Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Gold Hydrogen Limited – Quarterly Activities Report
Quarterly Activities Report for the Period Ended
30 June 2026
GOLD HYDROGEN LTD (ASX:GHY)
Shares on Issue
180,454,285
Market Capitalisation
A$72m (at A$0.40 per share)
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Company Secretary / CFO
Karl Schlobohm
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
Company Contacts:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
Karl Schlobohm – Company Secretary
kschlobohm@goldhydrogen.com.au
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Company Information:
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
X: @GHY_ASX
HIGHLIGHTS FOR THE JUNE QUARTER
Testing campaign for Gold Hydrogen’s Ramsay exploration
wells will commence in approximately a week, testing the
potential flow of Natural Hydrogen and Helium to surface
from the Ramsay 1, 2 and 3 exploration and appraisal wells.
The Company has identified a number of preliminary
commercialisation pathways for both Natural Hydrogen
and Helium, subject to the result of its upcoming well
testing campaign.
Non-binding MOU executed with Mitsubishi Gas Chemical
Company, Inc (MGC), a global leader in methanol
production technology and an existing strategic
shareholder in Gold Hydrogen, for studies associated with
the potential development of a green methanol production
facility utilising the Company’s Natural Hydrogen on the
Yorke Peninsula.
Subject to satisfactory PFS outcomes and firm Natural
Hydrogen supply conditions, the parties may then progress
to a Definitive Feasibility Study (DFS) and subsequently to
Front End Engineering Design (FEED).
Worley Consulting has completed an independent high-
level commercial assessment of three indicative Helium
production scenarios, based on inputs provided by the
Company, for its 100%-owned Ramsay Project on the Yorke
Peninsula, South Australia.
Modelling undertaken by Worley indicates that Ramsay
may have the potential to be commercially viable with as
few as two wells, assuming sustained Helium flow rates of
~29 thousand standard cubic feet (Mscf) per day per well.
Scaling to ten wells is indicated by Worley to improve the
NPV, IRR and payback for a gaseous product.
Subject to flow-testing outcomes and potential contingent
resource definition, Gold Hydrogen intends to progress an
accelerated FEED process, positioning a Helium-focused
development at Ramsay as the initial commercial platform
for longer-term Natural Hydrogen and Helium exploitation.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 2
EXPLORATION AND TECHNICAL ACTIVITIES
General Background
Gold Hydrogen is focused on the discovery and development of Natural Hydrogen and Helium gases
in a potentially extensive and world class Natural Hydrogen and Helium province in South Australia.
The forecast domestic and global demand for Hydrogen, combined with new Natural Hydrogen
exploration techniques and experienced personnel, provides Gold Hydrogen with an extraordinary
opportunity to define and ultimately develop a new Natural Hydrogen gas province. Further to this,
Helium is extremely rare and expensive, there is limited world-wide production, and no production of
Helium in Australia at present. Gold Hydrogen is well placed to potentially prosper from this
opportunity.
The combined gas-related permit area of the Gold Hydrogen group exceeds 75,000km2
. Gold
Hydrogen holds one granted exploration license (the Ramsay Project - PEL 687) and one application
area, whilst its two 100% owned subsidiary companies (White Hydrogen Australia and Byrock
Resources) hold an additional seven (7) applications for Natural Hydrogen and Helium exploration
within South Australia. Gold Hydrogen is also the preferred applicant for four (4) gas storage
exploration licenses applications (GSELA) covering an area approximating 8,000km2
within the Yorke
Peninsula portion of PEL 687 in South Australia. These storage licence applications are in addition to
the granted exploration licence and application licences.
A summary of the status of the group’s petroleum, mineral and storage licence tenure at the end of
the Quarter is outlined in Appendix A. Refer also to the map at Figure 1.
Ramsay Flow Testing Operational Update
The 2026 Ramsay flow test campaign has moved firmly into implementation phase, with site
preparation works well advanced and mobilisation of equipment and crews to site now underway.
Final system integration testing of electrical equipment, including Electric Submersible Pumps (ESP’s)
and a Variable Speed Drive (VSD), is currently being carried out in Adelaide, with shipping scheduled
to site next week for installation and field checks before the commencement of flow testing at Ramsay
1.
