Annual Report to Shareholders
Released
Released
Announcement PDF
Gold Hydrogen Limited
ABN 74 647 468 899
Annual Financial Report
30 June 2025
Gold Hydrogen Limited
Corporate directory
30 June 2025
Directors
Alexander Downer - Non-Executive Chairman
Neil McDonald - Managing Director
Katherine Barnet - Non-Executive Director
Roger Cressey - Executive Director
Company secretary
Karl Schlobohm
Registered office and
principal place of business
Level 14
110 Eagle Street
Brisbane
QLD 4000
Share register
MUFG Corporate Markets (AU)
Level 12
680 George Street
Sydney
NSW 2000
Phone: 1300 554 474
Auditor
BDO Audit Pty Ltd
Level 10
12 Creek Street
Brisbane
QLD 4000
Solicitors
Gadens
111 Eagle Street
Brisbane
QLD 4000
Bankers
National Australia Bank Limited
259 Queen Street
Brisbane
QLD 4000
Stock exchange listing
Gold Hydrogen Limited shares are listed on the Australian Securities Exchange (ASX
code: GHY)
Website
www.goldhydrogen.com.au
Corporate Governance Statement
www.goldhydrogen.com.au/corporate-governance/
1
Gold Hydrogen Limited
Chairman's Letter
30 June 2025
Dear Shareholders
I am pleased to be writing to you after the successful conclusion to the Company’s strategic investment process, which had
been running for many months during 2024 and 2025.
Following an extensive seven-month due diligence process, which attracted significant interest from numerous
international groups, Gold Hydrogen selected Toyota Motor Corporation, Mitsubishi Gas Chemical and ENESOS Xplora as
key strategic investors based on their innovation and leadership in hydrogen, helium, energy and transport technologies.
As shareholders may be aware, the three parties invested a combined total of $14.5 million into Gold Hydrogen in July
2025 at a 22% premium to the prevailing share price. We are thrilled to have these well-respected companies on board
with us, and we look forward to exploring avenues for further collaborative opportunities into the future.
Australia and Japan have had a very long and symbiotic relationship involving trade and investment in the energy
sector. The Japanese Government has announced energy policies aimed to achieve carbon neutrality and the reduced use
of fossil fuels. In particular, Japan is actively pursuing a Hydrogen-based society with a robust Hydrogen supply chain for
various applications, including power generation, fuel cells and transportation.
The funds invested by our strategic partners will be utilized in the conduct of the Company’s upcoming 2025 / 26 drilling
and well testing campaign, as we aim to unlock further knowledge about the Ramsay Project and its future
commercialization potential.
In addition, the investment establishes a strategic collaboration focused on evaluating long-term opportunities across the
Natural Hydrogen and Helium value chain, including:
● Exploration, extraction and ultimately production at Gold Hydrogen’s flagship Ramsay Project in South Australia;
● Evaluation of potential Hydrogen supply opportunities for mobility and industrial uses, together with transportation
fuel cell and power generation platforms;
● Collaboration on a review of existing and emerging technologies regarding the potential for future Natural Hydrogen
purification and utilisation, and potential associated R&D projects;
● Investigation of potential future commercialisation pathways, including green methanol production.
In addition to the upcoming field activities at the Ramsay Project, the parties will consider the potential for further
investment opportunities, technical collaboration, downstream opportunities and offtake arrangements.
Our sponsoring broker, Morgans Corporate Limited assisted with the framing and conduct of the strategic investment
process, as did Mizuho Securities of Japan, with whom we signed a Memorandum of Understanding in July of 2024. I would
like to sincerely thank both parties for their continued support of the Company.
In closing I would like to recognise my fellow Directors and the Company’s management team for their tireless efforts over
the past twelve months in progressing Gold Hydrogen’s corporate and project-related initiatives. I look forward to sharing
with you the results of the upcoming work programs. Thanks also to the Company’s shareholders, suppliers and
stakeholders who have shown faith in us and supported our journey to date. The coming year will be an important one for
all of us as we strive to become the first Australian company to prove the commercial production potential of Natural
Hydrogen.
Yours sincerely
The Hon Alexander Downer
Non-Executive Chairman
2
Gold Hydrogen Limited
Directors' report
30 June 2025
The Directors present their report, together with the financial statements, on the consolidated entity (referred to hereafter
as the 'Group') consisting of Gold Hydrogen Limited (referred to hereafter as Gold Hydrogen, 'the Company' or 'parent
entity') and the entities it controlled at the end of, or during, the year ended 30 June 2025.
