RRS Summer Series - Conference Presentation
Released
Released
Announcement PDF
1
Gold Hydrogen Limited
1
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
Neil McDonald – Managing Director
RRS Summer Series – December 2025
2
Gold Hydrogen Limited
Important Notice & Disclaimer
This presentation is not a prospectus, disclosure document or offering document under Australian law or under any other law.
It is for informationalpurposes only. This document does notconstitute, and should not beconstrued as, an offer to issueor
sell or a solicitation of an offer or invitation to subscribe for, buy or sell securities in Gold Hydrogen Limited ABN 74 647 468 899
(Gold Hydrogen).
Any material used in this presentation is only an overview and summary of certain data selected by the management ofGold
Hydrogen. The presentation does not purportto contain alltheinformation that a prospectiveinvestor may require in
evaluating a possibleinvestment in Gold Hydrogen nor does it contain all the information which would berequired in a
disclosuredocument prepared in accordancewith the requirements oftheCorporations Act and should notbe used in isolation
as a basis to invest in Gold Hydrogen. Theinformation contained in this presentation is not investment or financial product
adviceand has been prepared as general information only, withoutconsideration for your particular investment objectives,
financialsituation or particular needs. Recipients of this presentation mustmake their own independent investigations,
consideration, and evaluation ofGold Hydrogen. Gold Hydrogen recommends that potential investors consult their
professional advisor/s as an investmentin Gold Hydrogen is considered to be speculativein nature.
Statements in this presentation aremadeonly as ofthe date ofthis presentation unless otherwisestated and the information
in this presentation remains subject to change without notice. Reliance should not be placed on information or opinions
contained in this presentation.
To the maximum extent permitted by law, Gold Hydrogen disclaims any responsibility to inform any recipient ofthis
presentation on any matter that subsequently comes to its notice which may affect any of theinformation contained in this
document and presentation and undertakes no obligation to provide any additionalor updated information whether as a result
ofnew information, future events or results or otherwise.
To the maximum extent permitted by law, no representation or warranty, express or implied, is made as to the fairness,
accuracy, completeness or correctness ofthe information, opinions or conclusions contained in or derived fromthis
presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in
the futureto any person.
To the maximum extent permitted by law, neither Gold Hydrogen nor, any affiliates, related bodies corporate and their
respectiveofficers, directors, employees, advisors and agents (Relevant Parties), nor any other person, accepts any liability as to
or in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising
out of, contained in or derived from this presentation or any omission from this presentation or ofany other written or oral
information or opinions provided now or in thefuture to any person.
This presentation includes information regarding thepast performance ofGold Hydrogen. Recipients ofthis presentation
should be awarethat pastperformanceshould not berelied upon as being indicativeof futureperformance.
This presentation contains statistics, data and other information pertaining to Gold Hydrogen’s business and operations.
Recipients of this presentation should notethatindustry and market data and statistics are
inherently predictive and subjectto uncertainty and not necessarily reflective of actual industry or market conditions. There is
no assurance that any of the estimates or projections in this presentation will be achieved. Gold Hydrogen has not
independently verified, and cannot giveany assurances to the accuracy or completeness of, this market and industry data or
the underlying assumptions used in generating this market and industry data.
This presentation contains “forward looking statements” concerning the financialcondition, results ofoperations and business
ofGold Hydrogen. All statements other than statements offact or aspirational statements, are or may be deemed to be
“forward looking statements”. Often, but notalways, forward looking statements can generally be identified by the useof
forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, “outlook”, and
“guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of
management, future or anticipated production or construction commencement dates and expected costs, resources or
reserves, exploration results or production outputs. Forward looking statements are statements offuture expectations that are
based on management’s currentexpectations and assumptions and known and unknown risks and uncertainties that could
causethe actual results, performance, or events to differ materially fromthose expressed or implied in these statements. These
risks include, but arenotlimited to price fluctuations, actualdemand, currency fluctuations, drilling and production results,
commercialization, reserve estimates, loss of market, industry competition, environmentalrisks, physical risks, legislative, fiscal,
and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project
delay or advancement, approvals, and costestimates. More detail on therisks relevant to Gold Hydrogen’s business and
operations is set out in Risks section ofthis presentation.
