Ramsay 2026 Exploration Well Testing Campaign
Operational Update
Highlights:
Testing campaign for Gold Hydrogen’s Ramsay exploration wells to commence in
approximately a week, testing the potential flow of Natural Hydrogen and Helium to
surface from the Ramsay 1, 2 and 3 exploration and appraisal wells.
Early civil works, site preparation and mobilisation of well test equipment are well
advanced ahead of the operational aspects of the campaign.
Campaign is now moving towards execution phase with key regulatory approvals secured,
and SWS Rig 04 acceptance expected at the Ramsay 1 wellsite in the coming days.
Ramsay 1 flow testing expected to commence shortly thereafter, delivering the first flow
data from the 2026 campaign -targeting Helium to surface with flow rate, pressure
monitoring, sampling and lab analysis data.
Previous exploration well testing conducted at Ramsay 1 in 2024 demonstrated Helium
purities of up to 36.9%1; that test utilised a 180bbl/day mechanical pump whereas the 2026
Ramsay 1 flow test will utilise a 2,000bbl/day electric submersible pump (ESP).
This 2026 testing campaign scope also includes subsequent zonal testing of Natural
Hydrogen and Helium bearing reservoirs in Ramsay 2 using a 2,000bbl/day ESP, and in
Ramsay 3 using a 20,000bbl/day ESP.
A recent commercial assessment by Worley, and the opportunity to book contingent
resources upon the successful completion of the Ramsay flow test campaign are expected
to provide the foundation for accelerated development planning in line with the Company’s
identified commercialisation pathways, specifically including Helium production.
1 Refer ASX announcement of 17 October 2024. Technical Table 1 appended.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 2
Gold Hydrogen Managing Director, Neil McDonald said: “Commencing mobilisation for our 2026 Ramsay
flow test campaign is a significant milestone for Gold Hydrogen and reflects an enormous amount of
planning and preparation by our team and contractors. Flow testing is a key near term catalyst for the
Ramsay Project, and we look forward to gathering flow data that will underpin the next phase of de-risking
and development planning for our world-leading Natural Hydrogen and Helium project.”
The Directors of Gold Hydrogen Limited (Gold Hydrogen, ASX: GHY, the Company) are pleased to advise
that the Company has commenced mobilisation and site preparation for its 2026 Ramsay flow test
campaign, with the first flow testing of the Ramsay 1 well expected to commence as early as next week.
Operational Update
The 2026 Ramsay flow test campaign has moved firmly into implementation phase, with site preparation
works well advanced and mobilisation of equipment and crews to site now underway. Final system
integration testing of electrical equipment, including Electric Submersible Pumps (ESP’s) and a Variable
Speed Drive (VSD), is currently being carried out in Adelaide, with shipping scheduled to site next week for
installation and field checks before the commencement of flow testing at Ramsay 1.
Key regulatory approvals, including early works and groundwater reinjection approvals, have been
received, and the Company expects SWS Rig 04 workover rig acceptance at the Ramsay 1 wellsite in the
coming days.
Mobilisation of equipment at the Ramsay Project in preparation for the upcoming flow testing campaign
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 3
Electric Submersible Pump (ESP) for Ramsay 1 and Ramsay 2 well flow test rated to a maximum fluid flow
rate of 2,000bbl/day undergoing factory acceptance tests
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 4
Ramsay Flow Test Campaign Scope
Prior drilling and well testing campaigns at Ramsay have confirmed exceptional gas purity results, with air-
corrected Natural Hydrogen purities of up to 97%2
and air-corrected Helium purities of up to 36.9%3
,
together with formation evaluation results supporting the continuity of the Natural Hydrogen and Helium
bearing reservoirs across the broader project area.
The 2026 Ramsay flow test campaign is designed to assess the Natural Hydrogen and Helium flow potential
of the Ramsay Project, building on the Company’s successful drilling and associated evaluation activities
to date.
The campaign will focus on the flow testing of three (3) wells – Ramsay 1, Ramsay 2 and Ramsay 3 over a
period of up to three (3) months. Flow testing will be supported by ESPs and temporary surface flow test
facilities, and will also include the zonal testing of specific Natural Hydrogen and Helium bearing reservoirs.
A key objective of the campaign is to measure sustained flow rates across prospective Natural Hydrogen
and Helium formations, and to provide the data required to accelerate the Company’s ongoing commercial
assessment studies.
The previous 2024 exploration well testing program utilised a 180bbl/day mechanical pump, whereas the
2026 flow test campaign will be utilising a 2,000bbl/day ESP for Ramsay 1 and Ramsay 2. Due to the larger
wellbore sizing specifically planned at the time of drilling, the Ramsay 3 well will be tested utilizing a
20,000bbl/day ESP.
Results from the campaign will be a key catalyst for the Ramsay Project, underpinning the Company’s
ongoing evaluation of its potential commercialisation pathways, as detailed in its previous release of 20
May 2026. Further objectives from the campaign include gathering sufficient data to potentially book
contingent resources, planning for future field development activities, and ultimately the progression of
Front-End Engineering Design (FEED) activities.
Gold Hydrogen will provide further updates to the market as the campaign progresses.
2 Refer ASX announcement of 2 December 2025. Technical Table 2 appended.
3Refer footnote 1
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 5
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be found
on the Company’s website (www.goldhydrogen.com.au).
Gold Hydrogen also has accounts on LinkedIn and Twitter (@GHY_ASX), and copies of market releases will
be emailed to all interested parties who register via info@goldhydrogen.com.au
*** - *** - ***
This announcement has been authorised for release by the Managing Director.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldhydrogen.com.au kschlobohm@goldhydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewsrtrategy.com
+61 421 888 858
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including aspirational forward-plans, projections, forecasts and estimates, are provided as a
general guide only and should not be relied on as an indication or guarantee of future performance and
involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors,
many of which are outside the control of the Company and which are subject to change without notice
and could cause the actual results, performance or achievements of the Company to be materially
different from the future results, performance or achievements expressed or implied by such statements.
Past performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or other
forecast. Nothing contained in this announcement, nor any information made available to you is, or and
shall be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the
future performance of Gold Hydrogen Limited.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 6
Table 1 – Sample Analysis Table – Ramsay 1 Well – Stage 2 (Originally Published 17 October 2024)
Name: Ramsay 1
Location (UTM zone 53 GDA2020)
X 748,208.07
Y 6149545.7
Permit PEL687
Entity holders Gold Hydrogen 100%
Zones tested Zone 2 and 3
Resources Helium
Formation Kulpara Dolomite
Gross thickness and net pay
thickness
180m Gross
Geological rock type Dolomite
Depth of the zones tested 900 mMD
Type of test Commingled pressure test
Phase recovered Gas/Water
Corrected H2 and He concentration
in gas recovered from downhole
sample
36.9% He
Flow rates, choke size, volumes
recovered
1 Mscf/day gas constraint by pump capacity
and flow intermittently with water; choke size
20/64 inch; volumes recovered 0.55 Mscf
Fracture stimulation None
Material non hydrocarbons Nitrogen, Hydrogen
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 7
Table 2 – Listing Rule 5.30 Information (Preliminary) (Originally Published 2 December 2025)
Name: Ramsay 3
Location (UTM zone 53
GDA2020)
X 749096 mE
Y 6151186 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation Parara, Kulpara, Winulta and Hiltaba basement
Gross thickness and net pay
thickness
85m gross
Geological rock type
Limestones, Dolomites, Dolomitic Sandstones and fractured
Granites
Depth of the zones tested 148-870m
Type of test and duration Calibrated mud gas log data and Isotubes
Phase recovered Gas
Other types of recovery N/A
Flow rates, choke size, volumes
recovered
N/A
Fracture stimulation N/A
Material non hydrocarbons Hydrogen (at 97% air-corrected purity), Helium, Nitrogen, CO2
Insufficient information is presently available to determine net pay thickness.