Gold Hydrogen Limited – Quarterly Activities Report
Quarterly Activities Report for the Period Ended
30 September 2025
GOLD HYDROGEN LTD (ASX:GHY)
Shares on Issue
180,454,285
Market Capitalisation
A$101m (at A$0.56 per share)
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Company Secretary / CFO
Karl Schlobohm
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
Company Contacts:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
Karl Schlobohm – Company Secretary
kschlobohm@goldhydrogen.com.au
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Company Information:
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
X: @GHY_ASX
HIGHLIGHTS FOR THE SEPTEMBER QUARTER
Closure of the combined strategic investment of $14.5
million from Toyota Motor Corporation, Mitsubishi
Gas Chemical Inc, and ENEOS Xplora Inc into Gold
Hydrogen, as announced by the Company on 3 July
2025. The investment was undertaken via a placement
of 20,714,285 fully paid ordinary shares at $0.70 per
share, representing a premium of 22% to the
Company’s closing price of $0.575 on the ASX on 2 July
2025.
The strategic investment will fund further drilling in
the Ramsay fairway, leveraging the results from the
Company’s maiden drilling and well testing campaigns
at Ramsay-1 and Ramsay-2, and will help to advance
future downstream / commercialisation opportunities
for the Ramsay Project.
The Company has made a number of key appointments
as part of the expansion of its management team,
including Simon Talbot as Chief Commercial Officer.
Exploration activities are scheduled to recommence
with the spudding of the Ramsay 3 exploration well
around 6 – 10 November 2025. For this upcoming
program, the Company is planning to drill two or three
wells to appraise specific target zones within identified
structures.
The well design for the 2025 / 26 campaign includes a
larger diameter well bore to enable greater flexibility
for well testing in Q1, 2026. The data to be gathered
from the drilling and testing of the wells in this
campaign is expected to inform potential future pilot
project area(s) and design(s), with the aim of
demonstrating the commercial production potential of
both Natural Hydrogen and Helium from the Ramsay
Project.
Gold Hydrogen Limited | ABN 74 647 468 899 | goldhydrogen.com.au | info@goldhydrogen.com.au
Level 14, 110 Eagle Street (GPO Box 801) Brisbane, QLD 4000
CORPORATE ACTIVITIES
Strategic Investment Partners Secured
On 3 July 2025 the Company announced that that it had received binding commitments for a total
investment of $14.5 million from Toyota Motor Corporation, Mitsubishi Gas Chemical Inc, and ENEOS
Xplora Inc into Gold Hydrogen. The strategic investment was settled later in July via a placement of
20,714,285 fully paid ordinary shares at $0.70 per share, representing a premium of 22% to the Company’s
closing price of $0.575 on the ASX on 2 July 2025.
The proceeds of this strategic investment will fund further drilling in the Ramsay fairway leveraging the
results from the Company’s maiden drilling and well testing campaigns at Ramsay 1 and Ramsay 2, and
will help to advance future downstream / commercialisation opportunities for the Ramsay Project.
The investment has also established a strategic collaboration focused on evaluating long-term
opportunities across the Natural Hydrogen and Helium value chain, including:
Exploration, extraction and ultimately production at Gold Hydrogen’s flagship Ramsay Project in
South Australia;
Evaluation of potential Hydrogen supply opportunities for mobility and industrial uses, together with
transportation fuel cell and power generation platforms;
Collaboration on a review of existing and emerging technologies regarding the potential for future
Natural Hydrogen purification and utilisation, and potential associated R&D projects;
Investigation of potential future commercialisation pathways, including green methanol production.
In addition to the upcoming field activities at the Ramsay Project, the parties are actively considering the
potential for further investment opportunities, technical collaboration, downstream opportunities and
offtake arrangements.
Corporate and Technical Appointments
Appointment of Chief Commercial Officer
The Company is pleased to announce the appointment of Simon Talbot as Chief Commercial Officer.
