Quarterly Activities Report for the Period Ended 30 June 2023
GOLD HYDROGEN LTD (ASX:GHY)
Shares on Issue
140 million
Market Capitalisation
A$38m (at A$0.275 per share)
HIGHLIGHTS
Airborne geophysical survey conducted by Xcalibur
Multiphysics and the experimental soil gas survey
conducted by CSIRO both conducted and completed
during the Quarter. Analysis and interpretation of
results expected in the September Quarter.
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Multiple land access arrangements have been secured
on the mainland area of the Ramsay Project, including
at the site of the historic Ramsay Oil Bore 1, where the
Company plans to twin the historic well which
encountered high-purity hydrogen.
Company Secretary
Karl Schlobohm
Planning and procurement for the Company’s maiden
drilling program is well advanced, including securing
the services of Savanna Energy and SLB (formerly
Schumberger).
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
For Media Enquiries Contact:
Matthew Doman – Australian Public Affairs
mdoman@apa.au
+61 421 888 858
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn:
Twitter:
Gold Hydrogen Ltd
@GHY_ASX
Dr Josh Whitcombe appointed as COO with effect from
1 July 2023.
EXPLORATION AND TECHNICAL ACTIVITIES
General
Gold Hydrogen is focused on the discovery and development of
world class natural hydrogen gas in a potentially extensive
natural hydrogen province in South Australia. This region has only
recently had its natural hydrogen potential identified by Gold
Hydrogen. The domestic and global demand for hydrogen,
combined with new natural hydrogen exploration techniques
and experienced personnel, provides Gold Hydrogen with an
extraordinary opportunity to define and ultimately develop a
new natural hydrogen gas province.
The combined natural hydrogen permit area of the Gold
Hydrogen group is approximately 75,332km2. Gold Hydrogen
holds one granted petroleum exploration license (PEL 687) and
its two 100% owned subsidiary companies (White Hydrogen
Australia and Byrock Resources) hold an additional seven (7)
applications for natural hydrogen exploration within South
Australia (refer Figure 1).
Gold Hydrogen is also the preferred applicant for four (4) gas
storage exploration license applications (GSELA) covering an
additional 8,107km2 within the renewable energy zone of PEL 687
of the Yorke Peninsula region of South Australia. A summary of
the status of the group’s tenure is outlined in Appendix A.
Gold Hydrogen Limited – Quarterly Activities Report
Figure 1 – Gold Hydrogen Group tenement and areas under application located in South Australia.
The Group’s permit areas are characterised by low population densities, cooperative stakeholders and
aspects of the natural environment suited to the exploration and development of a future natural
hydrogen gas province. Gold Hydrogen places considerable importance on close liaison with
traditional owners and all other stakeholders, and this approach has led to the grant of its key
tenement PEL 687 in South Australia.
Stage 1 Airborne Survey
During the Quarter, the Company’s contractor Xcalibur Multiphysics undertook the acquisition of an
18,200-line km airborne gravity-magnetic survey over the mainland component of the Ramsay Project
(PEL 687 – refer Figure 2).
The survey was designed to enhance subsurface understanding of rich natural hydrogen source rocks,
structures, and identifying future well locations to mature the independently assessed Best Estimate
Prospective Resource of 1.3 billion kilograms of natural hydrogen gas in PEL 687 (refer Prospective
Resource Statement in Table 1).
Gold Hydrogen Limited – Quarterly Activities Report
p. 2
Figure 2 – Ramsay Project – Stage 1 Airborne Survey, PEL 687
The data from the survey is in the process of being analysed by an independent expert so that it can
be interpreted and integrated with Gold Hydrogen’s static and dynamic subsurface models, and
integrated with other datasets. Often after this is complete, the resulting elevated subsurface
definition across the surveyed area can be broken down into geological domains, prioritized by
prospectivity, and also act as guide for future activities, which enables operations to be more focused
and less impactful to surface owners and the community.
CSIRO – Experimental Gas Survey Research Activity
During the Quarter, and as part of the Company’s research activities on the Ramsay Project, the
Commonwealth Scientific and Industrial Research Organisation (CSIRO) undertook Stage 1 of an
experimental surface-oriented soil-gas survey. Stage 1 of the survey was designed to test certain areas
of the mainland component of the Ramsay Project.