Key regulatory approvals, including early works and groundwater reinjection approvals, have been
received, and the Company expects SWS Rig 04 workover rig acceptance at the Ramsay 1 wellsite in
the coming days.
Ramsay Flow Test Campaign Scope
Prior drilling and well testing campaigns at Ramsay have confirmed exceptional gas purity results, with
air-corrected Natural Hydrogen purities of up to 97%1
and air-corrected Helium purities of up to
36.9%2
, together with formation evaluation results supporting the continuity of the Natural Hydrogen
and Helium bearing reservoirs across the broader project area.
The 2026 Ramsay flow test campaign is designed to assess the Natural Hydrogen and Helium flow
potential of the Ramsay Project, building on the Company’s successful drilling and associated
evaluation activities to date.
1 Refer ASX announcement of 2 December 2025. Technical table appended.
2Refer ASX announcement of of 17 October 2024. Technical table appended.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 3
The campaign will focus on the flow testing of three (3) wells – Ramsay 1, Ramsay 2 and Ramsay 3
over a period of up to three (3) months. Flow testing will be supported by ESPs and temporary surface
flow test facilities, and will also include the zonal testing of specific Natural Hydrogen and Helium
bearing reservoirs.
A key objective of the campaign is to measure sustained flow rates across prospective Natural
Hydrogen and Helium formations, and to provide the data required to accelerate the Company’s
ongoing commercial assessment studies.
The previous 2024 exploration well testing program utilised a 180bbl/day mechanical pump, whereas
the 2026 flow test campaign will be utilising a 2,000bbl/day ESP for Ramsay 1 and Ramsay 2. Due to
the larger wellbore sizing specifically planned at the time of drilling, the Ramsay 3 well will be tested
utilizing a 20,000bbl/day ESP.
Results from the campaign will be a key catalyst for the Ramsay Project, underpinning the Company’s
ongoing evaluation of its potential commercialisation pathways, as detailed in its previous release of
20 May 2026. Further objectives from the campaign include gathering sufficient data to potentially
book contingent resources, planning for future field development activities, and ultimately the
progression of Front-End Engineering Design (FEED) activities.
Figure 1: Gold Hydrogen PEL 687 and PELA’s located in South Australia
`
Gold Hydrogen Limited – Quarterly Activities Report p. 4
Figure 2: Mobilisation of equipment at the Ramsay Project in preparation for the upcoming flow
testing campaign
Figure 3: Electric Submersible Pump (ESP) for Ramsay 1 and Ramsay 2 well flow test rated to a
maximum fluid flow rate of 2,000bbl/day undergoing factory acceptance tests
`
Gold Hydrogen Limited – Quarterly Activities Report p. 5
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
Groundbreaking Exploration Testing for Both Natural Hydrogen and Helium
The Ramsay Project well testing program was the first dedicated Natural Hydrogen and Helium well
test operation conducted in Australia, and to the Company’s knowledge, it is likely one of only a few
in the world. The Company considers this to represent the initial steps of an exciting journey, which
is not dissimilar to that undertaken by various world-renowned and ultimately successful oil and gas
projects, such as the early days in the CSG and shale industries. For those particular resources, the
exploration and completion techniques were developed and optimised over time, improving project
economics and ultimately leading to major projects being developed. The Company anticipates a
similar path forward for its Natural Hydrogen and Helium prospective resources, although the
timeframe may be quicker as drilling and completions technologies developed for other gas resources
may be applicable to its Natural Hydrogen and Helium projects.
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to be potentially developed
over time.
There is very little data available for dedicated Natural Hydrogen wells anywhere in the world due to
the lack of analogue wells. To the Company’s knowledge, the only Natural Hydrogen field currently in
production is located in Mali, West Africa, where Natural Hydrogen production is used to power the
small town of Bourakébougou. It has been reported that the Natural Hydrogen wells in Mali do not
have any decline in production and are continually regenerating and producing at the same rate.3
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate
to the presence, recovery, and potential volumes of Natural Hydrogen and Helium, but also due to the
location of the current and potential project sites within agricultural areas and proximal to National
Parks on both the Yorke Peninsula and Kangaroo Island, requiring significant landholder and
community engagement. The worldwide, Federal and South Australian Government and industry
efforts to secure Hydrogen as an alternative energy source provides confidence that any technical and
social concerns may be overcome.