Simon has joined the Company having recently finalised the successful sale of the $1.9B Green Methanol
/ Green Hydrogen project at Bell Bay Tasmania. He is a passionate advocate for utilising Australia’s
sustainable competitive advantages and the enormous potential for Natural Hydrogen and biomass to be
combined to make low carbon liquid fuels.
Simon is well known to Japanese and North American investment groups, and has worked for over 25 years
across renewables as an Agribusiness Executive for some of Asia Pacific’s leading companies including Kraft
Foods, Australian Paper, Cadbury, Glencore and Coles Group.
Simon holds a BSc Earth Sciences, MBA UNSW and is a GAICD.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Appointment of Additional Technical Team Members
The Company has bolstered its Natural Hydrogen expertise by appointing geologist Hugo Beldame to work
with the existing geological and technical team in Brisbane and Perth.
Hugo has previously worked for 2H Resources and French Company 45-8 Energy, where he was involved
with various geological work program designs and field execution.
Hugo holds Masters Degrees in Petroleum Geology (France) and Geoscience Exploration (Norway).
In addition, the Company has appointed Leon Hennessey under a contract arrangement to act as the
Company’s General Manager of Operations to oversee the Ramsay Project’s 2025 drilling and 2026 well
testing campaigns as outlined above.
With broad industry experience working in most major energy markets, Leon has practical hands-on
experience throughout the well construction life cycle encompassing project management, engineering,
and optimization.
Since 2010, Leon has held various senior management positions for Eastern Hemisphere markets including
National Oilwell Varco as Director of Drilling Automation & Optimisation, and ModuSpec as Regional
Director. As an upstream consultant focussed on Projects, Drilling and Wells he delivered projects
successfully in multiple markets focussed predominantly on unconventional energy particularly with CBM,
CSG and Shale plays helping both emerging and established operators optimise field developments,
explore new areas, enhance and optimise well construction or understand and mitigate risks through the
application of significant lessons learned, solutions, technology and practical know how.
EXPLORATION AND TECHNICAL ACTIVITIES
General Background
Gold Hydrogen is focused on the discovery and development of Natural Hydrogen and Helium gases in a
potentially extensive and world class Natural Hydrogen and Helium province in South Australia. The
forecast domestic and global demand for Hydrogen, combined with new Natural Hydrogen exploration
techniques and experienced personnel, provides Gold Hydrogen with an extraordinary opportunity to
define and ultimately develop a new Natural Hydrogen gas province. Further to this, Helium is extremely
rare and expensive, there is limited world-wide production, and no production of Helium in Australia at
present. Gold Hydrogen is well placed to potentially prosper from this opportunity.
The combined gas-related permit area of the Gold Hydrogen group exceeds 75,000km2
. Gold Hydrogen
holds one granted exploration license (the Ramsay Project - PEL 687) and one application area, whilst its
two 100% owned subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an
additional seven (7) applications for Natural Hydrogen and Helium exploration within South Australia.
Gold Hydrogen is also the preferred applicant for four (4) gas storage exploration licenses applications
(GSELA) covering an area approximating 8,000km2
within the Yorke Peninsula portion of PEL 687 in South
Australia. These storage licence applications are in addition to the granted exploration licence and
application licences.
A summary of the status of the group’s petroleum, mineral and storage licence tenure at the end of the
Quarter is outlined in Appendix A.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 1: Gold Hydrogen PEL 687 and PELA’s located in South Australia
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
2025 / 26 Drilling and Well Testing Campaign
Following Gold Hydrogen’s successful drilling campaign in late 2023, the Company will continue its
exploration activities with drilling expected to commence at the Ramsay 3 exploration well around 6 – 10
November 2025. For this upcoming program, the Company is planning to drill two or three wells to
appraise specific target zones within identified structures, chosen with reference to the results of the
maiden drilling and testing campaign, as well as the interpretations leading from the 2D seismic survey
conducted in the second half of 2024.