Prospective Resource Statements
The Prospective Resource Statements for Natural Hydrogen and for Helium havebeen included in presentation under the
approval of Mr Billy Hadi Subrata, ChiefEngineer for Gold Hydrogen, who is a Qualified PetroleumReserves and Resources
Evaluator. Mr HadiSubrata confirms that, as at the date of this announcement, there areno changes to information or
additionalinformation, since the effective dates, that would materially change the estimates of prospective resources quoted.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this presentation is based on, and fairly represents, information
and supporting documentation prepared by independentconsultants “Teof Rodrigues & Associates” with an effective date of
30 September 2021, and which forms part of the Company’s Replacement Prospectus dated 29 November 2022. The
Prospective Resource Statement, together with all relevantnotes, also appears in the Company’s ASX release of 13 January
2023.
QPRRE Statement - Helium
The Prospective Resource Statement for Helium in this announcement is based on, and fairly represents, information and
supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of 21
February 2024 and 30 October 2024, and which was announced by the Company on thosedates together with the
accompanying assumptions and notes.
goldhydrogen.com.au | ASX:GHY |
3
Gold Hydrogen Limited
Gold Hydrogen – Corporate Snapshot
Alexander Downer – Non-Executive Chair
Katherine Barnet – Non-Executive Director
Neil McDonald – Managing Director
Roger Cressey – Executive Director
Board of Directors
1 granted Petroleum Licence – PEL 687 Ramsay Project
8 Petroleum Licence Application Areas
1 granted Mineral Exploration Licence
4 Storage Licence Applications – PEL 687 Ramsay Project
Tenure
Market Cap – $100 million
Cash on Hand – $22.5 million
Shares on Issue – 180.5 million
goldhydrogen.com.au | ASX:GHY |
4
Gold Hydrogen Limited
Executive Summary – Natural Hydrogen and Helium
Ramsay Project 100% owned
7,820 km2
plus a further 69,472km2 under exclusive
application
Title over certified Prospective
Resources
1.3 billion kg of natural Hydrogen1
41 Bcf of Helium1
(with a mean of 96 Bcf)
High purity gas sample levels2
Up to 95.8% Hydrogen (Ramsay 2)
Up to 36.9% Helium (Ramsay 2)
Up to 97% Hydrogen (Ramsay 3)
Helium-3 detected at elevated levels
1. Prospective Resources are based on un-risked Best Estimate. Refer Appendix for full details.
2. Laboratory gas sample analyses - air (and nitrogen) corrected. Refer ASX releases of 27 May 2024, 2 August 2024, 17 & 30 October 2024, and 2 December 2025. Technical Tables appended.
Engagements to date with leading
global experts and contractors
CSIRO, Schlumberger, Total Seismic,
Xcalibur, Savanna Energy Services, Terrex
Seismic, SGS
Commercial and environmental
competitive advantages
Natural hydrogen provides cost and
emission advantages over other
production sources
A number of global gas projects are
commercial with much lower
concentration
of helium
(<1% helium as a by-product)
goldhydrogen.com.au | ASX:GHY |
5
Gold Hydrogen Limited
Overview
Following extensive due diligence, site visits and negotiations,
Toyota Motor Corporation, Mitsubishi Gas Chemical Inc and
ENEOS Xplora Inc invested $14.5m into Gold Hydrogen in July
2025 towards the upcoming 2025 drilling program of 2 to 3 wells
in more optimal locations. The program has been planned with
enhanced well design engineering to facilitate a more realistic
appraisal of the commercial potential of the Ramsay field.
In mid 2024, an extensive 2D seismic program was
undertaken, confirming multiple further drill targets in more
optimal locations than the 1931 and 2023 drill holes.
Based on the knowledge and results achieved to date,
and working with its strategic Japanese investors, Gold
Hydrogen is analysing potential commercial
opportunities for both Natural Hydrogen and Helium.
