5 August 2026
ASX Announcement
Ramsay 1 Flow Test Delivers Outstanding Helium Results
Future Commercial Development Opportunity
Highlights:
Helium flowed to surface, purified and bottled
Gold Hydrogen has successfully completed appraisal flow testing at Ramsay 1, flowing He-
lium to surface and separating, capturing and concentrating it onsite, using Helium purifica-
tion equipment supplied by Quantum Technology Corporation of Canada.
First time Helium has been concentrated and bottled in Australia since the Darwin plant
closed in late 2023.
Significant progression against all key operational and technical objectives defined in the in-
dependent Worley Report, enhancing the commercial potential of a Helium development at
the Ramsay Project.
A world-class reservoir proven through initial flow test
Flow testing confirmed an exceptionally productive reservoir, capable of raw gas rates of up
to ~128 Mscf/day and Helium rates of up to ~24.3 Mscf/day from the Kulpara Dolomite.
Reservoir productivity of up to ~34 bbl/day/psi, substantially exceeding the sub-2
bbl/day/psi typical of commercial low-permeability reservoirs.
Advancement of the independent Worley commercial pathway: Helium potentially viable with
as few as two wells
Worley's assessment (refer ASX release of 20 May 2026) considered three indicative Helium
production scenarios and concluded commercial development may be viable with as few as
two wells.
The Ramsay 1 result confirms reservoir deliverability is not the constraint. The well was lim-
ited instead by installed pump capacity, an engineering variable within the Company's con-
trol.
Supports a dissolved-gas-in-water development model already operating commercially
worldwide, including in Japan by GHY strategic investors ENEOS and Mitsubishi Gas Chemi-
cal.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 2
A world-class reservoir proven through initial flow test
Flow testing confirmed an exceptionally productive reservoir, capable of raw gas rates of up
to ~128 Mscf/day and Helium rates of up to ~24.3 Mscf/day from the Kulpara Dolomite.
Reservoir productivity of up to ~34 bbl/day/psi, substantially exceeding the sub-2
bbl/day/psi typical of commercial low-permeability reservoirs.
World-class Helium purities
Onsite processing achieved Helium purity of up to 30%, stabilising at ~19% (both air-cor-
rected).
Raw Helium concentration reached up to 13% and was still rising when testing concluded.
These grades compare exceptionally favourably to global Helium developments, where com-
mercial projects can operate at purities as low as 1%.
Accelerated FEED and pathway to Contingent Resources
The Company intends to progress an accelerated Front-End Engineering Design (FEED) for a
Helium-focused development.
Ramsay 1 is a first step towards booking maiden Contingent Resources, with the combined
Ramsay 1, 2 and 3 flow-test results and the independent Worley assessment expected to
provide the dataset needed.
Global supply remains tight
Global Helium supply remains tight following the disruption at Qatar’s Ras Laffan facility.
Reported long-term contract prices above $600/MCF on an all-in plant-gate basis, position-
ing Gold Hydrogen to help re-establish domestic Australian Helium production.
Next steps
The campaign now moves to Ramsay 2 for zonal testing across gas-bearing reservoirs
through August, followed by Ramsay 3.
As part of the overall campaign, flow testing of the Natural Hydrogen-bearing Parara Lime-
stone will be prioritised in the cased and cemented well designs of Ramsay 2 and Ramsay 3.
------------------------------------------------------------------------------------------------------------------------------------------
Gold Hydrogen Limited (ASX: GHY) is pleased to announce outstanding interim results from appraisal flow
testing at its Ramsay 1 well on South Australia’s Yorke Peninsula. The program demonstrated strong
reservoir productivity together with the recovery, concentration and purification of high-grade Helium, a
major technical milestone that further strengthens the commercial potential of a Helium development at
the Ramsay Project.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 3
Gold Hydrogen Managing Director, Neil McDonald said: “The Ramsay 1 flow test has done exactly what
we designed it to do. We set out to flow Helium to surface, prove the separation and purification processes,
and measure how the reservoir actually performs, and we have achieved all three objectives. The results
indicate future commercial development opportunities and compare very favourably to other Helium
developments around the world. For the Ramsay Project we have an enormous Helium potential and we
look forward to building on this outstanding result across the remainder of the flow test campaign.”