The primary objectives for the 2025 drilling program are to:
1. Delineate and confirm the presence of Natural Hydrogen and Helium beyond the successful Natural
Hydrogen and Helium gas shows at the Company’s Ramsay 1 and 2 wells;
2. Provide optimal conditions for well testing and extracting Natural Hydrogen and Helium to surface;
3. Mature the Ramsay Project via further appraisal in preparation for potential commercial development
decisions; and
4. Assist with the development of a blueprint for future exploration and appraisal initiatives across the
Company’s wider portfolio.
A significant amount of data was gathered during the previous drilling and testing program which
concluded in mid-2024, and a detailed review and analysis of that data has now been concluded. That
work, combined with the 2D seismic survey interpretation, has resulted in the plan for the Company’s 2025
/ 26 drilling and well testing program which will commence with the Ramsay 3 well to be drilled up-dip
and approximately 2km from the Ramsay 1 well, on a geological structural high in the area.
The Ramsay 1 and 2 exploration wells were drilled to confirm the presence of Natural Hydrogen, and the
location of those wells was deliberately selected adjacent to the historic Ramsay Oil Bore 1 drilled in 1931
which had Hydrogen shows recorded. Based on the results of the 2023 / 24 campaign, the 2D seismic
survey analysis and other information, the Company considers the Ramsay 3 well location to be more
optimal, and up-dip from the previous well sites.
Subject to the results of the Ramsay 3 drilling, a further one or two wells are planned for this drilling
campaign. These will be in relatively close proximity to Ramsay 1, 2 and 3 with a view to establishing a
pilot project in this area, subject to results.
The Ramsay 1 and 2 exploration wells were designed with small diameter well bores and a 4 ½” casing to
keep costs as low as practical whilst still being able to run logging tools to gather data, and to specifically
verify the presence of Natural Hydrogen adjacent to the historic 1931 Ramsay Oil Bore location. In the
Company’s 2023 drilling campaign, not only was the presence of Natural Hydrogen confirmed (at air-
corrected purity levels up to 95.8%1), the presence of Helium was also confirmed (at air-corrected purity
levels up to 36.9%2), as well as elevated levels of Helium-33, significantly adding to the potential
commercialisation options for the Ramsay Project.
1
Refer ASX release of 27 May 2024 for full details. Technical table also appended.
2
Refer ASX release of 17 October 2024 for full details. Technical table also appended.
3
Refer ASX release of 30 October 2024 for full details. Technical tables also appended.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 2: Map showing Ramsay well locations (existing and planned) relative to 2D seismic lines
Following the positive drilling results from drilling the Ramsay 1 and 2 wells, the Company carried out well
testing activities to gain knowledge of the reservoir characteristics. Much data was gathered and the
findings from the tests has also contributed to the well design for this 2025 / 26 program. A key impact
on the testing of the Ramsay 1 and 2 wells was the limited ability to dewater the wells due to the restricted
approvals and testing timelines.
The well design for the 2025 / 26 campaign includes a larger diameter well bore with 7” casing to enable
greater flexibility for well testing. The data expected to be gathered from the drilling and testing of the
wells in the Company’s 2025 / 26 program will inform potential future pilot project area(s) and design(s),
with the aim of demonstrating the commercial production potential of both Natural Hydrogen and Helium
from the Ramsay Project.
Ramsay Project – 2026 Exploration Well Testing Campaign
The Company intends to test Ramsay 3, and potentially Ramsay 4 and 5, during 2026. The detailed
planning for well testing is underway, and will be refined based on the results from drilling. The well testing
program is currently scheduled to commence in Q1 2026. The objective of the well testing includes the
movement of both Natural Hydrogen and Helium to surface under conditions designed to support
conceptual designs and studies for one or more pilot projects to demonstrate potential project viability
for both Natural Hydrogen and Helium production, and to gather further data from the sampling of fluid
and gas during the testing operations.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Ramsay Project – Potential 2026 Resource Delineation Drilling and Regional Targets
The 2D seismic survey carried out in 2024 revealed several regional Natural Hydrogen and Helium
prospects within PEL 687, some of which will be tested with future dedicated exploration wells. The
selection and timing of these regional exploration wells may be undertaken in conjunction with planned
further appraisal / delineation drilling activities. The anticipated timing for this workstream is mid to late
2026.