Gold Hydrogen drilled 2 exploration wells in 2023 and tested
them in 2024 to confirm the historic 1931 Ramsay Oil Bore
drill location and the historic high-purity occurrence of
Natural Hydrogen.
These two exploration wells (Ramsay 1 & 2) confirmed
world-leading purities of both Natural Hydrogen and
Helium, via narrow-gauge exploration wells, which were
not designed to be appraisal or production wells.
The permitted testing period allowed for Ramsay 1 & 2
enabled the Company to confirm that Natural Hydrogen
and Helium could be brought to surface.
goldhydrogen.com.au | ASX:GHY |
6
Gold Hydrogen Limited
Industry Overview
7
Gold Hydrogen Limited
Naturally occurring Hydrogen offers significant cost and / or carbon advantages relative to other Hydrogen production
(manufacturing) processes
Gold Hydrogen is exploring for ‘gold’ or
‘white’ (natural) Hydrogen
Types of Hydrogen Production
Gold / White
(natural)
Grey Black/Brown Blue Green
Energy source Natural hydrogen Natural gas Coal
Natural gas /
coal
Renewables /
biomass
Environmental impact Low High Very High Low Low
No thermal process
Production cost (A$/kg)1,2
$1.00 $5.60 $6.20-$6.40 $10.20-$10.30
P: $6.40-$25.50
A: $4.70-$23.20
Cost comparable to existing
power generation3
Today, ~95% of all hydrogen produced is
from natural gas
Source: Frost and Sullivan, Sep-2022 (Refer Gold Hydrogen Replacement Prospectus dated 29 November 2022)
1. Source: Christophe Rigollet1, Alain Prinzhofer2,3, Natural Hydrogen:A New Source of Carbon-Free and Renewable Energy That Can Compete With Hydrocarbons, First Break, Volume 40, Issue 10, Oct 2022, p. 78 – 84
DOI: https://doi.org/10.3997/1365-2397.fb2022087; “The Bourakébougou field, in Mali, represents the first natural hydrogen deposit studied both scientifically and industrially.
It gives us information on its renewability, on the natural flows involved and therefore on its sustainable exploitation. It is possible to estimate that the cost of operating hydrogen would be less than $1/kg, which is significantly cheaper than
any manufactured hydrogen, whethergreen, grey, orblue. Equivalent work is in progress in other continents, in order to be able to compare ourknowledge of this Malian field with other fields in the world, which will make it possible to
better ensure the industrial and societal interest of R&D for this new field.”
2. P = Polymer electrolyte membrane electrolysis. A = Alkaline Electrolysis. Gold Hydrogen cost is an estimate
3. For industrial buyers, a hydrogen offtake price of €3 ($4.50) per kg would be required to incentivise hydrogen production over power generation
goldhydrogen.com.au | ASX:GHY |
8
Gold Hydrogen Limited
Global Hydrogen Forecast
Substantial investment laying the foundation for Hydrogen use
Source: Frost & Sullivan Report - Page 29 of Gold Hydrogen Prospectus. Source: International Energy Agency, Oct-2021 (Other includes buildings, agriculture and refineries).
goldhydrogen.com.au | ASX:GHY |
9
Gold Hydrogen Limited
1. Source: USGS, 2023: https://pubs.usgs.gov/periodicals/mcs2024/mcs2024-helium.pdf
2. Air-corrected laboratory analyses for Helium purities. Refer ASX releases of 2 August 2024 and 17 October 2024. Technical Tables appended.
Key Drivers for Helium
The global wholesale helium market is
expected to grow from an estimated
US$5bn in 2023 to over US$8bn in
20301
There are commercial global gas projects with significant
lower helium concentrations (>1%)
Indicatively pricing is currently approximately USD400-
500 per Mcf (thousand cubic feet)
(Source: Kornbluth Helium Consulting)
goldhydrogen.com.au | ASX:GHY |
10
Gold Hydrogen Limited
Helium 3 - Overview
• Helium-3 detected by independent international laboratory testing of Ramsay Project helium samples.