Gold Hydrogen Non-Executive Chair, Hon. Alexandar Downer AC said: “The flow test results from Ramsay
1 are outstanding. Australia and the world need Helium, and Gold Hydrogen has an opportunity to bring
Helium production back to Australia; the first since 2023.”
Ramsay 1 Flow Test Results
Helium Concentration and Gas Composition
Air-corrected Helium concentrations of up to 30% were measured on site by a gas chromatograph,
stabilising at 19% (refer to the Company’s ASX announcement of 29 July 2026) before purification via the
Quantum Technology unit. These field measurements are preliminary and remain subject to confirmation
by independent laboratory analysis. Raw gas Helium concentration reached up to 13% and was still rising
when flow testing concluded.
The stabilised 19% Helium air-corrected concentration places the Ramsay Project among the highest-grade
Helium projects reported globally and materially above listed peers. Gas samples have been sent for
compositional and isotopic analysis, including Helium and Helium-3, with CSIRO and Oxford University.
Helium-3 of up to 901 ppt has previously been detected in Ramsay Project samples.
Further technical details are outlined in the table at Appendix 1.
Well Deliverability and Productivity Index
Productivity Index (PI) is the standard industry measure of how much fluid a well delivers for each unit of
pressure drop applied to the reservoir (bbl/day/psi).
Ramsay 1 flow data to date has recorded a PI of up to 34 bbl/day/psi, placing it among the more deliverable
wells drilled globally. By contrast, unconventional and low-permeability reservoirs typically record PI’s well
below 2 bbl/day/psi and require high drawdown to reach commercial rates (ref. S.A. Holditch, SPE, Texas
A&M, “Tight Gas Sands”, June 2006).
The maximum 2,000 bbl/day rate (maximum pump capacity) was achieved with only about 100 psi of
drawdown, at the rated capacity of the installed ESP, and for several days at stabilised rates of 800 to 1,000
bbl/day. Flowing bottomhole pressure remained well above the level at which the reservoir would constrain
production, indicating that Ramsay 1 was limited by surface and artificial-lift equipment rather than
reservoir deliverability.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 4
The high PI is consistent with the Company’s geological model of the Kulpara Dolomite as a well-connected,
high-transmissibility carbonate reservoir with an extensive underlying aquifer, interpreted from wireline,
drilling and formation-evaluation data. The flow test data collected to date provides the direct dynamic
confirmation of that model.
Measured and Modelled Flow Rates
The geological Kulpara Dolomite formation at 600m to 800m depth is a gas-dissolved-in-water Helium
accumulation, a type common worldwide and proven commercially (for example the Nakajo gas field,
ENEOS Xplora, Japan). At Ramsay, Helium is carried in solution in formation water and liberated at surface
by separation, thus gas production is a direct function of the volume of water produced and its gas–water
ratio (GWR). The rate-limiting variable is the fluid volume that can be lifted to surface, set by reservoir
deliverability (PI) and installed pump capacity. Ramsay 1’s PI has been recorded at up to 34 bbl/day/psi.
The Company has modelled the deliverability of a Ramsay-type completion at potential higher offtake rates
contemplated for development, using the most reliable data including measured PI, Helium concentration
and GWR from both the 2024 and 2026 flow tests. Results are set out in Table 1 below, with the 2024 test
shown for reference.
Table 1 – Ramsay 1 measured and modelled flow rates
Parameter 2024 flow
test
(measured)
2026 flow
test
(measured)
Modelled
20,000 bbl/day
ESP
Modelled
sensitivity
– GWR held at only
3 scf/bbl as
opposed to 6,4
scf/bbl/day
ESP rated capacity (bbl/day) 180 2,000 20,000 20,000
Gross fluid rate (bbl/day) 170 2,000 20,000 20,000
Implied drawdown at PI up to 34
bbl/d/psi
5 60 600 600
In-situ gas–water ratio (scf/bbl) Up to 6.4 Up to 6.4 Up to 6.4 3
Raw gas rate (Mscf/day) Up to 1.1 Up to 12.8 Up to 128 60
Air-corrected Helium concentration
sustained rate
20.0% 19.0% 19.0% 19.0%
Helium rate (Mscf/day) Up to 0.22 Up to 2.4 Up to 24.3 11.4
Note: measured columns are actual test results. Modelled columns are outcomes of the Company’s
deliverability modelling and have not been demonstrated by flow testing. Refer to Note 1 for the full basis
of preparation, and to the Forward Looking Statement at the end of this announcement. Mscf/day denotes
thousand standard cubic feet per day.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 5
At the measured PI of approximately up to 34 bbl/day/psi, producing 20,000 bbl/day would require
approximately 600 psi of drawdown. Reservoir pressure at the tested interval (approximately 900m
measured depth) is estimated at approximately 1,280 psi on a normally-pressured basis, so the required
drawdown appears possible but remains to be confirmed by extended production testing at higher rates.