Ramsay Project – Green Methanol Feasibility Study
Gold Hydrogen is actively assessing a number of potential commercial opportunities for a successful
development of the Ramsay Project, including green ammonia and green methanol, as well as pure Natural
Hydrogen and Helium gas options. Green methanol is a key fuel choice for decarbonising shipping and
aviation because it is liquid at room temperature, making it easier to store and transport than gaseous
Hydrogen, and its use in existing or easily converted engines results in significant lifecycle CO2 emission
reductions. Major shipping companies are currently ordering methanol-ready ships, and investing in green
methanol production to meet net-zero targets.
The Yorke Peninsula is very well placed to be a global green methanol production hub with abundant waste
agricultural biomass (biogenic carbon) and renewable energy sources. Critical to the production of green
methanol is cost-competitive Hydrogen, which the Company is striving to bring to commercialisation via
its Ramsay Natural Hydrogen and Helium Project.
The production of green methanol made using Natural Hydrogen is expected to have commercially
competitive advantages over green methanol produced via electrolysis-derived (ie. man-made) Hydrogen,
based on the evidence available from the Bourakebougou Natural Hydrogen Field in Mali. Gold Hydrogen’s
Ramsay Project has a significant prospective resource of Natural Hydrogen which it is aiming to advance
via the technical programs outlined above.
An initial analysis of the biogenic carbon sources in and around the Yorke Peninsula indicate a readily
available supply of up to 1.5 million wtpa (wet tonnes per annum) of compliant biomass4
. Furthermore,
long-term renewable energy pricing (solar / wind / BESS (battery energy storage systems)) indicates that
a project on the Yorke Peninsula can be supplied at economic rates via the electricity network5
. Port
infrastructure and capacity is also available on the Yorke Peninsula (eg. Port Giles, Ardrossan) for importing
and exporting activities.
Gold Hydrogen plans to assess all of these factors in detail and complete a Feasibility Assessment of the
green methanol opportunity, and has appointed Mr Simon Talbot to help spearhead this initiative (refer
below). Based on the results of the Feasibility Assessment, a pilot plant will be considered and costed for
initial production.
Current Green Methanol pricing is USD850-1,050 per tonne6
, and is already in use within the international
shipping industry.
4
South Australian Crop and Pasture Report 2024-25, January 2025.
5
Australian Energy Market Operator, 2024 ELI Report, June 2024 (Appendix 5 – South Australia).
6
Methanol Institute: Methanol Institute (2024). "Economic Value of Methanol for Shipping under FuelEU Maritime
and EU ETS." Analysis by Dr. Jeroen Dierickx.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
The Company will provide more detailed updates on this initiative once the Feasibility Assessment
commences.
Regional Application Areas – Preliminary Studies
The Company continues to progress several of its application areas towards granted status via the ongoing
advancement of Native Title related matters. In addition, the Company continues with its desktop analysis
of the publicly available South Australian Resource Information Gateway (SARIG) datasets, as well as a
range of historical information, to compile a preliminary subsurface data suite.
The focus of this activity is on transposing the learnings to date from the Ramsay Project to identify Natural
Hydrogen exploration focus areas within its regional application portfolio in South Australia.