Directors
The following persons were Directors of Gold Hydrogen Limited during the whole of the financial year and up to the date
of this report, unless otherwise stated:
- Alexander Downer (Non-Executive Chair)
- Neil McDonald (Managing Director)
- Katherine Barnet (Non-Executive Director)
- Roger Cressey (Executive Director)
Principal activities
The Group is focused on the discovery and development of natural hydrogen and helium gas projects in a potentially
extensive province in South Australia. There was no change to the principal activities of the Group during the year.
Dividends
There were no dividends paid, recommended or declared during the current or previous financial year.
Review of operations
The loss for the Group after providing for income tax amounted to $2,241,100 (30 June 2024: $1,861,788 loss).
Industry and Corporate Overview
The Group is focused on the discovery and development of Natural Hydrogen and Helium gases in a potentially extensive
and world class Natural Hydrogen and Helium province in South Australia. The forecast domestic and global demand for
Hydrogen, combined with new Natural Hydrogen exploration techniques and experienced personnel, provides Gold
Hydrogen with an extraordinary opportunity to define and ultimately develop a new Natural Hydrogen gas
province. Further to this, Helium is extremely rare and expensive, there is limited world-wide production, and no
production of Helium in Australia at present. Gold Hydrogen is well placed to potentially prosper from this opportunity.
Natural Hydrogen (known as gold or white Hydrogen) is Hydrogen gas that occurs naturally, generated by geological
processes, and offers significant cost and emissions advantages relative to other means of Hydrogen production. Helium
is a relatively rare gas and cannot be man-made. Hence it is considered to be extremely valuable.
The combined permit area of the Gold Hydrogen group exceeds 75,000km2. Gold Hydrogen holds one granted exploration
license (the Ramsay Project - PEL 687) and one application area, whilst its two 100% owned subsidiary companies (White
Hydrogen Australia and Byrock Resources) hold an additional seven (7) applications for Natural Hydrogen and Helium
exploration within South Australia. Gold Hydrogen is also the preferred applicant for four (4) gas storage exploration
licenses applications (GSELA) covering an area approximating 8,000km2 within the Yorke Peninsula portion of PEL 687 in
South Australia. These storage licence applications are in addition to the granted exploration licence and application
licences.
Whilst the broad industry drivers of the forecast demand for Hydrogen remain in place, the supply-side of the Hydrogen
industry has undergone a series of changes over the past 12-18 months. A number of proponents and projects focussed
on the production of man-made “green” Hydrogen have found the forecast costs of production uneconomic, and a number
of planned initiatives have subsequently been shelved or cancelled. This has re-focussed industry attention on the potential
for Natural Hydrogen, due to its emerging economic advantages, and with significantly less reliance on the need for power
and infrastructure.
Continued advancements in technologies are driving the expected demand for both Hydrogen and Helium, as outlined
below in Figure 2. Opportunities are emerging for the use of Hydrogen in sustainable heavy transportation fuels, including
shipping and aviation. Helium is increasingly being sought as a cooling agent for electronic and computer-driven
technologies, and it is expected that Helium-3 will be required for cooling in future quantum computing applications.
3
Gold Hydrogen Limited
Directors' report
30 June 2025
Figure 1 – Gold Hydrogen Group gas tenement and areas under application located in South Australia.
Figure 2 – Key trends driving the anticipated future demand for hydrogen and Helium
4
Gold Hydrogen Limited
Directors' report
30 June 2025
Corporate and Project Objectives
The Group is currently the leading Australian proponent for the exploration, discovery and development of a Natural
Hydrogen and Helium project (or projects) in Australia.
Based on the historical drill data, historical seismic and petroleum well bore data, and further technical study and
assessment of various geological features of the Yorke Peninsula (e.g. stratigraphy, petrology, etc), the Ramsay Project has
an independently estimated Prospective Resource for Natural Hydrogen as outlined in Table 2 below.
In addition, based on the Helium results obtained from the Company’s maiden drill program, and the consideration of
further data collected across the Yorke Peninsula - which included the results of fluid inclusion analysis of core samples
from historic wells confirming the presence of Helium – the Company published its maiden Prospective Resource Report
for Helium, as outlined in Table 3 below.
