Helium Prospective Resource Report
Released
Released
Announcement PDF
21 February 2024
ASX Announcement
Ramsay Project
Helium Prospective Resource Report
Key Highlights:
Drilling results confirmed world-class helium concentrations of up to 6.8% in raw gas, as
previously reported.
Prospective Resource Report for helium obtained for a 2,000km2 area of the Company’s
flagship Ramsay Project on the Yorke Peninsula (refer Figure 1).
Mean estimate of 96 billion cubic feet (Bcf) of helium over approximately 25% of the Ramsay
Project area (PEL 687), which, if replicated across the tenement, would potentially make this
a world-class helium project. See Table 1 below for full details, including the high, low and
best estimates. The Company notes that the estimated quantities of helium that may
potentially be recovered by the application of a future development project(s) relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and
a risk of development. Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially recoverable helium.
Helium is extremely rare, valuable and cannot be man-made.
Future exploration flow testing and sample analysis planned for March 2024.
Further Detail:
1. November drilling results – world-class helium concentrations of up to 6.8% in raw gas:
GHY reported the November 2023 drilling results from MDT samples revealed very high helium
concentrations, reaching up to 6.8% in raw gas from the Kulpara Formation (refer ASX release of
6 December 2023).
The purity values encountered in the Company’s maiden drilling program potentially make the
Ramsay Project a world-class helium project if they are able to be replicated across the tenement.
2. Helium Prospective Resource Report:
Post-drill analysis of the helium results and the further data collected, which included the results
of fluid inclusion analysis of 31 core samples from historic wells across PEL 687 confirming the
presence of helium, has enabled independent certifiers to prepare a prospective resource report
for helium on Gold Hydrogen’s Ramsay Project.
The helium prospective resource report includes a Mean estimate of 96 Bcf of Helium (refer Table
1 below for full details, including the high, low and best estimates) calculated in accordance with
SPE-PRMS guidelines. The Company notes that the estimated quantities of helium that may
potentially be recovered by the application of a future development project(s) relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk
of development. Further exploration, appraisal and evaluation is required to determine the
existence of a significant quantity of potentially recoverable helium.
3. Potentially World-Class Helium Project:
Extracting helium from an area that has no petroleum system is potentially ground-breaking, as
currently 95% of helium is produced from petroleum and fossil fuel environments, making “green”
helium (ie. not derived as a by-product of a hydrocarbon development) an emerging opportunity. 1
Exploration flow testing will provide valuable data and assist with confirming helium
concentrations and flow rates.
4. Current and future testing:
Samples were meticulously collected during drilling of the Ramsay 1 and Ramsay 2 wells.
Schlumberger (now SLB) collected the samples, and independent validation by a specialised thirdparty laboratory ensured the credibility of results via analysis. Testing of those samples is ongoing,
and the collection of new data and samples during flow testing of the wells will help the Company
better understand the components that make up the helium bearing gas.
Well testing for both Ramsay 1 and 2 is scheduled for March 2024, with the objective to collect
fluid and gas samples, measure gas compositions, pressures and flow rates, to support a future
appraisal and development strategy, as well as the potential proof-of-concept facility design.
5. Commercial analysis:
Helium is extremely rare and expensive, with markets generally determining pricing on a contract
by contract basis. Indicatively, longer-term bulk pricing is expected to approximate USD450 per
Mcf (thousand cubic feet). 2
Global helium demand was estimated to be around 6 billion cubic feet (Bcf) in 2023, with annual
demand expected to increase at a rate of 3% to 5% per annum. 3
6. Exploration Potential:
Despite only two wells being drilled in the Ramsay Project area, multiple data points indicate the
potential for a laterally extensive hydrogen reservoir and a prolific helium system at the Ramsay
Project site. Subsequent exploration, analysis and future flow testing will provide a clearer picture
of this promising opportunity.
“About Helium” www.noblehelium.com.au
February 2024 www.noblehelium.com.au, quoting Kornbluth Consulting.
3
“The 2023 Worldwide Helium Market” Gasworld US Edition, October 2023.
1
2
In response to the helium prospective resource report, Gold Hydrogen’s Managing Director Neil
McDonald said:
“The world-class results for the Ramsay Project continue with Gold Hydrogen being able to obtain this
prospective resource report for helium. Our independent certifiers have been able to review all the
historical and current data. To have them assess and report that we have 96 Bcf of helium (Mean) on the
Ramsay Project, which only covers an area which is 25% of this granted permit, is an exceptional result and
a huge value add to our Company.