Up to 80 locations were identified for soil-gas sampling based upon recently completed reprocessed
2D seismic, the generation of the subsurface static model, near existing occurrences of natural
hydrogen from historic wellbores, and distributed across various subsurface hydrogen source rocks,
basement faults and possible seeps or fairy circles.
Gold Hydrogen Limited – Quarterly Activities Report
p. 3
This research and development activity may ultimately provide data that could assist in providing a
guide for future exploration activities, supporting the generation of additional drilling inventory leads
for maturation to prospects. However, whilst the soil-gas survey may provide a guide, drilling is
required to validate the extent of hydrogen in the subsurface, and this is planned for Q4, 2023.
The results of the Stage 1 experimental program, once available, will be primarily qualitative and will
require further works to quantify in the Stage 2 soil-gas survey that is tentatively scheduled for late
2023 - early 2024. Stage 1 results may help to guide Stage 2 workflows and scheduling which involve
setting up ground-based detection systems that will take long-term in-situ measurements from any
positive results discovered during Stage 1.
The subsurface modelling (undertaken by Schlumberger), the airborne survey (undertaken by
Xcalibur), the CSIRO soil-gas survey and ongoing fluid-inclusion lab workflows, coupled with the drilling
program plan are designed to highlight areas of higher prospectivity, and to support the guidance of
future work program activities for the maturation of the independently assessed Best Estimate
Prospective Resource of natural hydrogen gas in PEL 687 (refer Table 1).
Land Access Arrangements
During the Quarter a number of multi-year land access arrangements were agreed, providing the
Company with a range of locations for its initial exploration well, as well as options for subsequent
exploration wells. Importantly, land access has been secured at the site of the historic Ramsay Oil
Bore 1 near Minlaton on the Yorke Peninsula where historic occurrences of natural hydrogen were
encountered at up to 89% purity.
This enables the Company to deliver against its objective of ‘twinning’ the original well, as its initial
exploration drilling will be located adjacent to the historic well where occurrences of natural hydrogen
were encountered.
Major Drilling Suppliers Secured
Following the end of the Quarter, the Company announced that it had secured drilling and services
contracts with internationally recognised SLB (formerly Schlumberger) and Savanna Energy Services
(Savanna Energy) for its maiden drilling campaign.
International Drilling Contractor, Savanna Energy has been engaged to provide drilling services for the
Company’s first exploration well on the Ramsay Project, which is designed to replicate the results of
the historic Ramsay Oil Bore 1 which encountered natural hydrogen of up to 89% purity (on an aircorrected basis). Savanna Energy has extensive international and domestic experience in drilling
minimal disturbance conventional and unconventional wells in prime agricultural areas of
Queensland.
The Company believes that this minimal disturbance style of drilling will mitigate any disruptions and
impacts within the local community.
SLB, who have been involved with the Ramsay Project from inception, will continue to provide their
specialist services which include geological services, mud logging and wireline services, as well as
cementing services for the well. This builds on the geological support Gold Hydrogen has received
from SLB over the past 2 years. SLB is a world class oil and gas service company and will bring their
knowledge and experience to the Ramsay Project.
Gold Hydrogen Limited – Quarterly Activities Report
p. 4
Permitting and Community Engagement
The environmental approval documentation (Environmental Impact Report and Statement of
Environmental Objectives) was prepared during the Quarter, with drafts submitted to the South
Australian Department of Energy and Mines. As part of this process, the Company undertook regular
stakeholder engagement and community engagement processes, with all feedback received being
positive and supportive of the project. Feedback from the community engagement process will be
included in the environmental approval documentation, with the formal request for approval to be
submitted in the coming weeks.
Ramsay Project Objectives
From a technical perspective, the primary objectives of the Ramsay Project are to:
(i) progress its natural hydrogen Prospective Resources to Contingent Resources and/or Reserves.
This will involve the processes of discovery, appraisal and commercialisation; and
(ii) mature portions of the granted title PEL 687 to Production Licence areas.
