Annual Report to Shareholders
Released
Released
Announcement PDF
Gold Hydrogen Limited
ABN 74 647 468 899
Annual Financial Report - 30 June 2026
Gold Hydrogen Limited
Corporate directory
30 June 2026
1
Directors Alexander Downer - Non-Executive Chairman
Neil McDonald - Managing Director
Katherine Barnet - Non-Executive Director
Roger Cressey - Executive Director
Company secretary Karl Schlobohm
Registered office and Level 14
principal place of business 110 Eagle Street
Brisbane
QLD 4000
Share register Automic
Suite 2703, Level 27
111 Eagle Street
Brisbane
QLD 4000
Phone: 1300 288 664
Auditor BDO Audit Pty Ltd
Level 18
360 Queen Street
Brisbane
QLD 4000
Solicitors Gadens
111 Eagle Street
Brisbane
QLD 4000
Bankers National Australia Bank Limited
259 Queen Street
Brisbane
QLD 4000
Stock exchange listing Gold Hydrogen Limited shares are listed on the Australian Securities Exchange (ASX
code: GHY)
Website www.goldhydrogen.com.au
Corporate Governance Statement investorhub.goldhydrogen.com.au/corporate-governance
Gold Hydrogen Limited
Chairman's Letter
30 June 2026
2
Dear Shareholders
The 2026 financial year has been another important period of progress for Gold Hydrogen as we continue to advance the
Ramsay Project and build our understanding of its Natural Hydrogen and Helium potential.
A major focus during the year was the continuation of our appraisal program on the Yorke Peninsula. The successful drilling
of Ramsay 3 and Ramsay 4 built upon the knowledge gained from our earlier Ramsay 1 and Ramsay 2 wells and provided
the Company with a significantly expanded technical dataset from which to plan its ongoing exploration, appraisal and
testing activities.
Importantly, during the year we also welcomed Toyota Motor Corporation, Mitsubishi Gas Chemical and ENEOS Xplora as
strategic investors in Gold Hydrogen following their combined $14.5 million investment in July 2025. Their investment,
together with the strategic collaboration established between the parties, represents significant external validation of the
potential of the Ramsay Project and provides Gold Hydrogen with the opportunity to explore future technical, downstream
and commercialisation initiatives with three highly respected international organisations.
Our work has increasingly focused not simply on confirming the presence of Natural Hydrogen and Helium, but on
understanding how these gases may ultimately be produced, processed and commercialised. During the year the Company
continued to progress studies into potential downstream applications, including opportunities associated with Hydrogen
utilisation, Helium development and green methanol.
Since the end of the financial year, the Company has undertaken an extensive well testing program at Ramsay. Testing at
Ramsay 1 has successfully demonstrated that Helium can be flowed to surface, separated and purified, while subsequent
testing at Ramsay 2 has provided further evidence of continuity of the Helium-bearing zones within the Ramsay system.
Testing activities are continuing across the Ramsay wells as we seek to better understand reservoir behaviour and the
potential for future commercial production.
The Company is also pleased that our strategic investors are now moving beyond their initial investment towards more
active strategic participation in the development and evaluation of potential opportunities associated with the Project.
While considerable technical work remains ahead of us, I believe Gold Hydrogen enters the new financial year with a
stronger technical understanding of Ramsay and a group of strategic partners capable of contributing meaningfully to its
future development.
In closing, I would like to recognise my fellow Directors and the Company’s management, technical and operational teams
for their considerable efforts during another very active year. I would also like to thank our shareholders, strategic partners,
suppliers and other stakeholders for their continued support.
We look forward to continuing the work required to demonstrate the commercial production potential of Natural
Hydrogen and Helium at Ramsay.
Yours sincerely
The Hon Alexander Downer
Non-Executive Chairman
Gold Hydrogen Limited
Directors' report
30 June 2026
3
The Directors present their report, together with the financial statements, on the consolidated entity (referred to hereafter
as the 'Group') consisting of Gold Hydrogen Limited (referred to hereafter as Gold Hydrogen, 'the Company' or 'parent
entity') and the entities it controlled at the end of, or during, the year ended 30 June 2026.
Directors
The following persons were Directors of Gold Hydrogen Limited during the whole of the financial year and up to the date
of this report, unless otherwise stated:
● Alexander Downer – Non-Executive Chair
● Neil McDonald – Managing Director and Chief Executive Officer
● Katherine Barnet – Non-Executive Director
● Roger Cressey – Executive Director and Chief Operating Officer
Principal activities
The Group is focused on the discovery, appraisal and potential development of Natural Hydrogen and Helium gas projects
in South Australia. There was no change to the principal activities of the Group during the year.