Considering that helium projects are commercial around the world from 1% purity and we have 6.8% purity
raw gas from recent exploration results, combining this with a market where helium is expected on a longer
term basis to sell for approximately USD$450 per Mcf, we may very well have a world-class helium project,
and one with scale.
We are incredibly pleased with the helium results, as we consider they can only further enhance the Ramsay
Project, which has identified multiple target zones for both hydrogen and helium.”
Helium Uses
Helium has many industrial, medical and technical uses, as outlined below:
Although Gold Hydrogen is in the early stages of its exploration program, the Company considers its
Ramsay Project has the potential to become a world-class natural hydrogen and helium development. As
previously reported, the real time mud gas analysis in Ramsay 2 recorded the presence of high helium
concentrations within the mud gas while drilling the Kulpara Formation, the Winulta Formation, and the
Fractured Basement (see Figure 2). Two MDT samples recovered from 778mMD at the base of the Kulpara
Formation contained 6.8% and 6.1% helium as part of the raw gas composition.
Gold Hydrogen engaged Teof Rodrigues and Associates (TRA) as independent certifiers to estimate the
Prospective Helium Resources within the Ramsay Project area on the Yorke Peninsula based on the results
of Ramsay 1 & 2 and other regional data points suggesting a regional helium source. Table 1 shows the
results of application of the industry standard assessment method (SPE-PRMS) to estimate the helium
resources.
Table 1 – Helium Prospective Resources within the Ramsay Project area and PEL 687
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL
Prospects
PEL 687
All
Prospects
PEL 687
PEL 687
Ramsay
Fault Block
South of
Ramsay
Fault Block
SPE
PRMS
Subclass
Prospect
Formation
1U
2U
Low
Best
Estimate Estimate
3U
MEAN High
Estimate
Pg
All
Total
7
41
96
243
17% 60% 10%
Kulpara Formation
0.8
3.6
7.0
17.1
29%
60%
17%
Winulta Formation
0.1
0.6
1.6
4.0
12%
60%
7%
Fractured Basement
0.7
3.8
6.9
16.7
13%
60%
8%
Total
2
8
15
38
20%
60%
12%
Kulpara Formation
2.1
12.8
30.5
77.6
23%
60%
14%
Winulta Formation
0.3
2.4
7.7
19.8
8%
60%
5%
1.6
10.3
25.5
65.2
12%
60%
7%
Fractured Basement
Yorke Peninsula Heel
1.4
7.7
17.0
42.7
12%
60%
7%
Total
5
33
81
205
16%
60%
10%
Formations
Fractured Basement
Prospect Hilbata Suite
Pd
* These Helium Prospective Resources are estimated quantities of helium that may potentially be
recovered by the application of a future development project(s) relate to undiscovered accumulations.
These estimates have both an associated risk of discovery (Pg) and a risk of development (Pd). Further
exploration, appraisal and evaluation is required to determine the existence of a significant quantity of
potentially recoverable helium.
Pc
Notes to Table 1
(1) This table presents Gold Hydrogen's Prospective Resources for Helium in the Ramsay Field of Yorke
Peninsula only. Gold Hydrogen currently has no Reserves and no Contingent Resources.
(2) Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS
2018. SPE have provided guidance regarding the Extension of PRMS Principles to NonHydrocarbon/Non-Traditional Situations including Helium (and Hydrogen).
Refer: https://www.spe.org/en/industry/reserves/non-hydrocarbons/
(3) Per ASX LRs 5.28.4&5 estimates are unrisked and aggregated arithmetically by category, hence
caution that the aggregate low estimate may be a very conservative estimate and the aggregate high
estimate may be a very optimistic estimate due to the portfolio effects of arithmetic summation.
(4) Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the "full
distribution" and has not been truncated by application of the MEPS (minimum economic pool size)
concept.
(5) The Reference Point is at the wellhead/edge of lease (ie. wellhead facilities) so the estimates have no
deduction for flare, vent or fuel consumed in operations.
(6) Pg (Chance of geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality =
Pg x Pd) are calculated as a weight average of the P50's of the Helium Bcf (Billion Cubic Feet) of the
prospect formations.
(7) Pg incorporates Play Risk and Prospect Risk.