Historically, natural hydrogen gas was recovered in three samples taken in Ramsay Oil Bore 1 drilled
in 1931. The samples were taken at depths of 240.8m, 262.1m and 507.8m, all indicated as being
within the Cambrian Parara Limestone. The Company’s Prospective Resource Statement is outlined
below in Table 1.
The first exploration well to be drilled by Gold Hydrogen is being designed and located to verify the
findings of the historic Ramsay Oil Bore 1 in order to mature the historical occurrences of natural
hydrogen to a ‘discovery’ for resource evaluation and reporting purposes. Exploration wells need to
be drilled, evaluated and tested to determine the presence, producibility, extent and thus ‘discovery’
of hydrogen from the geological reservoirs.
It is important to note that there are both geological and potential development risks associated with
the Ramsay Project and the Company’s objectives as outlined above. These risks relate to the
presence, producibility and potential volumes of hydrogen, but also due to the location of the
resource within agricultural areas and the proximity to National Parks on both Yorke Peninsula and
Kangaroo Island, requiring significant landholder and community engagement. The worldwide,
National and South Australian Government and industry efforts to secure hydrogen as an alternative
energy source provides confidence that any technical and social concerns may be overcome.
CORPORATE ACTIVITIES
During the Quarter, Mr Luke Titus resigned as a Director and the COO of the Company. On 14 June
2023 the Company announced that it had appointed Dr Josh Whitcombe to the COO position with
effect from 1 July 2023.
Dr Whitcombe was most recently the Chief Operating Officer of WestSide Corporation. He
commenced his career with Shell International drilling offshore developments in the North Sea before
moving to coal seam gas exploration and development in Australia, initially with Santos.
Prior to WestSide, Dr Whitcombe was the Chief Operating Officer at Blue Energy, an ASX-listed CSG
exploration and appraisal company. He has broad industry experience, managing operations from
frontier exploration and appraisal projects to integrated brown field conventional assets.
Gold Hydrogen Limited – Quarterly Activities Report
p. 5
In addition to his oil and gas experience, he holds a Bachelor’s Degree and a PhD in Environmental
Engineering together with an MBA, giving him a strong awareness and understanding of
environmental, community and commercial issues. Dr Whitcombe is a Chartered Chemical Engineer
(UK), and a Registered Professional Engineer of Queensland (RPEQ).
FINANCIAL REPORTING
Exploration expenditures that were capitalised relate to the Company’s flagship Ramsay Project (PEL
687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure
Airborne and seismic surveys and sub-surface studies
Environmental and permitting costs
Native Title, land access and licence fees
Drilling and related activities
Total
Amount
$1,130,944
$120,517
$69,164
$421,956
$1,742,581
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $253,253 for the June Quarter (although
some payments made during the June Quarter related to prior periods, and this Quarter also includes
an amount for payment in lieu of notice).
Reporting Against IPO Use of Funds
Gold Hydrogen Limited – Quarterly Activities Report
p. 6
Table 1 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept 2021
PEL
Prospects
PEL 687
All Prospects
and Leads
SPE PRMS
Sub-class
1U
Low
Estimate
2U
Best
Estimate
Mean
3U
High Estimate
Pg
Pd
Pc
207
1313
4187
8820
22%
48%
10%
Yorke
Peninsula
PEL 687
Ramsay FB
Prospect
124
931
2712
6989
22%
50%
11%
PEL 687
Ramsay Lst
Prospect
10
70
191
492
26%
50%
13%
PEL 687
Maitland
Lead
7
26
40
92
17%
35%
6%
PEL 687
Navigator
Lead
34
152
280
678
19%
40%
8%
PEL 687
Kanmantoo
Prospect
32
134
237
569
25%
40%
10%
Kangaroo
Island
*This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the notes in the
Company’s ASX release of 13 January 2023.
The Company confirms that it is not aware of any further new information or data that materially affects the
estimates of Natural Hydrogen Prospective Resources (as originally estimated on 30 September 2021), and
that all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
It should be noted that the estimated quantities of Natural Hydrogen that may potentially be recovered by
the application of a future development project(s) relate to undiscovered accumulations. These estimates
have both an associated risk of discovery and a risk of development. Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of potentially recoverable Natural
Hydrogen.