Dividends
There were no dividends paid, recommended or declared during the current or previous financial year.
Review of operations
The loss for the Group after providing for income tax amounted to $2,479,159 (30 June 2025: $2,241,100).
Industry and Corporate Overview
Gold Hydrogen Limited and its controlled entities (the Group) are focused on the discovery, appraisal and potential
development of Natural Hydrogen and Helium gases in South Australia. The Group’s flagship Ramsay Project is located
within Petroleum Exploration Licence 687 (PEL 687) on the Yorke Peninsula and Kangaroo Island, in a region where historic
drilling first recorded high-purity Natural Hydrogen occurrences in the early twentieth century.
Natural Hydrogen, also known as gold or white hydrogen, is generated through geological processes and occurs naturally
in the subsurface. If it can be produced at commercial rates, it may offer cost, infrastructure and emissions advantages
relative to manufactured hydrogen. Helium is a scarce, non-substitutable gas used in medical imaging, semiconductor
manufacture, data centres, aerospace, defence, quantum computing and cryogenic applications. Australia presently relies
on imported Helium, providing a potential domestic-market opportunity if the Ramsay Project is successfully developed.
At 30 June 2026, the Group’s gas-related exploration portfolio comprised PEL 687 and a series of exclusively held petroleum
exploration licence applications across South Australia. Following the award of PELA 792, the Group’s combined tenure
and application footprint is in excess of 75,000 km². The Group was also preferred applicant for four gas storage exploration
licence applications covering approximately 8,000 km² within the Yorke Peninsula portion of PEL 687.
Corporate and Project Objectives
The Group’s strategy is to progress the Ramsay Project from exploration and appraisal through technical and commercial
evaluation, with the objective of establishing whether Natural Hydrogen and Helium can be produced in commercial
quantities. The development pathway remains subject to geological success, sustained flow rates, resource maturation,
regulatory approvals, land access, engineering studies, funding and final investment decisions.
With regard to its flagship Ramsay Project, the Group’s ongoing commercial and technical objectives are to:
(1) continue exploration and appraisal activities to delineate the Natural Hydrogen and Helium systems encountered at
Ramsay;
(2) demonstrate sustained movement of Natural Hydrogen and/or Helium to surface and obtain the reservoir data
required to assess commercial production potential;
(3) progress the maturation of Prospective Resources and, subject to sufficient data, evaluate the potential recognition of
Contingent Resources;
(4) assess pilot and larger-scale commercialisation pathways for Natural Hydrogen and Helium, including domestic Helium
supply, onsite power generation, compressed Natural Hydrogen, transport applications and green methanol; and
(5) apply technical learnings from Ramsay to the Group’s broader South Australian portfolio.
Gold Hydrogen Limited
Directors' report
30 June 2026
4
Figure 1 – Gold Hydrogen gas tenure and application areas in South Australia.
Summary of Operational Activities
Strategic investment and expanded capability
In July 2025, the Company completed a $14.5 million strategic placement to Toyota Motor Corporation, Mitsubishi Gas
Chemical Company, Inc. and ENEOS Xplora Inc. The placement comprised 20,714,285 fully paid ordinary shares issued at
$0.70 per share, representing a 22% premium to the Company’s closing share price on 2 July 2025. The proceeds were
directed principally toward the 2025 drilling and 2026 flow-testing program and the assessment of downstream
commercialisation opportunities.
The investment also established a framework for potential technical collaboration and evaluation of opportunities across
the Natural Hydrogen and Helium value chain, including exploration, extraction, purification, utilisation, offtake and
downstream products.
Gold Hydrogen Limited
Directors' report
30 June 2026
5
The Company expanded its operational and commercial capability during the year through the appointment of Simon
Talbot as Chief Commercial Officer, Hugo Beldame as a geologist, Leon Hennessey as General Manager – Operations under
a contract arrangement, and Marshall Hood as Executive Vice President – Operations. These appointments supported the
delivery of the Ramsay drilling and testing programs and the evaluation of potential development pathways.