• The isotopic analysis results from samples tested suggest up to 3.47ppb Helium-3 within a 36.9% Helium sample.
• Helium-3 is extremely rare and valuable, with current prices of approx USD18.7 million per kg.
• Nuclear fusion and quantum computing are emerging future markets for Helium-3.
• A single 1 GW fusion plant could require up to 100 kg of Helium-3 annually, representing a potential market worth $1.4
billion per 1 GW fusion plant.
• Extracting and separating Helium-3 from Helium-4 as part of a natural gas project could be a viable alternative to Lunar-
based mining for Helium-3.
• Refer ASX release of 30 October 2024 for full details and further reading about Helium-3.
goldhydrogen.com.au | ASX:GHY |
11
Gold Hydrogen Limited
Technical Results and Findings
12
Gold Hydrogen Limited
Extracted from fluid
inclusions in rock chips from
historical wells
Extracted from fluid
inclusions rock chips from
historical wells
Hydrogen from historical
wells
Extensive regional play across 7,400 km2
permit area
Hydrogen and Helium to date in PEL687
Note: Ramsay 1 & 2 drilling and well test sample
results are air and nitrogen corrected. Results are
in a range up to these values. Refer ASX releases
of 31 October 2023 to 19 December 2023, 2
August 2024 and 17 October 2024.
13
Gold Hydrogen Limited
Key Technical Results and Findings to Date
• 2024 drilling and well testing confirmed the presence of
a Natural Hydrogen and Helium system adjacent to the
historic (1931 Ramsay Oil Bore) site at Ramsay.
• World-class purities of Natural Hydrogen and Helium
measured during GHY drilling and testing:
o Up to 95.8% Natural Hydrogen (Ramsay 2)1
o Up to 36.9% Helium (Ramsay 2)1
o Up to 97% Natural Hydrogen (Ramsay 3)1
• During exploration well testing in 2024, both Natural
Hydrogen and Helium concentrations increased over
time as formation water was pumped from the wells
(see slides 15 and 16).
• Helium-3 identified at Ramsay via noble gas analysis
conducted at Oxford University1.
• Aeromag (aerial gravity and magnetics) and 2D
seismic surveys have helped to delineate basement
architecture and structural lineaments across the
Yorke Peninsula which have formed the basis for
identifying new drilling and testing locations.
• Fluid inclusion studies (conducted by CSIRO) identified
the existence of Natural Hydrogen and Helium in
numerous places across the Yorke Peninsula.
• Prospective resource estimates established by third-
party consultants for both Natural Hydrogen and
Helium within PEL 687 (Yorke Peninsula).
1. Laboratory gas sample analyses - air (and nitrogen) corrected.
Refer ASX releases of 27 May 2024, 2 August 2024, 17 & 30 October 2024, and 2 December 2025. Technical Tables appended.
goldhydrogen.com.au | ASX:GHY |
14
Gold Hydrogen Limited
Ramsay 1 & 2 – Drilling Objectives
Target Zones & Resources
(Hydrogen / Helium)
• 4 main target zones identified
from drilling and testing
Ramsay 1 and 2.
• Hydrogen shows in basement
(D) and shallow zones (A and
B).
• Helium in dolomite zone (C)
and basement (D).
goldhydrogen.com.au | ASX:GHY |
Mudgas measurements
MDT
A
B
C
D
Minlaton
Fm
Parara
Limestones
Kulpara
Limestones
Kulpara
Dolomites
Winulta Fm
Basement
Ramsay Lst
Basement
(weathered)
15
Gold Hydrogen Limited
Stage 2 Well Testing
Ramsay 2 Hydrogen Concentrations Over Time
Stage 2 well testing of Ramsay 2 exploration well at depths 200m to 350m1
• Narrow exploration well.
• Testing process and timeframe limited by Govt
approvals.
• H2 concentrations increased over time as the
well was dewatered, with gas to surface.
• Successful testing and data collection from
exploration well achieved.
