.3
25.5
65.2
12% 60% 7%
7.7
17.0
42.7
12% 60% 7%
33
81
205
16% 60% 10%
All
Prospects
Ramsay
Fault Block
South of
Ramsay
Fault Block
Prospect
Formations
Fractured Basement
1.4
Yorke Peninsula Heel
Total
5
Pd
Pc
60% 5%
*This estimate of Helium Prospective Resources must be read in conjunction with the notes in the
Company’s ASX release of 21 February 2024.
It should be noted that the estimated quantities of Helium that may potentially be recovered by the
application of a future development project(s) relate to undiscovered accumulations. These estimates
have both an associated risk of discovery and a risk of development. Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of potentially recoverable
Helium.
QPRRE Statement - Helium
The Prospective Resource Statement for Helium in this announcement is based on, and fairly represents,
information and supporting documentation prepared by independent consultants “Teof Rodrigues &
Associates” with an effective date of 21 February 2024, and which was announced by the Company on
that date together with the accompanying assumptions and notes.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldHydrogen.com.au | ABN 74 647 468 899
|8
Share your feedback
Discover