CORPORATE ACTIVITIES
As previously disclosed, discussions are continuing with a range of industry parties interested in mid-
and / or down-stream commercialisation opportunities for Natural Hydrogen and / or Helium gases.
The Company continues to assess and evaluate a number of potential future commercialisation
pathways for its Natural Hydrogen and Helium gases.
3
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with hydrocarbons”, First Break
Volume 40, October 2022 (available via www.goldhydrogen.com.au/technical-articles/)
`
Gold Hydrogen Limited – Quarterly Activities Report p. 6
Potential Commercialisation Pathways Under Evaluation
(Refer ASX release of 20 May 2026 for full details)
As previously disclosed, Gold Hydrogen continues to engage with a range of domestic and
international parties in relation to its aspirations to commercialise the Ramsay Project. These
discussions have produced a number of potential future commercialisation pathways, contingent on
the success of the upcoming well testing campaign.
Some of the potential commercialisation pathways currently under consideration include the
following:
Potential Natural Hydrogen Pathways
Two Natural Hydrogen commercial pilot-level pathways are being considered in parallel, sequenced
so that the first pathway would directly support the potential for Helium production, and the second
potentially scaling into Liquid Natural Hydrogen export and Green Methanol over time. Quantum
Technology Corp of Canada has confirmed it can supply modular Natural Hydrogen purification
equipment, in addition to the Helium plant discussed under Helium Pathway 2.
Natural Hydrogen Pilot 1 — Natural Hydrogen to Energy for Helium Production
This pilot is currently being scoped, and would deploy a Hydrogen Fuel Cell on site at Ramsay,
converting Natural Hydrogen produced from the well stream into electricity, to power a modular
Helium purification plant. If this pathway is pursued, it would be intended to be operational alongside
the Project’s first Helium production (see below). Beyond its direct role powering the Helium plant,
the pilot would establish an integrated Natural Hydrogen-to-electrons reference installation for
off-grid power applications in remote Australia.
Natural Hydrogen Pilot 2 — Natural Hydrogen to Compressed Gas, Scaling to Liquid Natural Hydrogen
and Green Methanol
In parallel, the Company is progressing a compressed gaseous Natural Hydrogen pilot pathway,
comprising a modular Quantum Technology QPure-H₂ purification plant feeding fuel-cell-grade
Hydrogen into 350-bar tube trailers for a potential Hydrogen trucking trial with a major international
automotive partner. This pilot would be positioned as a direct sovereign substitute for imported diesel
on one of Australia’s highest-volume freight corridors. Subject to the performance of this pilot project
and offtake demand, the Company aspires to a scale-up pathway into two longer-dated streams: (i)
grid-scale liquefaction for Liquid Natural Hydrogen export to Japan, under discussion with established
Japanese industrial partners; and (ii) a Green Methanol stream, currently under a feasibility
assessment discussion with strategic shareholder Mitsubishi Gas Chemical for a potential facility on
the Yorke Peninsula (refer separate discussion below).
Potential Helium Pathways
Helium Pathway 1 — Scaled Helium Development
This pathway involves the consideration of a scaled gaseous and/or liquid Helium development on the
Yorke Peninsula. As described further in the Worley section below, Worley’s indicative modelling
considered scenarios ranging from two (2) wells up to a ten (10) well gaseous project, and up to twenty
(20) wells for a full commercial development. The Company’s objective under this pathway is to work
with Worley on an accelerated FEED process, with well count, plant capacity, product form (gaseous
versus liquid Helium) and phasing to be optimised against the actual upcoming Ramsay flow testing
outcomes. This pathway is positioned for the potential of a larger scale, longer-dated development
optionality for Helium at Ramsay.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 7
Helium Pathway 2 — Quantum Technology Commercial Helium Pilot
In parallel, the Company has received a preliminary budget proposal from Quantum Technology for a
modular, skid-mounted Helium purification plant designed to be potentially matched to the best one
to two (1–2) wells from the upcoming Ramsay flow testing program. Quantum Technology is an
experienced supplier of modular Helium plants, with reference facilities in North America, and a
product range covering single-well and multi-well configurations. The Quantum pilot would be
positioned as a smaller-scale, lower capital, faster-to-market option that could potentially deliver first
commercial Helium production from Ramsay, with the aim of re-establishing domestic Helium supply
to the Australian market.