• 2025 / 26 program designed to optimise testing
timeframes and potential outcomes (larger well
bores and pump sizes to optimise gas
recovery).
1. Graph extrapolated from ASX release of 2 August 2024. Technical Table appended.
Note: gas samples from the annulus at the wellhead. Concentrations are corrected for air and nitrogen.
goldhydrogen.com.au | ASX:GHY |
16
Gold Hydrogen Limited
Stage 2 Well Testing
Ramsay 1 Helium Concentrations Over Time
Stage 2 well testing of the Ramsay 1 exploration well
• Narrow exploration well.
• Testing process and timeframe limited by Govt
approvals.
• Helium concentrations increased over time as
the well was dewatered, with gas to surface.
• World-leading purity of Helium (36.9%1)
established, providing encouragement that the
Ramsay field could potentially support a
commercial development for Helium.
• 2025 / 26 program designed to optimise testing
timeframes and potential outcomes (larger well
bores and pump sizes to optimise gas
recovery). 1.Laboratory gas sample analyses - air (and nitrogen) corrected. Refer ASX releases of 17 October 2024.
Technical Tables appended.
2. Graph reference: ASX release release of 17 October 2024. Technical Table appended.
Results measured at the gas separator; air and nitrogen corrected.
goldhydrogen.com.au | ASX:GHY |
17
Gold Hydrogen Limited
Ramsay 2D Seismic Survey & Next Well Locations
goldhydrogen.com.au | ASX:GHY |
18
Gold Hydrogen Limited
Next Objectives
19
Gold Hydrogen Limited
Next Objectives
Mature the Ramsay Project with further appraisal in
preparation for commercial development decisions:
o Prove the existence of Natural Hydrogen and Helium
resources away from the Ramsay-1 and Ramsay-2 well
sites; and
o Successfully extract compositions of Natural Hydrogen
and Helium to surface across the Ramsay Project area.
Optimise well testing parameters to maximise reservoir
deliverability and provide guidance for potential future
commercial developments.
Progress commercial use cases of Natural Hydrogen and
Helium, including feasibility studies and conceptual
designs for potential pilot projects.
Maximise data and operational learning opportunities for
deployment in future exploration and drilling campaigns.
Develop blueprint for exploration and appraisal across
our wider portfolio.
Partner with appropriate technology and / or industry
specialists to develop specific downstream project
opportunities.
goldhydrogen.com.au | ASX:GHY |
20
Gold Hydrogen Limited
Analysis is Being Completed for the
Following Hydrogen Use Cases
01
03
01 - Hydrogen to Energy (e.g. Jenbacher) 02 - Hydrogen to Green Bio Methanol
03 - Hydrogen to Natural Gas Pipeline
goldhydrogen.com.au | ASX:GHY |
21
Gold Hydrogen Limited
Recap/Summary
Gold Hydrogen selected Toyota Motor Corporation,
Mitsubishi Gas Chemical Inc and ENEOS Xplora Inc to
become strategic investors in the Company. These parties
invested to help fund the next drilling and well testing
campaign, which is designed to facilitate gas optimization
to surface. A number of potential downstream technical
and commercial opportunities are also being discussed.
The data and results collected by Gold Hydrogen from
the Ramsay 1 & 2 wells confirmed that Natural
Hydrogen existed at the Ramsay Project at high-purity
levels of up to 95.8%1 together with world-leading
purities of Helium of up to 36.9%1, with Helium-3
detected at elevated levels.
Despite Ramsay 1 & 2 only being narrow exploration
wells, drilled adjacent to the historical 1931 Ramsay Oil
Bore, the testing results - including recovering gas to
surface - led to enormous international interest.
The Company’s 2025 / 26 program is designed to
move the Ramsay Project towards commercial
development opportunities, including potential pilot
projects for Natural Hydrogen (fuel cells to energy
and also green methanol), plus a potential pilot
project for Helium.
goldhydrogen.com.au | ASX:GHY |
1
Results are air (and nitrogen) corrected.