Ramsay 1 as a Proof-of-Concept Well
Ramsay 1 was drilled in 2023 as an exploration well and completed with 4-inch slotted liner. This completion
is sub-optimal for development, as it prevents zonal isolation and limits both the size of artificial lift
equipment and the rate at which fluid can be lifted. The 2,000 bbl/day ESP used in the 2026 test is about
one-tenth of the design rate for Ramsay 3 and a future commercial pilot.
However, the flow test proves the concept across reservoir deliverability, artificial lift, surface separation,
Helium purification, gas handling and sampling. The Company will progress to zonal testing on Ramsay 2
and the purpose-built Ramsay 3, which is completed with cemented 7-inch casing and can allow for the
deployment of a 20,000 bbl/day ESP.
Pathway to Contingent Resources Sign Off
The Company has an independent Prospective Resource assessment that is headlined with a mean estimate
of 96 billion cubic feet (Bcf) of Helium⁴, with full details set out in Appendix 2. The Ramsay 1 flow test
results are an encouraging step towards conversion of a portion of Prospective Resources to Contingent
Resources. A key milestone is the demonstrated flow of Helium to surface, supported by data sufficient to
characterise reservoir deliverability.
The Ramsay 1 flow test contributes the following towards the booking of Contingent Resources:
Flow to surface demonstrated. Helium has been flowed to surface, separated from the produced fluid,
purified and bottled. This is the definitive test of producibility and distinguishes a discovery from an
occurrence.
Deliverability quantified. A Productivity Index of up to 34 bbl/day/psi provides the dynamic reservoir
parameter needed to model well rates and design a development.
Concentration confirmed under flowing conditions. Stabilised air-corrected Helium of 19% under
sustained flow, as distinct from spot samples, provides the concentration input for volumetric and
deliverability modelling.
Recovery and processing route validated. Separation and purification at surface has established a
credible technical development route, a requirement for a resource to be classified as potentially
recoverable.
The Company expects the combined Ramsay 1, 2 and 3 flow-test results, with the independent Worley2
assessment, to provide the dataset needed to book a maiden Contingent Resource for Helium at the
Ramsay Project. Ramsay 1 is the first step.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 6
Framework for a Fast-Tracked Commercial Pilot Development
The independent assessment completed by Worley2
considered three indicative Helium production
scenarios for the Ramsay Project and concluded that commercial development may be viable with as few
as two wells.
Read against that framework, the Ramsay 1 result is directly relevant in three respects:
The reservoir is not the constraint. Ramsay 1 flow rate was limited by installed pump capacity, an
engineering and capital variable the Company can influence, rather than by the reservoir.
The purification train is proven at field scale. A single-stage membrane process delivered Helium at
over 50%, and reaching commercial grade Helium will require additional purification stage(s). This
supports procuring a modular, skid-mounted Helium purification unit(s) from Quantum Technology
Corporation.
The development concept is analogous to operating projects. Given the Ramsay Project’s high Helium
purities, the Worley assessment and favourable water-disposal options, a dissolved-gas-in-water
development is considered to have the potential for commercial viability. Such projects operate
commercially worldwide, including in Japan, where GHY strategic investors ENEOS and Mitsubishi Gas
Chemical have run dissolved-gas developments for decades. Refer Gold Hydrogen’s presentation of
28 May 2026.
Subject to the balance of the flow-test campaign and Contingent Resource definition, the Company intends
to progress an accelerated Front-End Engineering Design (FEED) for a Helium-focused development, and
continues to assess low-cost pilot options, including vendor design and costings for a modular commercial
Helium plant.