The Group’s overall project plan follows a typical traditional path for the maturation of an exploration play through the
following stages:
(i) undertake exploration and appraisal activities to confirm the existence of the resource and demonstrate the
commercial viability of the project;
(ii) project development which involves drilling of production wells and installation of surface facilities for delivery to
market;
(iii) the production of Natural Hydrogen and Helium and sale to various market consumers. Potential options for the
monetisation of hydrogen include onsite electricity generation, pure hydrogen generation and distribution,
distribution to local ammonia plants, hydrogen transportation via pipelines or truck, use as a key ingredient in green
methanol production, and storage applications. Helium can be bottled on site and sold into the domestic Australian
market via one of the major distributors.
With regard to its flagship Ramsay Project, the Group’s short-term ongoing commercial and technical objectives are to:
(i) continue to validate the occurrences of Natural Hydrogen and Helium commencing with the Yorke Peninsula via further
exploration and appraisal;
(ii) demonstrate that Natural Hydrogen and/or Helium is present in sufficient volumes to be extracted for commercial
use; and
(iii) dependent on results, progress designs and preliminary plans for a proof-of-concept pilot plant.
In this regard the Group has undertaken a series of further exploration activities and analyses as outlined in Summary of
Operational Activities outlined below.
Summary of Operational Activities
Stage 2 Exploration Well Testing Summary – Ramsay 1 & 2 Exploration Wells
The Stage 2 exploration well testing commenced in July 2024, and involved the mobilisation of existing specialised
equipment to lift the water in the Ramsay 1 and 2 well bores. This method is standard in testing with a single completion
via a pump attached with the tubing for the water to flow, and an annulus to produce a free gas. At surface, the gas from
both systems was recombined downstream of a separator, with combined gas volume and flow rate measurement. The
dewatering process was undertaken within the constraints of the environmental approval conditions issued by the South
Australian government.
The testing results indicated increasing levels for purities of both Natural Hydrogen and Helium measured by equipment
at surface. As depicted in Figure 3 for Natural Hydrogen from the Ramsay 2 well, the shallow Hydrogen zone showed an
increasing trend for daily recorded levels of Natural Hydrogen (corrected for air contamination) at surface.
5
Gold Hydrogen Limited
Directors' report
30 June 2025
Testing on Ramsay 1 commenced seven (7) days after Ramsay 2, with the Group focussing on the Helium zone deeper in
the formation. The recorded Helium concentrations measured during the Stage 2 well testing of Ramsay 1 showed a
consistent increase, and did not appear to have reached a stable maximum value at the end of the testing period (refer
Figure 4).
Figure 3 – Ramsay 2 Testing 200 to 350m Shallow Hydrogen Zone 7 & 8 – Hydrogen concentrations increasing as testing
continued as measured from the annulus (corrected for air and Nitrogen contamination). Full details in ASX release of 2
August 2024.
Figure 4 - Ramsay 1 He concentrations (air and nitrogen corrected) measured during the testing of the open Helium
zone. The concentrations consistently increase over the testing period, with wellhead sample laboratory analysis
confirming the separator measurement. Full details in ASX release of 17 October 2024.
6
Gold Hydrogen Limited
Directors' report
30 June 2025
2D Seismic Survey
The Ramsay 2D regional seismic survey (completed in Q3, 2024) and subsequent and ongoing data interpretation has
provided significant new information identifying a number of potential drill locations, including locations up-dip from
Ramsay 1 and Ramsay 2, that are attractive for appraisal well drilling.
Further, the 2D seismic survey has revealed several regional Natural Hydrogen and Helium prospects within PEL 687, some
of which will be tested with future dedicated exploration wells. Selection and timing of these regional exploration wells is
likely to be undertaken in conjunction with planned further appraisal / delineation drilling activities, in order to take
advantage of the presence of the drilling rig and experienced crew. The target timing for this drill program is mid to late
2026.