2025 Ramsay drilling campaign
The Group recommenced field drilling in November 2025 following the integration of the Ramsay 1 and Ramsay 2 drilling
and testing results with the interpretation of the 2024 regional 2D seismic survey. Ramsay 3 and Ramsay 4 were selected
to appraise the lateral continuity and reservoir characteristics of the Natural Hydrogen and Helium-bearing formations
identified in the earlier wells.
The 2025 wells were designed with larger-diameter wellbores and 7-inch casing to provide greater flexibility for subsequent
production-style flow testing. The principal objectives were to delineate the gas systems beyond Ramsay 1 and Ramsay 2,
provide improved conditions for lifting formation water and moving gas to surface, mature the Ramsay Project toward
commercial evaluation, and develop a repeatable exploration and appraisal approach for the Group’s wider acreage
portfolio.
Figure 2 – Ramsay well locations, including Ramsay 3 and Ramsay 4, relative to the earlier Ramsay wells.
Ramsay 3
Ramsay 3 was spudded on 10 November 2025 approximately 2.3 kilometres from Ramsay 1 and Ramsay 2 and was drilled
to a total depth of 884 metres. Elevated Natural Hydrogen responses were recorded in the Parara Limestone, while
elevated Helium responses were recorded at several depths within the Kulpara Dolomite.
Gas responses correlated with key intervals encountered in Ramsay 2, supporting the potential continuity of the Natural
Hydrogen and Helium-bearing zones across the approximately 2.3-kilometre distance between the wells.
Full technical details are available from the Company’s ASX release of 2 December 2025.
Gold Hydrogen Limited
Directors' report
30 June 2026
6
Ramsay 4
Ramsay 4 was spudded on 3 December 2025 approximately 500 metres north of Ramsay 2 and was drilled to a total depth
of 855 metres. The well penetrated porous and permeable intervals within the Parara, Kulpara and Winulta formations.
Formation evaluation showed strong lateral correlation with Natural Hydrogen and Helium-bearing formations sampled
and tested in Ramsay 1 and Ramsay 2.
A comprehensive wireline logging suite was acquired, including nuclear magnetic resonance, acoustic and resistivity
imaging logs. Mud-gas and wellhead samples were collected, including samples associated with a loss zone encountered
at approximately 330 metres. The interval was interpreted to correlate with a fractured zone in Ramsay 1 and was
considered prospective for subsequent flow testing.
Full technical details are available from the Company’s ASX release of 16 December 2025.
Figure 3 – Ramsay 4 wellsite during the December 2025 drilling campaign.
Petrophysical interpretation and reservoir definition
Independent specialist processing of the Ramsay 3 and Ramsay 4 borehole imaging data improved the quality of the
resistivity and acoustic images and increased confidence in the interpretation of fractures and porous intervals. Preliminary
interpretation identified additional open fracture zones and porous intervals across the Natural Hydrogen and Helium-
bearing reservoirs.
As a result of this work, the interpreted gross reservoir thickness across the combined Parara, Kulpara and Winulta
formations in Ramsay 3 increased by more than 200%, adding further intervals to the planned flow-testing program.
Additional quality control, processing and integration of wireline and laboratory data continued during the year.
Full technical details are available from the Company’s ASX release of 28 April 2026.
Gold Hydrogen Limited
Directors' report
30 June 2026
7
Figure 4 – Example of processed borehole image data used to identify fractures and porous intervals in the Ramsay
wells.
Ramsay flow-testing campaign
By 30 June 2026, the Ramsay flow-testing campaign had moved into implementation. Site preparation was well advanced,
equipment and crews were mobilising, and key early-works and groundwater reinjection approvals had been received.
The campaign has been designed to test Ramsay 1, Ramsay 2 and Ramsay 3 over a period of up to three months, including
separate zonal testing of selected Natural Hydrogen and Helium-bearing formations. The principal objective is to measure
sustained flow rates and gather pressure, fluid, gas composition and reservoir-response data required for commercial
assessment, potential resource maturation, future field development planning and engineering studies.
The 2026 program represents a significant increase in pumping capacity compared with the 2024 testing campaign. Ramsay
1 and Ramsay 2 are to be tested using a 2,000-barrel-per-day electric submersible pump, while the larger wellbore at
Ramsay 3 was designed to accommodate a pump rated up to 20,000 barrels per day.
Figure 5 – Mobilisation and electric submersible pump equipment for the 2026 Ramsay flow-testing campaign.