Surface Separation, Purification and Bottling
As announced on 29 July 20261
, the Quantum Technology Corporation single-stage membrane unit
successfully demonstrated surface purification of Helium at Ramsay 1. The purification unit lifted the raw-
stream Helium concentration during flow testing from 5.6% (before air correction) to 50.5% during the
Ramsay 1 campaign. The purified Helium was captured in onsite cylinders and used for proof-of-concept
demonstrations, including gas bottling and filling an industrial meteorological balloon at the wellsite.
This field-measured performance has been calibrated into Quantum’s process modelling. According to
George Zhang, Quantum’s Chief Technology Officer, reaching commercial grade (approximately 99%
Helium) requires a pressure-swing adsorption (PSA) stage in addition to the membrane unit. Purification to
commercial specification is critical to any Helium development, and the Ramsay 1 result materially advances
this part of the value chain.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 7
Helium Uses in Australia
Helium is a critical input across the Australian economy, including MRI and medical imaging, semiconductor
and electronics manufacturing, scientific research, aerospace, welding and leak detection. With no
domestic production since 2023, this demand is currently met entirely by imports.
Australian Helium Market Context
Australia has had no domestic Helium production since the closure of the BOC Helium plant at Darwin in
late 2023 following depletion of the Bayu-Undan gas field, and currently imports 100% of the Helium it
consumes. Global supply remains tight, with the disruption at Qatar’s Ras Laffan facility estimated to have
removed between 30–35% of global Helium supply for a period of 12 to 18 months. The Ramsay 1 purifica-
tion test is, to the Company’s knowledge, the first occasion on which Helium has been concentrated at
surface in Australia since the Darwin closure, and is a first step towards the re-establishment of domestic
Helium production. Helium is not openly traded, so published benchmarks are limited. However, reported
long term Helium contract prices have increased to greater than $600/MCF, on an all-in plant-gate basis⁵.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 8
Risks
The results described in this announcement are from a flow test conducted at low flow rates on an
exploration well with a sub-optimal completion. The results do not confirm commercially recoverable
Helium, sustained long-term flow rates, or project economics. Field measurements reported in this
announcement have uncertainty, are preliminary and remain subject to laboratory confirmation. Both
geological and potential development risks remain associated with the Ramsay Project and the Company’s
commercial and business objectives. There is no certainty that the Ramsay 2 and Ramsay 3 testing programs
will achieve their expected outcomes, that Contingent Resources will be able to be booked, or that
commercial viability can be established.
Note 1 – Basis of Preparation of Modelled Flow Rates
The modelled flow rates presented in Table 1 of this announcement are outcomes of the Company’s
deliverability modelling prepared by Billy Hadi Subrata, Gold Hydrogen’s Chief Technical Officer, and are
based on the following assumptions:
the Productivity Index of up to 34 bbl/day/psi derived from the Ramsay 1 flow tests to date is
maintained at the higher drawdown required to achieve 20,000 bbl/day;
sufficient reservoir pressure and aquifer support exist to sustain the required drawdown of
approximately 600 psi over the modelled period;
the air-corrected Helium concentration of 19% measured at stabilised conditions is maintained at
elevated offtake rates;
the in-situ gas–water ratio increases with up to 6.4 scf/bbl as a consequence of increased drawdown
liberating additional dissolved gas (a sensitivity holding GWR constant at 3 scf/bbl is also presented)
and was observed during 2024 test with a peak GWR a surface measured up to 6.4 scf/day;
no scale deposition, formation damage, sanding or water chemistry effects arise at elevated offtake
rates;
a well completion suitable for the deployment of a 20,000 bbl/day ESP (such as the cemented 7-inch
casing at Ramsay 3), together with the associated ESP efficiency, power supply and design-life;
sufficient surface separation, gas handling, purification and produced water disposal or re-injection
capacity is available.
Reservoir deliverability at 20,000 bbl/day has not been demonstrated by flow testing at the Ramsay Project.