22
Gold Hydrogen Limited
Key Team Members
23
Gold Hydrogen Limited
Key Management
Neil McDonald
Founder & Managing Director
Neil McDonald, with over 20 years of
experience in the energy and
minerals sectors across Australia, has
worked on major exploration
projects from greenfield to early
development. He is a graduate of the
Australian Institute of Company
Directors.
Frank Glass
Chief Exploration Adviser
Frank Glass is a respected geologist
with over 30 years of experience in
oil, gas, and natural hydrogen
exploration, including a decade with
Shell. He holds a Master's in
Structural Geology from the
University of Amsterdam and
memberships in the Petroleum
Exploration Society of Australia and
the European Association of
Geoscientists and Engineers.
Peter has extensive experience in
exploration within the oil & gas industry
across Australia, specifically regarding
natural gas and CSG, these being gases
which correlate well with the Company’s
Hydrogen and Helium gases. He has
specific experience in the identification of
gas-related leads and plays, the
establishment and running of exploration
programs, seismic interpretation, dataset
analysis, governmental liaison and
reporting, and all aspects of geological
project assessment and fieldwork.
Peter Bubendorfer
Chief Geologist
Julien Bourdet is a geological advisor to
Gold Hydrogen. He worked for 16 years
at CSIRO conducting research aiming at
evaluating geological fluid and
diagenesis and delivered petrological
and fluid inclusion consulting. He has
extensive contributions in the field of
oil and gas exploration and
development and on the natural
hydrogen systems. He earned his PhD
at the University of Lorraine in France.
Julien Bourdet
Geological Advisor
Hugo is an exploration geologist who
has previously worked for 2H
Resources and French Company 45-8
Energy, where he was involved with
various geological work program
designs and field execution. He holds
Masters Degrees in Petroleum Geology
(France) and Geoscience Exploration
(Norway).
Hugo Beldame
Exploration Geologist
goldhydrogen.com.au | ASX:GHY |
24
Gold Hydrogen Limited
Key Management
Billy Hadi Subrata
Chief Technical Officer
Leon Hennessey
GM - Operations
Simon Talbot
Chief Commercial Officer
Billy Hadi Subrata is an experienced
petroleum and reservoir engineer with
20 years expertise in exploration,
development, and energy transition.
He has significant skills in reservoir
simulation, field appraisal, reserves
estimation, and project management,
and has been a key figure at Gold
Hydrogen since its inception in 2021.
Billy is a Qualified Petroleum Reserves
and Resources Evaluator and a
member of SPE and Engineers
Australia.
Leon has broad industry experience
working in most major energy markets,
including practical hands-on
experience throughout the well
construction life cycle encompassing
project management, engineering, and
optimization. As an upstream
consultant focussed on Projects,
Drilling and Wells he delivered projects
successfully in multiple markets
focussed predominantly on
unconventional energy particularly
with CBM, CSG and Shale plays.
Simon joined the Company after
finalising the successful sale of the $1.9B
Green Methanol / Green Hydrogen
project at Bell Bay Tasmania. He is a
passionate advocate for utilising
Australia’s sustainable competitive
advantages and the enormous potential
for natural hydrogen and biomass to be
combined to make low carbon liquid
fuels. Simon is well known to Japanese
and North American investment groups,
and has worked for over 25 years across
renewables as an Agribusiness Executive.
goldhydrogen.com.au | ASX:GHY |
25
Gold Hydrogen Limited
Board of Directors
Neil McDonald
Founder & Managing Director
Alexander Downer
Independent
Non-Executive Chair
Katherine Barnet
Independent
Non-Executive Director
Roger Cressey
Executive Director
Commercial Operations
Neil McDonald, with over 20
years of experience in the energy
and minerals sectors across
Australia, has worked on major
exploration projects from
greenfield to early development.
He is a graduate of the Australian
Institute of Company Directors.
Alexander Downer, a prominent
Australian politician and diplomat,
has held top roles including Leader of
the Liberal Party and Minister for
Foreign Affairs. Before politics, he
was an executive director at the
Australian Chamber of Commerce. He
currently serves on boards like
Hakluyt & Company and Yellow Cake
Plc, and writes for the AFR, holding
the Companion of the Order of
Australia title.