Gold Hydrogen Limited
Directors' report
30 June 2026
8
Geochemical sampling pilot study
During March 2026, 39 soil-gas samples were collected across the Ramsay area and adjoining road reserves using a mobile
sampling unit. Samples were analysed in the field using a portable gas chromatograph capable of separately measuring
Natural Hydrogen and Helium.
The maximum Natural Hydrogen result was 2,160 parts per million, almost 4,000 times atmospheric background, with a
further adjoining sample recording 635 parts per million. Four samples exceeded 500 parts per million, including 1,100
parts per million at the Ramsay 1 location. The results supported confidence in the sampling method and indicated possible
extension of the Ramsay system south of the existing wells. The Group intends to use the method to assist with the
maturation and de-risking of further drilling targets across PEL 687.
Full technical details are available from the Company’s ASX release of 28 April 2026.
Figure 6 – Location and relative Natural Hydrogen results from the 39-sample Ramsay soil-gas pilot study
Regional fluid inclusion study
The Group continued preliminary subsurface studies across its exclusively held application areas. A total of 51 rock samples
from historic drill core and cuttings were selected from the northern Yorke Peninsula and Fleurieu Peninsula and analysed
using SLB Fluid Inclusion Stratigraphy technology.
Natural Hydrogen concentrations exceeded background thresholds in 23 samples and Helium exceeded background
thresholds in 29 samples. Thirteen samples recorded Helium at more than ten times background thresholds. The detections
occurred across multiple lithologies and geological settings, supporting the potential for regionally extensive Natural
Hydrogen and Helium generation systems beyond the Ramsay Project. Field activity within the application areas remains
dependent on the relevant licences being granted.
Full technical details are available from the Company’s ASX release of 28 April 2026.
Gold Hydrogen Limited
Directors' report
30 June 2026
9
Figure 7 – Regional fluid inclusion sampling program across Gold Hydrogen application areas
Commercialisation and development studies
The Group progressed a range of preliminary commercialisation pathways during FY2026. Each pathway remains
contingent on successful flow testing, resource definition, engineering and feasibility studies, regulatory approvals, land
access, offtake arrangements, funding and Board approval. The pathways identified include:
● Natural Hydrogen to power: an onsite fuel-cell concept under which Natural Hydrogen could generate electricity for a
modular Helium purification plant and demonstrate an off-grid power application.
● Purified compressed Natural Hydrogen: a modular purification concept producing fuel-cell-grade gas for transport in
high-pressure tube trailers, with potential longer-term scaling to liquid Natural Hydrogen and export applications.
● Modular Helium pilot: a smaller-scale skid-mounted purification plant potentially matched to one or two wells, aimed
at generating operating data and potentially re-establishing domestic Helium supply.
● Scaled Helium development: gaseous and/or liquid Helium production, with plant size, product form and phasing to
be optimised against flow-test results and future resource definition.
Green methanol collaboration
In June 2026, Gold Hydrogen entered into a non-binding memorandum of understanding with strategic shareholder
Mitsubishi Gas Chemical Company, Inc. to study the potential development of a green methanol production facility on the
Yorke Peninsula using Natural Hydrogen from the Ramsay Project.
Subject to confirmation of suitable Natural Hydrogen supply conditions, the parties intend to evaluate feedstock, utilities,
plant location, biogenic carbon sources, infrastructure, route-to-market and preliminary project economics through a pre-
feasibility study. Subject to satisfactory outcomes, the work may progress to a definitive feasibility study and front-end
engineering design.
Full technical details are available from the Company’s ASX release of 20 May 2026.
Gold Hydrogen Limited
Directors' report
30 June 2026
10
Helium commercial assessment
Worley completed an independent high-level commercial assessment of indicative Helium development scenarios using
inputs provided by the Company. The assessment considered typical process arrangements and recoveries and provided
order-of-magnitude technical and cost information for gaseous and liquid Helium cases.
The indicative modelling suggested that a two-well development may have commercial potential if each well can sustain a
Helium flow rate of approximately 29 thousand standard cubic feet per day, with scale-up to a larger number of wells
improving the indicative commercial metrics. The scenarios were not based on a defined Contingent Resource and did not
constitute a feasibility study or forecast of project economics. The Group intends to refine the work using actual flow-test
data and any subsequent resource definition.
Full technical details are available from the Company’s ASX release of 29 June 2026.
Corporate Activities
The strategic investment completed in July 2025 materially strengthened the Company’s funding position and introduced
three industry participants with capabilities relevant to the Company’s intended development pathway. In addition to field
activity, the Company continued engagement with potential technology providers, customers, investors, government and
strategic partners.