Figure 5 – Map of Seismic Survey Data Acquired
7
Gold Hydrogen Limited
Directors' report
30 June 2025
Detection of Helium-3 in Ramsay Project Gas Samples
As reported in detail by Gold Hydrogen on 30 October 2024, Oxford University’s specialist noble gas research laboratory
within its Department of Earth Sciences, measured and confirmed the presence of Helium-3 (³He) in gas samples taken
from the Ramsay 2 well, at depths from 280 meters to 1,000 meters. The Oxford University Department of Earth Sciences
analysis confirmed that:
● the Ramsay Project Helium purity levels of up to 36.9%1 rank among the highest ever recorded globally;
● levels of Helium-3 have been confirmed up to the magnitude of 901 ppt (atmospheric 3He is 7.2 ppt); and
● the isotopic analysis results from samples tested suggest up to 3.47ppb Helium-3 within a 36.9% Helium sample.
Expansion of South Australian Footprint
During the period, the Gold Hydrogen was awarded a further petroleum licence application (PELA 792) with an area of
approximately 1,960km2, split into three (3) areas, as shown below in Figure 1. The eastern-most portion of PELA 792 is
contiguous with PELA 688 held by Gold Hydrogen’s 100% owned subsidiary Byrock Resources Pty Ltd.
2025 Drilling Campaign Planning
The Group is about to commence its 2025 drilling campaign to further evaluate and appraise the Ramsay Project. The
planning, including well locations was carried out with reference to the drilling and exploration well testing results from
the Group’s maiden 2023/4 exploration drilling campaign, together with interpretation of the data from the 2024 regional
575 line-kilometre 2D seismic survey. The program is being designed to further delineate and appraise the Ramsay Project’s
Natural Hydrogen and Helium accumulations, through appraisal well drilling and well testing activities.
The well design for the 2025 drilling program is to enable greater flexibility for well testing, primarily including larger
diameter well bores and well casings. The data from the drilling and testing of these wells will inform the future pilot
project area and design, with the aim of demonstrating the commercial production potential of both Natural Hydrogen
and Helium from the Ramsay Project.
Additionally, initial planning has commenced for a potential future 3D seismic survey over the Ramsay Project area. The
objective of this survey is to gather additional detailed data on the stratigraphic and structural subsurface complexities, in
order to facilitate detailed resource assessment and to optimise drilling locations for future appraisal and future
development wells. Further planning and scheduling will take place after the analysis of the results from the 2025 drilling
and well testing campaigns.
Regional Activities
The Group continues to progress a number of its application areas towards granted status via the ongoing advancement
of Native Title related matters. In addition, the Company is in the early stages of a desktop analysis of the publicly available
South Australian Resource Information Gateway (SARIG) datasets as well as a range of historical information to compile a
subsurface data suite. The main focus is on transposing the learnings from the Ramsay discovery to identify natural
hydrogen exploration focus areas within its regional application portfolio in South Australia.
Initial technical areas where learnings of the Ramsay discovery are being applied include:
● Analysis of the regional tectonic and geological settings;
● Petrophysical, stratigraphic and basement studies;
● Impact of fracture zones and structural boundaries;
● Seal and trap potential within different geological domains;
● Analysis of the potential for radiolytic and / or iron-bearing alteration sources in the basement suites;
● Preliminary interpretation of the GA seismic line data (refer below).
Formal work programs will commence on each application area as they are granted.
1
All Natural Hydrogen and Helium sample results have been corrected for air contamination
8
Gold Hydrogen Limited
Directors' report
30 June 2025
Geoscience Australia released the data associated with a regional seismic line acquired in 2022 along public roads which
transverses part of the Gold Hydrogen group’s application footprint (specifically PELAs 792, 703 and 702), as outlined in
Figure 6 below.
Figure 6 – Location of the Geoscience Australia Seismic Data Line Across the Group’s Application Areas
9
Gold Hydrogen Limited
Directors' report
30 June 2025
Summary of Corporate Activities
Successful Strategic Industry Investment Process
On 3 July 2025, Gold Hydrogen announced that it had received binding commitments for a total investment of $14,500,000
from Toyota Motor Corporation, Mitsubishi Gas Chemical, and ENEOS Xplora. The investment, which was fully settled by
18 July 2025, was undertaken via a placement of 20,714,285 fully paid ordinary shares at $0.70 per share.
The proceeds of the strategic investment will fund further drilling in the Ramsay fairway leveraging the results from the
Company’s maiden drilling and well testing campaigns at Ramsay-1 and Ramsay-2, and will help to advance future
downstream / commercialisation opportunities for the Ramsay Project.