The Quantum pilot would also be expected to provide valuable operating data — on sustained well
deliverability, recovery rate, plant performance and product quality — that would directly inform and
de-risk the larger development (Helium Pathway 1). The two potential pathways are therefore
complementary rather than alternative: a near-term Quantum pilot to generate first cash flow and
field data, with the subsequent option to scale-up via Helium Pathway 1 as the Company’s resource
base and the offtake market both mature over time.
Both pathways remain subject to the successful completion of the Ramsay flow testing program,
regulatory approvals, completion of FEED, the definition of a Contingent Resource, the negotiation of
offtake arrangements, and a final investment decision by the Board.
Ramsay Project – Green Methanol Feasibility Study
(Refer ASX release of 29 June 2026 for full details)
During the Quarter, the Company executed a Memorandum of Understanding (MOU) with Mitsubishi
Gas Chemical Company, Inc (MGC) in relation to studying the potential for the development of a green
methanol production facility on the Yorke Peninsula, South Australia, utilising Natural Hydrogen
produced from the Company’s Ramsay Project. The parties have agreed that the MOU represents a
statement of mutual interest and sincere intention to diligently pursue the study phases described
below, but shall not be legally binding.
Strategic Rationale
MGC and Gold Hydrogen have expressed mutual interest in the planned development of a green
methanol production facility utilising Gold Hydrogen’s Natural Hydrogen. MGC, as the owner of green
methanol production technology, intends to collaborate on the studies for the project, subject to its
assessment that the supply conditions of the Company’s Natural Hydrogen are suitable for the
production of competitive green methanol. Establishing and verifying these conditions will be a key
part of the Company’s upcoming flow testing campaign at Ramsay.
Green methanol is recognised as a low-carbon fuel and chemical feedstock with growing demand
across international shipping, aviation and the chemicals sector. The proposed project aligns with both
parties’ stance toward sustainable, low-carbon chemical and fuel production, and represents a
strategic opportunity for the Company to consider potential commercial pathways for its Natural
Hydrogen.
Why the Yorke Peninsula
The Company considers the Yorke Peninsula well placed to host a competitive green methanol project,
with fundamentals supporting each of the principal cost drivers.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 8
Key Inputs Yorke Peninsula Advantage
Natural Hydrogen
feedstock
Gold Hydrogen’s Ramsay Project (PEL 687) hosts a Prospective Resource of
Natural Hydrogen on the Yorke Peninsula. Based on the evidence available
from the Bourakebougou Natural Hydrogen Field in Mali, Natural Hydrogen
has the potential to be produced at a materially lower delivered cost than
electrolytic ‘green’ hydrogen, the largest cost driver of conventional green
methanol production.
Renewable electricity South Australia operates one of the world’s highest-penetration renewable
grids and consistently delivers some of Australia’s most competitive
renewable electricity pricing and supply.
Biogenic carbon The Yorke Peninsula is one of Australia’s most reliable wheat and barley
cropping regions, generating abundant cereal straw residues that are
substantially under-utilised today, a potential low-cost source of
sustainable biogenic carbon for certified green methanol.
Route to market and
infrastructure
Access to existing South Australian deep-water port infrastructure for
potential domestic distribution and export to Asian markets, supported by
established electricity transmission, gas and road/rail networks. South
Australia’s policy framework, complemented by Australian Government
programs including ARENA, is supportive of hydrogen and low-carbon fuels.
Table 1: Summary of Yorke Peninsula advantages for green methanol production
Scope of the Studies
The collaboration is structured as a staged study program: a Pre-Feasibility Study (PFS), then subject
to satisfactory results and a positive decision by both parties; a Definitive Feasibility Study (DFS) and
subsequently FEED. MGC reserves the right to determine the conditions of its participation in the PFS
at its sole discretion.