Katherine Barnet, a Chartered
Accountant with 25+ years of
experience, is a partner at Olvera
Advisors in Sydney. She specializes
in financial transactions, sustainable
growth, and value optimization,
with recent work in renewable
energy, retail, property, and
construction. She is a Fellow of
CAANZ and ARITA and a member of
the Australian Institute of Company
Directors.
Roger Cressey has over 35 years of
experience in the resource
industry, mainly in gas exploration
and production. He has held CEO,
COO, and other executive roles in
Australia (Queensland and NT),
PNG, Indonesia, and Uganda. Roger
excels in managing multi-
disciplinary teams, strategy
development, and stakeholder
engagement.
Karl Schobohm
Company Secretary & CFO
Karl Schlobohm, a Chartered
Accountant and Fellow of the
Governance Institute of Australia, has
over 30 years of experience across
various industries. He is a Non-
Executive Director of the Australian
Shareholders Association and has
held multiple executive roles with
listed companies on the ASX, LSE,
AIM, and TSX in the natural resources
sector.
goldhydrogen.com.au | ASX:GHY |
26
Gold Hydrogen Limited
Appendix – Further Information
27
Gold Hydrogen Limited
Gold Hydrogen Prospective Resources (Using PRMS guidelines)
Unrisked Prospective Hydrogen
Resources, PEL 687
SPE-PRMS Sub-Class Category Low Estimate
(kTonnes)
Best Estimate
(kTonnes)
High Estimate
(kTonnes)
Prospect 165 1135 8050
Lead 42 178 770
Total 207 1313 8820
Certified Prospective Hydrogen Resources, existing discoveries and
drill ready hydrogen prospects (calculated volume not determined)
NOTE - All estimates are unrisked and aggregated arithmetically by category, hence caution that the aggregate low estimate maybe a conservative estimate and the aggregate high estimate
maybe very optimistic estimate due to the portfolio effects of arithmetic summation. The estimated quantities of hydrogen and / or helium that may potentially be recovered by the application
of future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery (Pg), risk of development (Pd) and risk of commercialization
(Pc). Further exploration, appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrogen and / or helium.
Unrisked Prospective Helium
Resources, PEL 687
SPE-PRMS Sub-Class Category Low Estimate
(Bscf)
Best Estimate
(Bscf)
High Estimate
(Bscf)
Prospect Ramsay Fault Block 2 8 38
Prospect South of Ramsay
Fault Block
5 33 205
Total 7 41 243
Certified Prospective Helium Resources, Ramsay Field
(PEL 687 Yorke Peninsula)
See ASX releases of 13 January 2023 (Hydrogen) and 21 February 2024 and 30 October 2024 (Helium) for full details and notes
goldhydrogen.com.au | ASX:GHY |
28
Gold Hydrogen Limited
Ramsay Project Milestones
goldhydrogen.com.au | ASX:GHY |
29
Gold Hydrogen Limited
Traditional Green Methanol Opportunity
Conceptual Design
Not required with Natural Hydrogen
goldhydrogen.com.au | ASX:GHY |
30
Gold Hydrogen Limited
Traditional Green Methanol Opportunity
Conceptual Design
goldhydrogen.com.au | ASX:GHY |
31
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
goldhydrogen.com.au | ASX:GHY |
32
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
goldhydrogen.com.au | ASX:GHY |
33
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
goldhydrogen.com.au | ASX:GHY |
34
Gold Hydrogen Limited
Neil McDonald
Managing Director
nmcdonald@goldhydrogen.com.au
+ 61 0 419 721 007
Roger Cressey
Executive Director
rcressey@goldhydrogen.com.au
+ 61 0 419 663 569
Karl Schlobohm
CFO / Company Secretary
kschlobohm@goldhydrogen.com.au
+ 61 0 419 721 007
Gold Hydrogen Limited | GPO Box 801 Brisbane, Qld, 400, Australia | goldhydrogen.com.au
Share your feedback
Discover