The investment establishes a strategic collaboration focused on evaluating long-term opportunities across the Natural
Hydrogen and Helium value chain, including:
● Exploration, extraction and ultimately production at Gold Hydrogen’s flagship Ramsay Project in South Australia;
● Evaluation of potential Hydrogen supply opportunities for mobility and industrial uses, together with transportation
fuel cell and power generation platforms;
● Collaboration on a review of existing and emerging technologies regarding the potential for future Natural Hydrogen
purification and utilisation, and potential associated R&D projects;
● Investigation of potential future commercialisation pathways, including green methanol production.
In addition to the upcoming field activities at the Ramsay Project, the parties will consider the potential for further
investment opportunities, technical collaboration, downstream opportunities and offtake arrangements.
Executive Appointment
During the period Gold Hydrogen appointed Mr Peter Bubendorfer as its Chief Geologist. Peter’s career to this point spans
over 30 years, and he brings with him extensive experience in exploration within the oil & gas industry across Australia,
specifically regarding natural gas and CSG, these being gases which correlate well with the Company’s Hydrogen and
Helium gases. Peter also has strong exploration experience across a range of mineral commodities throughout
Australia. Over the past 25 years, he has held exploration manager, senior geologist, chief geologist or development
geologist roles with ADZ Energy, Armour Energy, Bow Energy and Arrow Energy. Peter has specific experience in the
identification of gas-related leads and plays, the establishment and running of exploration programs, seismic
interpretation, dataset analysis (geochemistry, geophysics, drilling and testing logs, etc), governmental liaison and
reporting, and all aspects of geological project assessment and fieldwork.
Peter was responsible for identifying and generating the foundational assets for Arrow Energy, Bow Energy and Waratah
Coal, all of which were subject to corporate take-overs. He has academic qualifications in science (geology), holds a legal
practising certificate, and is a member of the American Association of Petroleum Geologists.
R&D Funding
In February 2025, the Company received a $6,466,426 R&D tax refund associated with its pioneering Natural Hydrogen
and Helium exploration activities undertaken in connection with the year ended 30 June 2024.
10
Gold Hydrogen Limited
Directors' report
30 June 2025
Resources and Reserves Statements
Table 2 – Prospective Resource Statement for Natural Hydrogen*
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept 2021
1U
2U
3U
SPE-PRMS
PEL
Prospects
Low
Best
Mean
High
Pg Pd Pc
Sub-class
Estimate
Estimate
Estimate
PEL 687
All Prospects
207
1,313
4,187
8,820
22% 48% 10%
and Leads
Yorke
Peninsula
PEL 687
Ramsay FB
Prospect
124
931
2,712
6,989
22% 50% 11%
PEL 687
Ramsay Lst
Prospect
10
70
191
492
26% 50% 13%
PEL 687
Maitland
Lead
7
26
40
92
17% 35% 6%
Kangaroo
Island
PEL 687
PEL 687
*
Navigator
Kanmantoo
Lead
Prospect
34
32
152
134
280
237
678
569
19% 40% 8%
25% 40% 10%
This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the notes in Gold
Hydrogen’s ASX release of 13 January 2023.
It should be noted that the estimated quantities of Natural Hydrogen that may potentially be recovered by the
application of a future development project(s) relate to undiscovered accumulations. These estimates have both an
associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially recoverable Natural Hydrogen.
Table 3 – Prospective Resource Statement for Helium*
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
1U
2U
3U
SPE-PRMS
PEL
Prospects
Formation
Low
Best
Mean
High
Pg Pd Pc
Sub-class
Estimate Estimate
Estimate
PEL 687
All
All Formations Total
7
41
96
243
17% 60% 10%
prospects
Kulpara Formation
0.8
3.6
7.0
17.1 29% 60% 17%
PEL 687
Ramsay Prospect
Winulta Formation
0.1
0.6
1.6
4.0
12% 60% 7%
Fault Block
Fractured Formation
0.7
3.8
6.9
16.7 13% 60% 8%
Total
2
8
15
38
20% 60% 12%
Kulpara Formation
2.1
12.8
30.5
77.6 23% 60% 14%
Winulta Formation
0.3
2.4
7.7
19.8
8% 60% 5%
PEL 687
South of
Fractured Basement
Ramsay Prospect
Hilbata Suite
1.6
10.3
25.5
65.2 12% 60% 7%
Fault Block
Fractured Basement
Yorke Peninsula Heel
1.4
7.7
17.0
42.7 12% 60% 7%
Total
5
33
81
205
16% 60% 10%
*
This estimate of Helium Prospective Resources must be read in conjunction with the notes in Gold Hydrogen’s ASX
release of 21 February 2024.