Pre-Feasibility Study led by Gold Hydrogen
Project location assessment and preliminary capacity limit conditions;
Natural Hydrogen and biogenic carbon supply specifications, quantities, delivery conditions and
supply costs;
Carbon intensity (CI) information for hydrogen, biogenic carbon and other capacity limit inputs;
and
Preliminary economic evaluation and overall plant concept
MGC Contributions During the PFS
Methanol production process (compression, synthesis and distillation), as technology provider;
Natural Hydrogen, carbon source and utility requirements for the methanol production process;
Concept-level CAPEX estimate for the methanol production process; and
Market analysis and target product cost review, as a marketer.
Definitive Feasibility Study (subject to PFS outcomes)
Technical study equivalent to AACE Class 4 with comprehensive economic assessment;
Utility and feedstock supply negotiations; and
Environmental assessment and initiation of permitting.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 9
Timeline and Key Decision Points
The PFS commencement is currently targeted to advance during H2, 2026 in conjunction with the
Ramsay flow test program currently scheduled to commence by late June 2026. The key elements of
the planned work program remain unchanged.
Milestone Target Timing Description
PFS commencement During 2026 Subject to delivery condition assessment
of Natural Hydrogen, carbon and other
utilities, and project location
assessment.
Decision Point 1 End of 2026 (target) Subject to satisfactory PFS conditions
and firm Natural Hydrogen supply
conditions, advance to DFS
DFS completion TBA Comprehensive technical and economic
study leading to Decision Point 2.
Decision Point 2 Following Feasibility Subject to satisfactory DFS conditions
and firm Natural Hydrogen supply
conditions, advance to FEED.
Ramsay Project – Helium Engineering Study
(Refer ASX release of 20 May 2026 for full details)
As previously disclosed, another rapidly emerging area of focus is the potential commercialisation of
Helium gases, as Australia is solely reliant on Helium imports for critical activities in medical, AI /
datacentre and defence fields. The air-corrected purity levels of Helium detected to date at the
Ramsay Project are world class, and on the back of these results, Gold Hydrogen has been working
with Worley in relation to potential commercial production modelling.
During the Quarter, the Company provided commentary on an independent high-level commercial
assessment of three potential Helium production scenarios for its Ramsay Project undertaken by
Worley, based on the inputs provided by the Company.4
The Company has previously disclosed the fact that it has been working with Worley in relation to
potential commercial production modelling scenarios for Helium. The high-level assessment
undertaken by Worley, based on the inputs provided by the Company, to date has provided a high-
level technical definition of the production plant, order-of-magnitude capital cost estimates, and
commercial modelling of NPV, IRR and payback period for both gaseous and liquid Helium product
cases.
Importantly, the scenarios assessed by Worley are indicative modelled cases based on typical process
arrangements, typical recoveries and well stream conditions provided by the Company. However,
they are not based on a defined resource, and in accordance with ASIC and ASX guidance, the
Company cannot currently make any specific disclosures associated with any of the preliminary
project economics.
4
Worley Consulting, ‘Natural Helium Commercial Scenarios Summary Report’, 411010-01261-PM-REP-0001, Rev 0
`
Gold Hydrogen Limited – Quarterly Activities Report p. 10
The modelled scenarios ranging from two (2) wells up to a ten (10) well gaseous project indicate
Ramsay has the potential to be commercially viable if they can sustain a Helium flow rate of 29
thousand standard cubic feet (Mscf) per day each.
This modelling will be specifically refined post completion of the upcoming Ramsay flow testing
program and any subsequent definition of a Contingent Resource for Helium. As part of concept
developments and undertaking a commercial assessment, the Worley modelling demonstrates the
potential for the commercial extraction of Helium at the Ramsay Project using currently available
technology. This assessment therefore assists Gold Hydrogen with the opportunity to book a
Contingent Resource on the back of successful flow testing results from its upcoming campaign.
World-Leading Helium Purity
Gold Hydrogen has previously confirmed Helium samples from the Ramsay Project at air-corrected
purities of up to 36.9%5
. This is significantly above the 0.3% cut off rate that is generally applied to
Helium extraction within Natural Gas Fields. The Company believes its results to be amongst the
highest in the world, based on published information available.