Actual flow rates achieved may differ materially from the modelled rates. The modelled rates are not an
estimate of petroleum reserves or contingent resources and should not be relied upon as such. They are
forward looking statements and should be read subject to the Forward Looking Statement below.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 9
References and Previous Disclosures
1
ASX release “Australian First – Helium Purified and Bottled at Ramsay 1” dated 29 July 2026.
2
ASX release “Ramsay Project Helium Commercialisation Update” dated 20 May 2026 (Worley
independent assessment).
3
ASX release “World Leading Helium Purities measured at Ramsay Project” dated 17 October 2024
⁴ ASX release “Helium Prospective Resource Report” dated 21 February 2024
⁵ https://www.gasworld.com/story/renergen-secures-first-offtake-for-south-african-Helium-
project/2252920.article/
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the previous market announcements referred to above and that all material
assumptions and technical parameters underpinning those disclosures continue to apply and have not
materially changed.
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be found
on the Company’s website (www.goldhydrogen.com.au). Gold Hydrogen also has accounts on LinkedIn and
Twitter (@GHY_ASX), and copies of market releases will be emailed to all interested parties who register
via investorhub.goldhydrogen.com.au/auth/signup.
This announcement has been authorised for release by the Managing Director.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldhydrogen.com.au kschlobohm@goldhydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 10
Qualified Petroleum Reserves and Resources Evaluator (QPRRE) Statement
The information in this announcement that relates to the results of the Ramsay 1 flow test, the derived
Productivity Index and the modelled flow rates is based on, and fairly represents, information and
supporting documentation prepared by Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen,
who is a Qualified Petroleum Reserves and Resources Evaluator. Mr Hadi Subrata has consented to the
inclusion of this information in the form and context in which it appears.
The Prospective Resource Statement for Helium has been included in this announcement under the
approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, who is a Qualified Petroleum
Reserves and Resources Evaluator. Mr Hadi Subrata confirms that, as at the date of this announcement,
there are no changes to information or additional information, since the effective dates, that would
materially change the estimates of prospective resources quoted.
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including aspirational forward-plans, projections, forecasts, modelled flow rates and estimates,
are provided as a general guide only and should not be relied on as an indication or guarantee of future
performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other
important factors, many of which are outside the control of the Company and which are subject to change
without notice and could cause the actual results, performance or achievements of the Company to be
materially different from the future results, performance or achievements expressed or implied by such
statements. Past performance is not necessarily a guide to future performance and no representation or
warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements
or other forecast. Nothing contained in this announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past, present or
the future performance of Gold Hydrogen Limited.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 11
Appendix 1 – ASX Listing Rule 5.30 Disclosures
Listing Rule 5.30 Information – Ramsay 1 Flow Test (2026 Campaign)
ASX Listing Rule 5.30 Ramsay 1 – 2026 Flow Test
(a) Name and type of well Ramsay 1 – vertical exploration well, flow tested with electrical
submersible pump
(b) Location, permit or lease PEL 687, Yorke Peninsula, South Australia. UTM zone 53 GDA2020: X
748,208.07 / Y 6,149,545.7
(c) Entity’s working interest Gold Hydrogen Limited 100%
(d) Net pay thickness
(conventional)
Insufficient information is presently available to determine net pay
thickness. 180m gross pay thickness in Kulpara Dolomite (Helium zone)
(e) Geological rock type Parara Limestone, Kulpara Dolomite, Granite basement
(f) Depth of zones tested 212m to 1,005m
(g) Type and duration of
test(s)
Production flow test using a 2,000 bbl/day electrical submersible
pump, commenced 25 July 2026, total duration 7 days including 5 days
of stabilised flow
(h) Hydrocarbon phases
recovered
Not applicable – no hydrocarbons recovered. Gas stream comprises
predominantly Helium, nitrogen and natural hydrogen.