Initial technical areas where learnings from the Ramsay Project are being applied include:
Analysis of the regional tectonic and geological settings;
Petrophysical, stratigraphic and basement studies;
Impact of fracture zones and structural boundaries;
Seal and trap potential within different geological domains;
Analysis of the potential for radiolytic and / or iron-bearing alteration sources in the basement suites;
Analysis of historic core samples for potential Natural Hydrogen and Helium within fluid inclusions
(refer below);
Preliminary interpretation of the GA seismic line data (refer below).
Historic Core Samples and Study of Fluid Inclusions
Gold Hydrogen geologists have recently made several visits to the South Australian Drill Core Library to
review and gather samples from historic third-party drill cores from within several of the group’s regional
application areas for testing and analysis. The aim of the testing of these core samples will be to detect
any Natural Hydrogen and Helium in paleo-fluid inclusions, similar to the previous campaign undertaken
by the Company for PEL 687 in 2023. The findings will help to identify promising areas within the
application areas for gas generation and migration in order to guide further geological studies and future
on-ground exploration efforts.
The results for the core sample analysis for the PELA 688 application area are expected in the next weeks,
followed by a number of the White Hydrogen Australia application areas, and then PELA 792.
The results of the fluid inclusion studies will be combined with an analysis of the Geoscience Australia
seismic data available (refer below) to assist with the delineation of areas of interest and future drill targets
across the application area portfolio.
Formal on-groundwork programs will commence on each application area as they are granted.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 3: Map showing the current fluid inclusion study points across the group’s application areas.
Geoscience Australia Seismic Line
Geoscience Australia released the data associated with a regional seismic line acquired in 2022 along public
roads which transverses part of the Gold Hydrogen group’s application footprint (specifically PELA’s 792,
703 and 702), as outlined in Figure 4 and Figure 5 below.
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures incurred,
during the Quarter.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 4: Map showing the GA seismic line transversing a number of the group’s application areas.
Gold Hydrogen Limited | ABN 74 647 468 899 | goldhydrogen.com.au | info@goldhydrogen.com.au
Level 14, 110 Eagle Street (GPO Box 801) Brisbane, QLD 4000
Figure 5: Cross Section of the Geoscience Australia Seismic Line Traversing Part of the Group’s Application Areas
A’
A
`
Gold Hydrogen Limited – Quarterly Activities Report p. 12
Groundbreaking Exploration Testing for Both Natural Hydrogen and Helium
The Ramsay Project well testing program was the first dedicated Natural Hydrogen and Helium well
test operation conducted in Australia, and to the Company’s knowledge, it is likely one of only a few
in the world. The Company considers this to represent the initial steps of an exciting journey, which
is not dissimilar to that undertaken by various world-renowned and ultimately successful oil and gas
projects, such as the early days in the CSG and shale industries. For those particular resources, the
exploration and completion techniques were developed and optimised over time, improving project
economics and ultimately leading to major projects being developed. The Company anticipates a
similar path forward for its Natural Hydrogen and Helium prospective resources, although the
timeframe may be quicker as drilling and completions technologies developed for other gas resources
may be applicable to its Natural Hydrogen and Helium projects.
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to be potentially developed
over time.
There is very little data available for dedicated Natural Hydrogen wells anywhere in the world due to
the lack of analogue wells. To the Company’s knowledge, the only Natural Hydrogen field currently in
production is located in Mali, West Africa, where Natural Hydrogen production is used to power the
small town of Bourakébougou. It has been reported that the Natural Hydrogen wells in Mali do not
have any decline in production and are continually regenerating and producing at the same rate.7
Helium is extremely valuable and indicatively, longer-term bulk pricing is expected to be up to USD450
per Mcf (thousand cubic feet).8
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate
to the presence, recovery, and potential volumes of Natural Hydrogen and Helium, but also due to the
location of the current and potential project sites within agricultural areas and proximal to National
Parks on both the Yorke Peninsula and Kangaroo Island, requiring significant landholder and
community engagement. The worldwide, Federal and South Australian Government and industry
efforts to secure Hydrogen as an alternative energy source provides confidence that any technical and
social concerns may be overcome.