A Tightening Global Helium Market
Helium is a non-substitutable strategic gas underpinning semiconductor manufacturing (including
extreme ultraviolet lithography), AI infrastructure and data centres, MRI and other medical imaging,
aerospace, defence systems, quantum computing and cryogenics.
Australia and New Zealand currently produce no Helium domestically and rely entirely on imports. The
closure of the Darwin LNG Helium plant at the end of 2023 left the region with no sovereign Helium
supply.Ref 3
Domestic demand from AI, data centres, MRI, medical and defence applications was already growing
strongly prior to recent supply disruption. Strikes affecting Qatar’s Ras Laffan complex have now
removed an estimated 30–35% of global traded Helium supply for an expected 12–18 months6
. Qatar
and the United States together supply close to 90% of the global market, and it has been reported that
there is no readily available substitute source at this scale7
.
Significant Interest in GHY Helium
Gold Hydrogen continues to field enquiries from interested parties encompassing Helium offtake,
Helium plant vendors, potential investors, and the Australian Federal Government. Whilst there are a
number of Helium exploration projects in Australia, Gold Hydrogen is the only known project with
multiple wells, proven Helium occurrences and upcoming flow testing occurring in mid-2026.
5
ASX announcement of 17 October 2024 ‘Ramsay Project – Helium Testing Update’ (Helium recorded at the wellhead at
air-corrected purities of up to 36.9%). Refer technical table appended.
6 Chemical & Engineering News (C&EN), ‘Iran war threatens global helium supply’, March 2026; Fortune, ‘Iran war cuts off
helium from Qatar’, 21 March 2026; Reuters / CNBC, March 2026.
7
Arup George, ‘No helium, no chips: why Australia needs to make the gas again’, The Strategist, Australian Strategic Policy
Institute, 1 April 2026.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 11
Next Steps
1. Completion of the Ramsay well testing program (refer above for full explanation).
2. If the Company’s upcoming flow testing campaign is successful, refinement of the Worley
commercial scenarios using actual flow test results, and a defined contingent resource for Helium.
3. Selection of Helium production plant capacity, product type (gaseous vs liquid) and phasing.
4. Commencement of an accelerated pre-FEED / FEED process with Worley to support a final
investment decision.
5. Continued engagement with strategic partners, landowners, the South Australian Government
and Indo-Pacific allies.
Important Notices and Disclaimers
Hypothetical scenarios. The high-level commercial scenarios prepared by Worley and referenced in
this announcement are hypothetical, using high-level technical definition, prepared on the basis of
typical process arrangements, typical recoveries, inputs provided by Gold Hydrogen including well
drilling and completion costs, well stream conditions and forecast Helium market pricing. They do not
constitute a feasibility study, a reserve or resource estimate, or a forecast of project economics. The
scenarios will be refined following completion of the upcoming flow testing program and any
subsequent definition of a contingent resource.
No resource estimate. No SPE-compliant reserves or resources are reported in this announcement.
Hence the Company cannot publish any modelled production rates, well counts, capital costs, NPV,
IRR and payback figures at this time.
Forward-looking statements. This announcement contains forward-looking statements regarding the
Company’s aspirational plans and intentions. Such statements are subject to known and unknown
risks and uncertainties, and actual results may differ materially. Gold Hydrogen does not undertake to
update any forward-looking statements except as required by law.
FINANCIAL REPORTING
Exploration expenditures that were outlaid during the Quarter primarily relate to the Company’s
flagship Ramsay Project (PEL 687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure Amount
Surface sampling, surveys and sub-surface studies $99,964
Environmental and permitting costs $59,413
Native Title, land access and licence fees $80,645
Drilling, well testing and related activities $1,730,936
Total $1,970,958
Periodic adjustments to the above may be made in the Company’s financial statements for the
capitalisation of eligible wages and the offset of R&D taxation refunds.
Production and Development Activities
There were no substantive production and development activities undertaken, nor expenditures
incurred, during the Quarter.
`
Gold Hydrogen Limited – Quarterly Activities Report p. 12
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $253,064 for the Quarter (although some
payments made during the Quarter may relate to prior periods).
This report has been authorised for release by the Board.