This report has been authorised for release by the Board.
For Company Enquiries Contact:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
+61 7 3521 8038
Karl Schlobohm – Company Secretary / CFO
kschlobohm@goldhydrogen.com.au
+61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Australian Public Affairs
mdoman@apa.au
+61 421 888 858
Gold Hydrogen Limited – Quarterly Activities Report
p. 7
Website:
LinkedIn:
Twitter:
Contact:
www.goldhydrogen.com.au
Gold Hydrogen Ltd
@GHY_ASX
info@goldhydrogen.com.au
QPRRE Statement
The Prospective Resource Statement in this report is based on, and fairly represents, information and
supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with
an effective date of 30 September 2021, and which forms part of the Company’s Replacement
Prospectus dated 29 November 2022. The Prospective Resource Statement, together with all relevant
notes, also appears in the Company’s ASX release of 13 January 2023.
The Prospective Resource Statement has been included in this report under the approval of Mr Billy
Hadi Subrata, Chief Engineer for Gold Hydrogen, who is a Qualified Petroleum Reserves and Resources
Evaluator. Mr Hadi Subrata confirms that, as at the date of this report, there is no change to
information or additional information, since the effective date of 30 September 2021, that would
materially change the estimates of prospective resources quoted.
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class natural hydrogen gas in a
potentially extensive natural hydrogen province in South Australia. The domestic and global demand
for hydrogen, combined with new natural hydrogen exploration techniques and experienced
personnel, provides Gold Hydrogen with an extraordinary opportunity to define and ultimately
develop a new natural hydrogen gas province.
The combined natural hydrogen permit area of the Gold Hydrogen group is approximately 75,332km2.
Gold Hydrogen holds one granted petroleum exploration license (PEL 687) and its two 100% owned
subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an additional seven (7)
applications for natural hydrogen exploration within South Australia. Gold Hydrogen also has four (4)
gas storage licence applications (GSLAs) within its granted PEL 687 covering an additional 8,107km2.
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which
are outside the control of the Company and which are subject to change without notice and could
cause the actual results, performance or achievements of the Company to be materially different from
the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Nothing contained in this announcement, nor any information made available to you
is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past,
present or the future performance of Gold Hydrogen Limited.
Gold Hydrogen Limited – Quarterly Activities Report
p. 8
Appendix A
Overview of the Gold Hydrogen Group’s PEL, PELAs and GSELAs
As a result of corporate acquisition, tenement applications made by White Hydrogen Australia and Byrock
Resources (as outlined above) became part of the Gold Hydrogen “group” during the Quarter.
The only granted tenement at 30 June 2023 was the 100% owned Ramsay Project tenement of PEL 687.
Gold Hydrogen Limited – Quarterly Activities Report
p. 9
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Gold Hydrogen Limited
ABN
Quarter ended (“current quarter”)
74 647 468 899
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(1,743)
(4,347)
(b) development
-
-
(c) production
-
-
(d) staff costs*
(170)
(248)
(e) administration and corporate costs
(271)
(1,974)
-
-
19
19
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (net GST and other tax refunds)
(103)
116
1.9
Net cash from / (used in) operating
activities (rounded)
(2,267)
(6,433)
* The Company may subsequently reclassify some staff costs to exploration & evaluation assets.
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(4)
(14)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (cash on hand received upon
acquisition of subsidiaries)
-
-
2.6
Net cash from / (used in) investing
activities
(4)
(14)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
20,000
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(1,143)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (payment of interest to convertible
noteholders on conversion)
-
(396)
3.10
Net cash from / (used in) financing
activities
-
18,461
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
18,543
4,259
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(2,267)
(6,433)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(4)
(14)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
18,461
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
16,272
16,272
Current quarter
$A’000
Previous quarter
$A’000
5,243
11,509
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (term deposits and bank guarantee)
11,029
7,035
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
16,272
18,543
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
253
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(2,267)
8.4
Cash and cash equivalents at quarter end (item 4.6)
16,272
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(2,267)
-
16,272
7.18
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
13 July 2023
Authorised by: Karl Schlobohm, Company Secretary / CFO
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover