Gold Hydrogen Limited – Quarterly Activities Report
Quarterly Activities Report for the Period Ended
31 December 2025
GOLD HYDROGEN LTD (ASX:GHY)
Shares on Issue
180,454,285
Market Capitalisation
A$76m (at A$0.42 per share)
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Company Secretary / CFO
Karl Schlobohm
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
Company Contacts:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
Karl Schlobohm – Company Secretary
kschlobohm@goldhydrogen.com.au
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Company Information:
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
X: @GHY_ASX
HIGHLIGHTS FOR THE DECEMBER QUARTER
Successful drilling and completion of the Ramsay 3 and
Ramsay 4 wells, designed to appraise specific
formations within identified structures.
The well design for the 2025 / 26 campaign includes a
larger diameter well bore to enable greater flexibility
for well testing in Q1, 2026. The results of the drilling
and well testing campaign are expected to inform
potential future pilot project area(s) and design(s),
with the aim of demonstrating the commercial
potential of both Natural Hydrogen and Helium from
the Ramsay Project.
At Ramsay 3, elevated levels of Natural Hydrogen were
confirmed by the SLB DQ1000 gas detector in the
Parara Limestone, whilst Helium was similarly
confirmed at elevated levels at several depths within
the Kulpara Dolomite formation.
Natural Hydrogen purities of up to 97% (air corrected)
were confirmed by initial laboratory analysis of
samples taken from the Ramsay 3 well within the
Parara Limestone formation.
Ramsay 4 was drilled 500m away from Ramsay 2, and
successfully penetrated a number of highly porous and
permeable zones within the Parara, Kulpara and
Winulta Formations.
The confirmation of Natural Hydrogen and Helium at
both the Ramsay 3 and Ramsay 4 wells confirms the
potential continuity of the Natural Hydrogen and
Helium systems within the Parara Limestone and
Kulpara Dolomite sections of the Ramsay Project.
Full laboratory results and analysis of composition and
purities for both wells are ongoing.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 2
EXPLORATION AND TECHNICAL ACTIVITIES
General Background
Gold Hydrogen is focused on the discovery and development of Natural Hydrogen and Helium gases
in a potentially extensive and world class Natural Hydrogen and Helium province in South Australia.
The forecast domestic and global demand for Hydrogen, combined with new Natural Hydrogen
exploration techniques and experienced personnel, provides Gold Hydrogen with an extraordinary
opportunity to define and ultimately develop a new Natural Hydrogen gas province. Further to this,
Helium is extremely rare and expensive, there is limited world-wide production, and no production of
Helium in Australia at present. Gold Hydrogen is well placed to potentially prosper from this
opportunity.
The combined gas-related permit area of the Gold Hydrogen group exceeds 75,000km2
. Gold
Hydrogen holds one granted exploration license (the Ramsay Project - PEL 687) and one application
area, whilst its two 100% owned subsidiary companies (White Hydrogen Australia and Byrock
Resources) hold an additional seven (7) applications for Natural Hydrogen and Helium exploration
within South Australia. Gold Hydrogen is also the preferred applicant for four (4) gas storage
exploration licenses applications (GSELA) covering an area approximating 8,000km2
within the Yorke
Peninsula portion of PEL 687 in South Australia. These storage licence applications are in addition to
the granted exploration licence and application licences.
A summary of the status of the group’s petroleum, mineral and storage licence tenure at the end of
the Quarter is outlined in Appendix A.
2025 Drilling Campaign – Background and Objectives
Following Gold Hydrogen’s successful drilling campaign in late 2023, the Company continued its
exploration activities during the Quarter, drilling both the Ramsay 3 and Ramsay 4 wells within PEL
687 on the Yorke Peninsula. These wells were prioritised amongst numerous targets to appraise
specific formations within identified structures, chosen with reference to the results of the maiden
drilling and testing campaign, as well as the interpretations leading from the 2D seismic survey
conducted in the second half of 2024 (refer Figure 1).
The primary objectives for the 2025 drilling program were to:
1. delineate and confirm the presence of Natural Hydrogen and Helium beyond the successful
Natural Hydrogen and Helium gas shows at the Company’s Ramsay 1 and 2 wells;
2. provide optimal wellbore parameters for well testing and extracting Natural Hydrogen and Helium
to surface;
3. mature the Ramsay Project via further appraisal in preparation for potential commercial
development decisions; and
4. assist with the development of a blueprint for future exploration and appraisal initiatives across
the Company’s wider portfolio.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 3
The Ramsay 1 and 2 exploration wells were designed with small diameter well bores and a 4 ½” casing
to keep costs as low as practical whilst still being able to run logging tools to gather data, and to
specifically verify the presence of Natural Hydrogen adjacent to the historic 1931 Ramsay Oil Bore
location. In the Company’s 2023 drilling campaign, not only was the presence of Natural Hydrogen
confirmed (at air-corrected purity levels up to 95.8%1), the presence of Helium was also confirmed (at
air-corrected purity levels up to 36.9%2), as well as elevated levels of Helium-33, significantly adding
to the potential commercialisation options for the Ramsay Project.
Following the positive drilling results from drilling the Ramsay 1 and 2 wells, the Company carried out
well testing activities to gain knowledge of the reservoir characteristics. Much data was gathered and
the findings from those 2024 tests has also contributed to the well design for this 2025 / 26 program.
The well design for the 2025 drilling campaign included a larger diameter well bore with 7” casing to
enable greater flexibility for subsequent well testing. The data expected to be gathered from the
drilling and testing of the wells in the Company’s 2025 / 26 program will inform potential future pilot
project area(s) and design(s), with the aim of demonstrating the commercial production potential of
both Natural Hydrogen and Helium from the Ramsay Project.
Figure 1: Location of the Ramsay 4 well in relation to the Ramsay 1 and Ramsay 2 wells drilled by
the Company in 2023
1
Refer ASX release of 27 May 2024 for full details. Technical table also appended.
2
Refer ASX release of 17 October 2024 for full details. Technical table also appended.
3
Refer ASX release of 30 October 2024 for full details. Technical tables also appended.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 4
Figure 2: Gold Hydrogen PEL 687 and PELA’s located in South Australia
`
Gold Hydrogen Limited – Quarterly Activities Report p. 5
2025 Drilling Campaign – Initial Results
Ramsay 3 Well
The Ramsay 3 well, located 2.3km from the Ramsay 1 and Ramsay 2 well sites, was spudded on 10
November 2025, and ultimately drilled to a total depth of 884m on 27 November 2025.
On 24 November 2025, the Company announced that elevated levels of Natural Hydrogen were
confirmed by the SLB DQ1000 gas detector in the Parara Limestone, whilst Helium was similarly
confirmed at elevated levels at several depths within the Kulpara Dolomite formation. This confirmed
the potential continuity of the Natural Hydrogen and Helium systems within the Parara Limestone and
Kulpara Dolomite sections of the Ramsay Project.
On 2 December 2025, the Company announced initial laboratory results of up to 97%4
purity (air
corrected) Natural Hydrogen from the Parara Limestone formation within the Ramsay 3 well.
Furthermore, the Company reported that gas responses in Ramsay 3 correlate with key intervals in
Ramsay 2, confirming the potential continuity of these zones up-dip across ~2.3 km, significantly
strengthening the geological model for a laterally persistent Natural Hydrogen and Helium system.
The Company is awaiting the full suite of sample results from Petrolab in Adelaide for the Ramsay 3
well.
Ramsay 4 Well
The Ramsay 4 well, located approximately 500m to the north of the Ramsay 2 well, was spudded on 3
December 2025, and ultimately drilled to a total depth of 855m on 13 December 2025.
Ramsay 4 successfully penetrated a number of highly porous and permeable zones within the Parara,
Kulpara and Winulta Formations. Formation evaluation of Ramsay 4 highlighted strong lateral
correlation with the Natural Hydrogen and Helium bearing formations that were sampled and tested
in Ramsay 1 and 2. This preliminary interpretation highlights the potential for a significant Natural
Hydrogen and Helium resource base for the Ramsay Project.
A full suite of high-quality wireline logs including Nuclear Magnetic Resonance (NMR), acoustic and
resistivity imaging logs was acquired. Multiple samples of mud-gas were taken throughout the Parara
Limestone formation, and wellhead gas samples were also collected while drilling continued below a
mud losses zone encountered at approximately 330m. This zone is interpreted to be the same interval
penetrated in Ramsay 1 which showed excellent fracture connectivity and provides confidence for the
potential of future flow testing.
Wireline logs from all four wells drilled to date indicate excellent correlation and the potential for
formation continuity across the Ramsay Project area. This interpretation will form the basis for future
volumetric assessments and potential Ramsay field development plans. The Natural Hydrogen and
Helium bearing reservoir properties in the Ramsay Project also appear to be aligned with other global
Natural Hydrogen and Helium field developments based on the preliminary technical analysis of the
wireline logs.
The Company is awaiting the full suite of sample results from Petrolab in Adelaide for the Ramsay 4
well.
4
Refer ASX release of 2 December 2025 for full details. Technical table also appended.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 6
Images: Ramsay 4 wellsite during drilling
`
Gold Hydrogen Limited – Quarterly Activities Report p. 7
Ramsay Project – 2026 Exploration Well Testing Campaign – Background and Objectives
The Company intends to test Ramsay 3, and potentially Ramsay 4, during 2026. The detailed planning
for well testing continues, and will be refined based on an analysis of the full suite of results from
drilling. Preparations for the well testing program are currently scheduled to commence in Q1 2026,
subject to receiving necessary approvals. The objective of the well testing includes the movement of
both Natural Hydrogen and Helium to surface under conditions designed to support conceptual
designs and studies for one or more pilot projects to demonstrate potential project viability for both
Natural Hydrogen and Helium production, and to gather further data from the sampling of fluid and
gas during the testing operations.
Regional Application Areas – Preliminary Studies
The Company continues to progress several of its application areas towards granted status via the
ongoing advancement of Native Title related matters. In addition, the Company continues with its
desktop analysis of the publicly available South Australian Resource Information Gateway (SARIG)
datasets, as well as a range of historical information, to compile a preliminary subsurface data suite,
specifically including a fluid-inclusion sampling program, as outlined in the Company’s September 2025
Quarterly Activities Report.
The focus of this activity is on transposing the learnings to date from the Ramsay Project to identify
Natural Hydrogen exploration focus areas within its regional application portfolio in South Australia.
The results of the fluid inclusion studies will be combined with an analysis of the Geoscience Australia
seismic data available to assist with the delineation of areas of interest and future drill targets across
the application area portfolio.
Formal on-groundwork programs will commence on each application area as they are granted.
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Groundbreaking Exploration Testing for Both Natural Hydrogen and Helium
The Ramsay Project well testing program was the first dedicated Natural Hydrogen and Helium well
test operation conducted in Australia, and to the Company’s knowledge, it is likely one of only a few
in the world. The Company considers this to represent the initial steps of an exciting journey, which
is not dissimilar to that undertaken by various world-renowned and ultimately successful oil and gas
projects, such as the early days in the CSG and shale industries. For those particular resources, the
exploration and completion techniques were developed and optimised over time, improving project
economics and ultimately leading to major projects being developed. The Company anticipates a
similar path forward for its Natural Hydrogen and Helium prospective resources, although the
timeframe may be quicker as drilling and completions technologies developed for other gas resources
may be applicable to its Natural Hydrogen and Helium projects.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 8
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to be potentially developed
over time.
There is very little data available for dedicated Natural Hydrogen wells anywhere in the world due to
the lack of analogue wells. To the Company’s knowledge, the only Natural Hydrogen field currently in
production is located in Mali, West Africa, where Natural Hydrogen production is used to power the
small town of Bourakébougou. It has been reported that the Natural Hydrogen wells in Mali do not
have any decline in production and are continually regenerating and producing at the same rate.5
Helium is extremely valuable and indicatively, longer-term bulk pricing is expected to be up to USD450
per Mcf (thousand cubic feet).6
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate
to the presence, recovery, and potential volumes of Natural Hydrogen and Helium, but also due to the
location of the current and potential project sites within agricultural areas and proximal to National
Parks on both the Yorke Peninsula and Kangaroo Island, requiring significant landholder and
community engagement. The worldwide, Federal and South Australian Government and industry
efforts to secure Hydrogen as an alternative energy source provides confidence that any technical and
social concerns may be overcome.
CORPORATE ACTIVITIES
During the Quarter preliminary discussions continued with a range of industry parties interested in
mid- and / or down-stream commercialisation opportunities for Natural Hydrogen and / or Helium
gases.
One area of significant focus is the potential for the ultimate development of a green methanol
project.
Ramsay Project – Green Methanol Feasibility Study
Green methanol is a key fuel choice for decarbonising shipping and aviation because it is liquid at room
temperature, making it easier to store and transport than gaseous Hydrogen, and its use in existing or
easily converted engines results in significant lifecycle CO2 emission reductions. Major shipping
companies are currently ordering methanol-ready ships, and investing in green methanol production
to meet net-zero targets.
The Yorke Peninsula is very well placed to be a global green methanol production hub with abundant
waste agricultural biomass (biogenic carbon) and renewable energy sources. Critical to the production
of green methanol is cost-competitive Hydrogen, which the Company is striving to bring to
commercialisation via its Ramsay Natural Hydrogen and Helium Project.
5
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with
hydrocarbons”, First Break Volume 40, October 2022 (available via www.goldhydrogen.com.au/technical-
articles/)
6
February 2024, www.nobleHelium.com.au, quoting Konbluth Helium Consulting.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 9
The production of green methanol made using Natural Hydrogen is expected to have commercially
competitive advantages over green methanol produced via electrolysis-derived (ie. man-made)
Hydrogen, based on the evidence available from the Bourakebougou Natural Hydrogen Field in Mali.
Gold Hydrogen’s Ramsay Project has a significant prospective resource of Natural Hydrogen which it
is aiming to advance via the technical programs outlined above.
An initial analysis of the biogenic carbon sources in and around the Yorke Peninsula indicate a readily
available supply of up to 1.5 million wtpa (wet tonnes per annum) of compliant biomass7
.
Furthermore, long-term renewable energy pricing (solar / wind / BESS (battery energy storage
systems)) indicates that a project on the Yorke Peninsula can be supplied at economic rates via the
electricity network8
. Port infrastructure and capacity is also available on the Yorke Peninsula (eg. Port
Giles, Ardrossan) for importing and exporting activities.
Gold Hydrogen plans to assess all of these factors in detail and complete a Feasibility Assessment of
the green methanol opportunity, and – as previously reported - has appointed Mr Simon Talbot to
help spearhead this initiative. Based on the results of the Feasibility Assessment, a pilot plant will be
considered and costed for initial production.
Current Green Methanol pricing is USD850-1,050 per tonne9
, and is already in use within the
international shipping industry.
The Company will provide more detailed updates on this initiative once the Feasibility Assessment
commences.
Ramsay Project – Helium Engineering Study
Another area of focus is the potential commercialisation of Helium gases, as Australia is solely reliant
on Helium imports for critical activities in medical, AI / datacentre and defence fields. The air-
corrected purity levels of Helium detected to date at the Ramsay Project are world class, and on the
back of these results, Gold Hydrogen has tendered for engineering services to undertake commercial
and production modelling. Worley have been successful and commissioned to undertake these works.
The Company will provide more detailed updates on the Green Methanol and Helium Engineering
Study initiatives once further progress has been made.
7
South Australian Crop and Pasture Report 2024-25, January 2025.
8
Australian Energy Market Operator, 2024 ELI Report, June 2024 (Appendix 5 – South Australia).
9
Methanol Institute: Methanol Institute (2024). "Economic Value of Methanol for Shipping under FuelEU
Maritime and EU ETS." Analysis by Dr. Jeroen Dierickx.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 10
FINANCIAL REPORTING
Exploration expenditures that were outlaid during the Quarter primarily relate to the Company’s
flagship Ramsay Project (PEL 687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure Amount
Airborne and seismic surveys and sub-surface studies $228,614
Environmental and permitting costs $181,672
Native Title, land access and licence fees $104,863
Drilling and related activities $6,080,788
Total $6,595,937
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $213,565 for the Quarter (although some
payments made during the Quarter may relate to prior periods).
This report has been authorised for release by the Board.
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldhydrogen.com.au kschlobohm@goldhydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
Website: www.goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
Twitter: @GHY_ASX
Contact: info@goldhydrogen.com.au
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which
are outside the control of the Company and which are subject to change without notice and could
cause the actual results, performance or achievements of the Company to be materially different from
the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Nothing contained in this announcement, nor any information made available to you
is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past,
present or the future performance of Gold Hydrogen Limited.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 11
Appendix A
Overview of the Gold Hydrogen Group’s PEL, PELAs, GSELAs and EL
Permit
Project
Name
Gold
Hydrogen
Interest
Applicant
Geologic Area
& Basin
Size
(km2)
Term
Grant
Date
Application
Date
Expiry
Date
Status Act
PEL 687 Ramsay 100%
Gold
Hydrogen
Limited
Stansbury Basin
& Kanmantoo
Trough
7,820 5 years 22/7/21 - 21/07/26 Granted
PGEA
2000
EL 6988 Warooka 100%
Sustainable
Minerals
Group Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
542 6 years 10/4/24 - 9/4/30 Granted
MA
1971
PEL(A) 688 Kanmantoo 100%
Byrock
Resources
Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
9,962 5 years - 12/5/21 - Pending
PGEA
2000
PEL(A) 699 Robe 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Otway Basin
9,624 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 700 Padthaway 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Troubridge Basin
9,748 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 701 Troubridge 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Troubridge Basin
9,750 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 702 Renmark 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,563 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 703 Boucat 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,833 5 years - 3/8/22 - Pending
PGEA
2000
PEL(A) 704 Baratta 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark Trough
9,850 5 years - 19/7/21 - Pending
PGEA
2000
GSEL(A) 755 Maitland 100%
White
Hydrogen
Australia Pty
Ltd
Stansbury Basin 2,470 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 756 Yorketown 100%
White
Hydrogen
Australia Pty
Ltd
Stansbury Basin 2,272 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 757 Flinders 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Trough
1,780 5 years - 28/4/22 - Pending
PGEA
2000
GSEL(A) 758 Penneshaw 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Trough
1,585 5 years - 28/4/22 - Pending
PGEA
2000
PEL(A)792 Pirie 100%
Gold
Hydrogen
Limited
Torrens Hinge
Zone& Gawler
Province
1,960 5 years - 5/11/24 - Pending
PGEA
2000
Areas stated for applications are based on the Company’s submissions. These are subject to change by the Department without
notification for boundary re-alignments, exclude areas and competing applications (if applicable).
There were no changes for the current Quarter.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 12
Table 1: Summary of Ramsay 2 - Stage 1 Testing (released in original form on 27 May 2024)
Name: Ramsay 2
Location (UTM zone 53 GDA2020)
X 747,761.61
Y 6149371.41
Permit PEL687
Entity holders Gold Hydrogen 100%
Zones tested MDT zone, Zone 2 and 3 Zone 4 to 8
Resources Helium Hydrogen
Formation Kulpara Dolomite Kulpara/Parara Limestone
Gross thickness and net pay
thickness
180m Gross 406m Gross
Geological rock type Dolomite Limestone
Depth of the zones tested
612m, 642m, 712m, 754m,
and 777.5mMD
197m, 289m, 346.5m,
385m, and 531mMD
Type of test
Commingled test on zone 2
and 3 for few hours followed
by overnight build up
Pressure test on single
zone for few hours
followed by overnight build
up
Phase recovered Gas/Water Gas/Water
Corrected H2 and He concentration
in gas recovered from downhole
sample
Up to 17.5% He Up to 95.8% H2
Flow rates, choke size, volumes
recovered
TBA in next extended flow test in Q2/Q3 2024
Fracture stimulation None None
Material non hydrocarbons Nitrogen, Hydrogen Nitrogen, Helium
`
Gold Hydrogen Limited – Quarterly Activities Report p. 13
Table 2: Ramsay 1 and 2 – Stage 2 well test (released in original form on 2 August 2024 and 17 October
2024)
Name: Ramsay 1 Ramsay 2
Location (UTM zone 53 GDA2020)
X 748,208.07 747,761.61
Y 6149545.7 6149371.41
Permit PEL687 PEL 687
Entity holders Gold Hydrogen 100% Gold Hydrogen 100%
Zones tested Zone 2 and 3 Zone 7 and 8
Resources Helium Hydrogen
Formation Kulpara Dolomite Parara Limestone
Gross thickness and net pay thickness 180m Gross 406m Gross
Geological rock type Dolomite Limestone
Depth of the zones tested 900 mMD 197mMD and 289mMD
Type of test Commingled pressure test Commingled pressure test
Phase recovered Gas/Water Gas/Water
Corrected H2 and He concentration in
gas recovered from downhole sample
36% He Up to 42% (still increasing)*
Flow rates, choke size, volumes
recovered
1 Mscf/day gas constraint by
pump capacity and flow
intermittently with water;
choke size 20/64 inch;
volumes recovered 0.55 MScf
0.5 Mscf/day gas constraint by pump
capacity with continuous flow with
water; choke size 128/64 inch;
volumes recovered 1.02 MScf
Fracture stimulation None None
Material non hydrocarbons Nitrogen, Hydrogen Nitrogen, Helium
`
Gold Hydrogen Limited – Quarterly Activities Report p. 14
Table 3: Summary of Helium-4 (4
He) and Helium-3 (3
He) Results (Oxford University) in Ramsay 2
(released in original form on 30 October 2025)
Name: Ramsay 2
Location UTM zone 53 GDA2020
X 747,707.85
Y 6149385.46
Permit PEL687
Entity holders Gold Hydrogen 100%
Zones tested
Zone
1_sample
11
Zone 2-
3_sample
19
Zone
4_sample 32
Zone
5_sample 46
Zone
6_sample 62
Zone
7_sample 79
Resources
Hydrogen-
Helium
Helium Hydrogen Hydrogen Hydrogen Hydrogen
Formation Basement Kulpara Fm Kulpara Fm
Parara
Limestone
Parara
Limestone
Parara
Limestone
Gross
thickness and
net pay
thickness
>200m
Gross
180m
Gross
155m Gross 406m Gross 406m Gross 406m Gross
Geological
rock type
Basement Dolomite Limestone Limestone Limestone Limestone
Depth of the
zones tested
1002 mMD 712mMD 530 mMD 384 moms 343 mMD 289 mMD
Type of test Noble gas abundance and isotopic quantification
Phase
recovered
Gas Gas Gas Gas Gas Gas
[4
He],
ccSTP/ccSTP
3
He/4
He
R/Ra
3
He ppt
1.44E-07
3.23E-07
0.23
0.05
6.52E-04
9.26E-09
0.0066
6.04
4.21E-08
1.72E-06
1.2306
0.07
5.54E-07
6.84E-08
0.0489
0.04
3.05E-08
1.55E-06
1.11
0.05
1.59E-07
7.57E-07
0.5408
0.12
Flow rates,
choke size,
volumes
recovered
N-A. Laboratory test of discrete samples
Fracture
stimulation
None None None None None None
Material non-
hydrocarbons
N2, H2, He,
CO2
N2, H2, He,
CO2
N2, H2, He,
CO2
N2, H2, He,
CO2
N2, H2, CO,
CO2
N2, H2, He,
CO2
`
Gold Hydrogen Limited – Quarterly Activities Report p. 15
Table 4: Summary Table of Helium-4 (4
He) and Helium-3 (3
He) results (Oxford University) in Ramsay
1 (released in original form on 30 October 2025)
Name: Ramsay 1
Location UTM zone 53 GDA2020
X 748,208.07
Y 6149545.7
Permit PEL687
Entity
holders
Gold Hydrogen 100%
Zones tested Zone 1_sample 8
Zone 2-3_sample
109451
Zone 2-3_sample
109477
Resources Hydrogen-Helium Helium Helium
Formation Basement Kulpara Fm Kulpara Fm
Gross
thickness and
net pay
thickness
>200m Gross 180m Gross 180m Gross
Geological
rock type
Basement Dolomite Dolomite
Depth of the
zones tested
970 mMD 900 mMD 900 mMD
Type of test Noble gas abundance and isotopic quantification
Phase
recovered
Gas Gas Gas
[4
He],
ccSTP/ccSTP
3
He/4
He
R/Ra
3
He ppt
3.42E-04
9.65E-09
0.0069
3.30
5.34E-02
9.31E-09
0.0067
497.39
9.59E-02
9.39E-09
0.0067
900.51
Flow rates,
choke size,
volumes
recovered
N-A. Laboratory test of discrete samples
Fracture
stimulation
None None None
Material non-
hydrocarbons
N2, H2, He, CO2 N2, H2, He, CO2 N2, H2, He, CO2
`
Gold Hydrogen Limited – Quarterly Activities Report p. 16
Table 5: Listing Rule 5.30 Information (Preliminary) (released in original form on 4 December 2025)
Name: Ramsay 3
Location (UTM zone 53
GDA2020)
X 749096 mE
Y 6151186 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation Parara, Kulpara, Winulta and Hiltaba basement
Gross thickness and net pay
thickness
85m gross
Geological rock type
Limestones, Dolomites, Dolomitic Sandstones and fractured
Granites
Depth of the zones tested 148-870m
Type of test and duration Calibrated mud gas log data and Isotubes
Phase recovered Gas
Other types of recovery N/A
Flow rates,