During the March 2026 quarter, the Company received an R&D tax refund of $2,708,806 relating to eligible FY2025
activities. The refund assisted in funding the Group’s ongoing exploration, appraisal and technical work programs.
The Group continued to progress Native Title and other preliminary work required to advance its petroleum exploration
licence applications toward grant. Desktop geological, geophysical and geochemical studies were undertaken to prioritise
future field programs once the relevant titles are granted.
Resources and Reserves Statements
Table 1 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources of Hydrogen in '000 tonnes – effective 30 September 2021
PEL Prospects
SPE-PRMS
Sub-class
1U Low 2U Best Mean 3U High Pg Pd Pc
PEL 687 All Prospects
and Leads
207 1,313 4,187 8,820 22% 48% 10%
Yorke Peninsula
PEL 687 Ramsay FB Prospect 124 931 2,712 6,989 22% 50% 11%
PEL 687 Ramsay Lst Prospect 10 70 191 492 26% 50% 13%
PEL 687 Maitland Lead 7 26 40 92 17% 35% 6%
Kangaroo Island
PEL 687 Navigator Lead 34 152 280 678 19% 40% 8%
PEL 687 Kanmantoo Prospect 32 134 237 569 25% 40% 10%
* This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the notes below, and it
should be noted that the estimated quantities of Natural Hydrogen that may potentially be recovered by the
application of a future development project(s) relate to undiscovered accumulations. These estimates have both an
associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially recoverable Natural Hydrogen.
Gold Hydrogen Limited
Directors' report
30 June 2026
11
Notes:
1 This reserves statement presents Gold Hydrogen’s Prospective Resources. Gold Hydrogen currently has no Reserves
and no Contingent Resources.
2 Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS 2018 with the
understanding that naturally occurring Hydrogen may be considered a hydrocarbon since it has energy content and
can be used stand alone and/or blended with sales gas. “U” implies Prospective Resources.
3 Per ASX Listing Rules 5.28.4 and 5.28.5 estimates are unrisked and aggregated arithmetically by category, hence
caution that the aggregate low estimate may be a very conservative estimate and the aggregate high estimate may be
a very optimistic estimate due to the portfolio effects of arithmetic summation.
4 Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the “full distribution” and
has not been truncated by application of the MEPS (minimum economic pool size concept).
5 The Reference Point is at the wellhead/edge of lease (i.e. wellhead facilities) so the estimates have no deduction for
flare, vent or fuel consumed in operations.
6 Pg (Chance of Geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality = Pg x Pd) are
calculated as a weight average of the P50’s of the H2 (‘000 Tonnes) of the prospects.
7 Pg incorporates Play Risk and Prospect Risk.
8 Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (i.e. not just economics).
9 Information in the table is rounded. Some totals in the tables may not add due to rounding.
10 This reserves statement:
a. is based on, and fairly represents, information and supporting documentation prepared by the qualified petroleum reserves and
resources evaluators listed in note 14 below. Details of each qualified petroleum reserves and resources evaluator’s employment
and professional organisation membership are set out in note 13 below;
b. has been approved by Luke Titus, who is a qualified petroleum reserves and resources evaluator and whose employment and
professional organisation membership details are set out in note 14 of this reserves statement;
c. is issued with the prior written consent of Luke Titus and Teof Rodrigues & Associates (“TRA” - involving Teof Rodrigues, Paul
Strong, and Greg Horton, whose employment and professional organisation membership details are set out in note 13 of this
reserves statement) as to the form and context in which the estimated Natural Hydrogen resources and the supporting information
are presented.
11 There is no change to information or additional information, since the effective date of 30 September 2021, that Gold
Hydrogen and TRA are aware of that would materially change the estimates in this reserves statement.