(8) Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (ie. not just economics).
(9) Information in the table and throughout the Report is rounded. Some totals in the tables may not
add due to rounding.
(10) Gold Hydrogen owns 100% of PEL 687 which has been issued under South Australian legislation.
QPRRE Statement
The Prospective Resource Statement in this announcement is based on, and fairly represents, information
and supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” (Mr
Teof Rodrigues, Mr Paul Strong and Mr Greg Horton) and Mr Billy Hadi Subrata, Chief Technical Officer for
Gold Hydrogen, with an effective date of 21 February 2024.
The Prospective Resource Statement has been included in this announcement:
(1) under the approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, who is a
Qualified Petroleum Reserves and Resources Evaluator; and
(2) with the prior written consent of Mr Billy Hadi Subrata and “Teof Rodrigues & Associates” (Mr Teof
Rodrigues, Mr Paul Strong and Mr Greg Horton) as to the form and context in which the helium
prospective resource statement and supporting information are presented.
The employment and professional organisation membership details of Mr Billy Hadi Subrata, Mr Teof
Rodrigues, Mr Paul Strong and Mr Greg Horton are as follows:
Name
Billy Hadi Subrata
Teof Rodrigues
Paul Strong
Greg Horton
Employer
Gold Hydrogen
Teof Rodrigues & Associates
Teof Rodrigues & Associates
Teof Rodrigues & Associates
Professional organisation
SPE
SPE, PESA
GSL, AAPG, PESA
SPE
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated with
the Ramsay Project and the Company’s commercial and business objectives. These risks relate to the
presence, recovery, and potential volumes of both hydrogen and helium, but also due to the location of
the resource within agricultural areas and the proximity to National Parks on both Yorke Peninsula and
Kangaroo Island, requiring significant landholder and community engagement.
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinions. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown
risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside
the control of the Company and which are subject to change without notice and could cause the actual
results, performance or achievements of the Company to be materially different from the future results,
performance or achievements expressed or implied by such statements. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking statements or other forecast. Nothing
contained in this announcement, nor any information made available to you is, or and shall be relied upon
as, a promise, representation, warranty or guarantee as to the past, present or the future performance of
Gold Hydrogen Limited.
Figure 1 – Map outlining the on-shore location of the Prospective Resource Report for Helium
Figure 2 – Ramsay 2 well with the helium and hydrogen continuous mud gas logs
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class natural hydrogen and helium
gases in a potentially extensive province in South Australia. This region has recently had its natural
hydrogen and helium potential confirmed by the Company as a result of its successful maiden drilling
campaign. The domestic and global demand for hydrogen and helium, combined with new exploration
techniques and experienced personnel, provides Gold Hydrogen with an extraordinary opportunity to
define and ultimately develop a new natural hydrogen and helium gas province.
The combined permit area of the Gold Hydrogen group is approximately 75,332km2. Gold Hydrogen holds
one granted petroleum exploration license (the Ramsay Project - PEL 687) and its two 100% owned
subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an additional seven (7)
applications for natural gas exploration within South Australia.
Gold Hydrogen is also the preferred applicant for four (4) gas storage exploration licenses applications
(GSELA) covering an area of 8,107km2 within the Yorke Peninsula portion of PEL 687 in South Australia.
These storage licence applications are in addition to the granted exploration licence and application
licences.
The group’s permit areas are characterised by low population densities, cooperative stakeholders and
aspects of the natural environment suited to the exploration and development of a future natural
hydrogen and helium gas province. Gold Hydrogen places considerable importance on close liaison with
landholders, traditional owners and all other stakeholders, and this approach has led to the grant of its
key tenement PEL 687 in South Australia. The Company intends to continue to invest in these efforts.
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be found
on the Company’s website (www.goldhydrogen.com.au) together with a copy of the Company’s
Replacement Prospectus of 29 November 2022.
Gold Hydrogen also has accounts on LinkedIn and Twitter (@GHY_ASX), and copies of market releases will
be emailed to all interested parties who register via info@goldhydrogen.com.au
*** - *** - ***
This announcement has been authorised for release by the Board of Directors.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
+61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – H/Advisors APA
mdoman@hadvisorsapa.au
+61 421 888 858
Karl Schlobohm – Company Secretary / CFO
kschlobohm@goldhydrogen.com.au
+61 7 3521 8038
Share your feedback
Discover