(i) Other recovery and
proportions
Formation water produced at rates between 500 - 2,000 bbl/day; Gas
dissolved in water. An in-situ gas–water ratio of approximately 3
scf/bbl is calculated from the downhole bailer samples collected during
the Ramsay 1 2024 flow test. Gas-water ratios of up to 6.4 scf/bbl were
also measured from surface samples during 2024 flow testing
(j) Choke size, flow rates and
volumes
Gross fluid rate of up to 2,000 bbl/day (constrained by ESP rated
capacity, not reservoir deliverability); raw gas rate of approximately up
to 6.0 Mscf/day; Helium rate of approximately 1.14 Mscf/day; choke
size 14/64 inch; cumulative volumes recovered 3808 bbl. Derived
Productivity Index of approximately 20 bbl/day/psi at approximately
100 psi drawdown. PI of up to 34 bbl/day/psi were also calculated
(k) Fracture stimulation None
(l) Material non-hydrocarbon
gases
Helium (air-corrected concentration of up to 30%, stabilised at 19%),
Hydrogen, Nitrogen, CO2
(m) Other material
information
The well is completed with 4-inch slotted liner and the test was
constrained by installed pump capacity. Field measurements are
preliminary and subject to independent laboratory confirmation.
Modelled flow rates at 20,000 bbl/day are set out in Note 1 and have
not been demonstrated by flow testing.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 12
Appendix 2 - Prospective Resource Statement for Helium
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL Prospects
SPE
PRMS
Sub-
class
Formation
1U
Low
Estimate
2U
Best
Estimate
Mean
3U
High
Estimate
Pg Pd Pc
PEL 687
All
Prospects
All Formations
Total
7 41 96 243 17% 60% 10%
PEL 687
Ramsay
Fault Block
Prospect
Kulpara Formation 0.8 3.6 7.0 17.1 29% 60% 17%
Winulta Formation 0.1 0.6 1.6 4.0 12% 60% 7%
Fractured Basement 0.7 3.8 6.9 16.7 13% 60% 8%
Total 2 8 15 38 20% 60% 12%
PEL 687
South of
Ramsay
Fault Block
Prospect
Kulpara Formation 2.1 12.8 30.5 77.6 23% 60% 14%
Winulta Formation 0.3 2.4 7.7 19.8 8% 60% 5%
Fractured Basement
Hilbata Suite
1.6 10.3 25.5 65.2 12% 60% 7%
Fractured Basement
Yorke Peninsula Heel
1.4 7.7 17.0 42.7 12% 60% 7%
Total 5 33 81 205 16% 60% 10%
* This estimate of Helium Prospective Resources must be read in conjunction with the notes below.
These Helium Prospective Resources are estimated quantities of Helium that may potentially be
recovered by the application of a future development project(s) relate to undiscovered accumulations.
These estimates have both an associated risk of discovery (Pg) and a risk of development (Pd). Further
exploration, appraisal and evaluation is required to determine the existence of a significant quantity of
potentially recoverable Helium.
Notes:
1. This table presents Gold Hydrogen's Prospective Resources for Helium in the Ramsay Field of Yorke
Peninsula only. Gold Hydrogen currently has no Reserves and no Contingent Resources.
2. Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS
2018. SPE have provided guidance regarding the Extension of PRMS Principles to Non-Hydrocar-
bon/Non-Traditional Situations including Helium (and Hydrogen).
Refer: https://www.spe.org/en/industry/reserves/non-hydrocarbons/
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899 | 13
3. Per ASX LRs 5.28.4&5 estimates are unrisked and aggregated arithmetically by category, hence caution
that the aggregate low estimate may be a very conservative estimate and the aggregate high estimate
may be a very optimistic estimate due to the portfolio effects of arithmetic summation.
4. Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the "full
distribution" and has not been truncated by application of the MEPS (minimum economic pool size)
concept.
5. The Reference Point is at the wellhead/edge of lease (i.e. wellhead facilities) so the estimates have no
deduction for flare, vent or fuel consumed in operations.
6. Pg (Chance of geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality = Pg
x Pd) are calculated as a weight average of the P50's of the Helium Bcf (Billion Cubic Feet) of the pro-
spect formations.
7. Pg incorporates Play Risk and Prospect Risk.
8. Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (i.e. not just economics).
9. Information in the table and throughout the Report is rounded. Some totals in the tables may not add
due to rounding.
10. There is no change to information or additional information, since the effective date of 21 February
2024, that Gold Hydrogen and TRA are aware of that would materially change the estimates in this
resources and reserves statement.
QPRRE Statement