12 Gold Hydrogen engages independent experts TRA to evaluate reserves and resources.
13 Qualified Petroleum Reserves and Resources Evaluators are:
Name Employer* Professional organisation
Luke Titus Gold Hydrogen SPE
Teof Rodrigues Teof Rodrigues & Associates SPE, PESA
Paul Strong Teof Rodrigues & Associates GSL, AAPG, PESA
Greg Horton Teof Rodrigues & Associates SPE
* As at 30 September 2021
Table 2 – Prospective Resource Statement for Helium
Gold Hydrogen Prospective Resources of Helium in Bcf – Ramsay Project (PEL 687 Yorke Peninsula), effective 21 February
2024
PEL Prospect
SPE-PRMS
sub-class Formation 1U Low 2U Best Mean 3U High Pg Pd Pc
687 All prospects All formations total 7 41 96 243 17% 60% 10%
Ramsay Fault Block Prospect Kulpara Formation 0.8 3.6 7.0 17.1 29% 60% 17%
687 Ramsay Fault Block Prospect Winulta Formation 0.1 0.6 1.6 4.0 12% 60% 7%
Ramsay Fault Block Prospect Fractured Formation 0.7 3.8 6.9 16.7 13% 60% 8%
Ramsay Fault Block Total 2 8 15 38 20% 60% 12%
South of Ramsay Fault Block Prospect Kulpara Formation 2.1 12.8 30.5 77.6 23% 60% 14%
South of Ramsay Fault Block Prospect Winulta Formation 0.3 2.4 7.7 19.8 8% 60% 5%
687 South of Ramsay Fault Block Prospect Fractured Basement
Hilbata Suite
1.6 10.3 25.5 65.2 12% 60% 7%
South of Ramsay Fault Block Prospect Fractured Basement
Yorke Peninsula Heel
1.4 7.7 17.0 42.7 12% 60% 7%
South of Ramsay Fault Block Total 5 33 81 205 16% 60% 10%
Gold Hydrogen Limited
Directors' report
30 June 2026
12
* This estimate of Helium Prospective Resources must be read in conjunction with the notes below.
These Helium Prospective Resources are estimated quantities of Helium that may potentially be recovered by the
application of a future development project(s) relate to undiscovered accumulations. These estimates have both an
associated risk of discovery (Pg) and a risk of development (Pd). Further exploration, appraisal and evaluation is required
to determine the existence of a significant quantity of potentially recoverable Helium.
Notes:
1 This table presents Gold Hydrogen's Prospective Resources for Helium in the Ramsay Field of Yorke Peninsula only.
Gold Hydrogen currently has no Reserves and no Contingent Resources.
2 Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS 2018. SPE have
provided guidance regarding the Extension of PRMS Principles to Non-Hydrocarbon/Non-Traditional Situations
including Helium (and Hydrogen). Refer: https://www.spe.org/en/industry/reserves/non-hydrocarbons/
3 Per ASX LRs 5.28.4&5 estimates are unrisked and aggregated arithmetically by category, hence caution that the
aggregate low estimate may be a very conservative estimate and the aggregate high estimate may be a very optimistic
estimate due to the portfolio effects of arithmetic summation.
4 Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the "full distribution" and
has not been truncated by application of the MEPS (minimum economic pool size) concept.
5 The Reference Point is at the wellhead/edge of lease (i.e. wellhead facilities) so the estimates have no deduction for
flare, vent or fuel consumed in operations.
6 Pg (Chance of geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality = Pg x Pd) are
calculated as a weight average of the P50's of the Helium Bcf (Billion Cubic Feet) of the prospect formations.
7 Pg incorporates Play Risk and Prospect Risk.
8 Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (i.e. not just economics).
9 Information in the table and throughout the Report is rounded. Some totals in the tables may not add due to
rounding.
10 There is no change to information or additional information, since the effective date of 21 February 2024, that Gold
Hydrogen and TRA are aware of that would materially change the estimates in this reserves statement.
It should be noted that the estimated quantities of Helium that may potentially be recovered by the application of a
future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of
discovery and a risk of development. Further exploration, appraisal and evaluation is required to determine the
existence of a significant quantity of potentially recoverable Helium.
QPRRE Statement
The Prospective Resource Statement in this announcement is based on, and fairly represents, information and supporting
documentation prepared by independent consultants “Teof Rodrigues & Associates” (Mr Teof Rodrigues, Mr Paul Strong
and Mr Greg Horton) and Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, with an effective date of 21
February 2024.
The Prospective Resource Statement has been included in this announcement:
(1) under the approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, who is a Qualified Petroleum
Reserves and Resources Evaluator; and
(2) with the prior written consent of Mr Billy Hadi Subrata and “Teof Rodrigues & Associates” (Mr Teof Rodrigues, Mr Paul
Strong and Mr Greg Horton) as to the form and context in which the Helium prospective resource statement and
supporting information are presented.
The employment and professional organisation membership details of Mr Billy Hadi Subrata, Mr Teof Rodrigues,
Share your feedback
Discover