It should be noted that the estimated quantities of Helium that may potentially be recovered by the application of a
future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of
discovery and a risk of development. Further exploration, appraisal and evaluation is required to determine the
existence of a significant quantity of potentially recoverable Helium.
11
Gold Hydrogen Limited
Directors' report
30 June 2025
QPRRE Statements
The Prospective Resource Statements for Natural Hydrogen and Helium have been included in this report under the
approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, who is a Qualified Petroleum Reserves and
Resources Evaluator. Mr Hadi Subrata confirms that, as at the date of this report, there are no changes to information or
any additional information, since the effective date of each prospective resource report (refer below), that would
materially change the estimates of prospective resources quoted, and that all material assumptions and technical
parameters underpinning the resource estimates continue to apply and have not materially changed.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this report is based on, and fairly represents, information
and supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date
of 30 September 2021, and which forms part of Gold Hydrogen’s Replacement Prospectus dated 29 November 2022. The
Prospective Resource Statement, together with all relevant notes, also appears in Gold Hydrogen’s ASX release of 13
January 2023.
QPRRE Statement – Helium
The Prospective Resource Statement for Helium in this report is based on, and fairly represents, information and
supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of
21 February 2024, and which was announced by Gold Hydrogen on that date together with the accompanying assumptions
and notes.
Significant changes in the state of affairs
There were no other significant changes in the state of affairs of the Group during the financial year ended outside of those
discussed above in the Review of Operations.
Matters subsequent to the end of the financial year
On 3 July 2025, Gold Hydrogen announced the selection of Toyota Motor Corporation, ENEOS Xplora and Mitsubishi Gas
Chemical as key strategic investors in a combined $14,500,000 equity deal. The combined investment amount was received
and all shares allotted by 18 July 2025.
No other matter or circumstance has arisen since 30 June 2025 that has significantly affected, or may significantly affect
the Group's operations, the results of those operations, or the Group's state of affairs in future financial years.
Likely developments and expected results of operations
The Group continues its focus on the exploration, evaluation and development of its existing South Australian project
footprint with a view to ultimately producing Natural Hydrogen in commercial quantities from multiple sites.
Environmental regulation
Other than as part of the standard conditions attaching to its Exploration Licences, the Group is not subject to any
significant environmental regulation under Australian Commonwealth or State law.
Climate and sustainability risks and opportunities
The Group’s overall governance approach to Climate Change risks and opportunities occurs at Board level, guided by input
from executive management. The Group’s overall strategy is to be part of the solution to Climate Change, and a decreased
reliance on fossil fuels, by focussing on the exploration and development of ‘gold’ hydrogen as a naturally generated, lowcarbon energy source.
The Board has adopted a Sustainability Policy, and has produced its 2025 Sustainability Report which is available as a
separate document, released at the same time as this Annual Report.
The Group does not consider that it currently has any adverse material exposure to the risks associated with Climate
Change. Accordingly, the Group does not consider it necessary to reflect any financial impact associated with Climate
Change risks. Conversely, the Group sees a range of opportunities associated with the broad industrial, societal and
regulatory changes influenced by Climate Change, which support its strategic objectives and its future business plans.
12
Gold Hydrogen Limited
Directors' report
30 June 2025
The Group considers the following matters relevant to this conclusion, as recommended under TCFD (the Taskforce on
Climate-related Financial Disclosure) guidelines:
Climate Change Risks – Transition Risks
Policy and Legal Risks
The Group’s primary business objectives are focussed on assisting with the decarbonisation of the Australian and global
economies via the use of Hydrogen as an alternative and low carbon energy source to fossil fuels. Accordingly, the Group
does not consider that it is likely to be subjected to national or international policy actions that will have an adverse impact
on its business or project objectives.
Technology Risk
Whilst some elements of downstream technology risk may currently exist for the transportation and delivery of Hydrogen
and Helium across the industry in general, the group does not consider this will represent a material adverse risk for its
business. This is because all of the organisations currently involved in the Hydrogen and Helium industry are aligned in
working towards solutions for the transportation and delivery of Hy