7
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with
hydrocarbons”, First Break Volume 40, October 2022 (available via www.goldhydrogen.com.au/technical-
articles/)
8
February 2024, www.nobleHelium.com.au, quoting Konbluth Helium Consulting.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 13
FINANCIAL REPORTING
Exploration expenditures that were outlaid during the Quarter primarily relate to the Company’s
flagship Ramsay Project (PEL 687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure Amount
Airborne and seismic surveys and sub-surface studies $116,705
Environmental and permitting costs $81,634
Native Title, land access and licence fees $152,481
Drilling and related activities $1,428,404
Total $1,779,224
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $201,929 for the September 2025 Quarter
(although some payments made during the Quarter may relate to prior periods).
Lodgement of 2025 R&D and Tax Returns
Following the end of the Quarter, the Company finalised and lodged its 2025 R&D claim as part of its
company tax return process. The R&D refund expected in relation to FY2025 is approximately $2.7m
InvestorHub Portal to Boost Investor Engagement
Earlier in 2025 Gold Hydrogen Ltd (ASX: GHY) launched a new InvestorHub for dedicated investor
engagement.
It enables shareholders, stakeholders, and prospective investors to learn more about the Company's
exploration activities in what is shaping as its most important year to date.
As Gold Hydrogen continues on its journey to demonstrate that it can ultimately commercialise the
high purity levels of Hydrogen and Helium confirmed in its South Australian tenement, it will open the
opportunity for investors to communicate with the Company’s leadership team more directly.
The Company will regularly upload new content to the hub, including videos accompanying select
announcements, education material, interviews and corporate research.
Gold Hydrogen invites shareholders and interested parties to join InvestorHub as follows:
1. Click on the following link to create an account:
https://investorhub.goldhydrogen.com.au/auth/signup
2. Follow the prompts to complete the sign-up process. Gold Hydrogen encourages investors to
post questions/feedback through the Q&A function accompanying each piece of content to
engage with the leadership team and gain a better understanding of the Company’s exploration
activities and announcements.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 14
This report has been authorised for release by the Board.
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldhydrogen.com.au kschlobohm@goldhydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
Website: www.goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
Twitter: @GHY_ASX
Contact: info@goldhydrogen.com.au
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which
are outside the control of the Company and which are subject to change without notice and could
cause the actual results, performance or achievements of the Company to be materially different from
the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Nothing contained in this announcement, nor any information made available to you
is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past,
present or the future performance of Gold Hydrogen Limited.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 15
Appendix A
Overview of the Gold Hydrogen Group’s PEL, PELAs, GSELAs and EL
Permit
Project
Name
Gold
Hydrogen
Interest
Applicant
Geologic Area
& Basin
Size
(km2)
Term
Grant
Date
Application
Date
Expiry
Date
Status Act
PEL 687 Ramsay 100%
Gold
Hydrogen
Limited
Stansbury Basin
& Kanmantoo
Trough
7,820 5 years 22/7/21 - 21/07/26 Granted
PGEA
2000
EL 6988 Warooka 100%
Sustainable
Minerals
Group Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
542 6 years 10/4/24 - 9/4/30 Granted
MA
1971
PEL(A) 688 Kanmantoo 100%
Byrock
Resources
Pty Ltd
Stansbury Basin
& Kanmantoo
Trough
9,962 5 years - 12/5/21 - Pending
PGEA
2000
PEL(A) 699 Robe 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Otway Basin
9,624 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 700 Padthaway 100%
White
Hydrogen
Australia Pty
Ltd
Padthaway
Ridge-
Kanmantoo
Platform &
Troubridge Basin
9,748 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 701 Troubridge 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Troubridge Basin
9,750 5 years - 19/7/21 - Pending
PGEA
2000
PEL(A) 702 Renmark 100%
White
Hydrogen
Australia Pty
Ltd
Kanmantoo
Platform &
Renmark