World-class Sample Results and Analysis Highlight
Step-out Exploration Opportunities as the
Ramsay Flow Testing Campaign Nears Mobilisation
Highlights:
Mobilisation of the Ramsay flow test program is imminent, with procurement and
regulatory approvals well advanced. Equipment mobilisation is currently scheduled for
late May, with flow testing operations currently scheduled to commence by late June.
The flow test campaign will undertake separate zonal testing of discrete Natural
Hydrogen and Helium-bearing formations, representing the first comprehensive
production-style evaluation across the Ramsay wells.
Independent petrophysical re-interpretation of wireline data from Ramsay 3 and Ramsay
4 has materially upgraded the test program, identifying additional porous zones for flow
testing and increasing gross reservoir thickness in Ramsay-3 by more than 200%.
Flow testing follows exceptional subsurface indicators, including soil gas (geochemical)
results of up to 2,160 ppm Natural Hydrogen (c. 4,000x atmospheric background) across
the Ramsay Project area. Based on the published information available, the Company
considers its results to be among the highest reported in Australia using this method.
Phase I fluid inclusion studies across the Company’s high-graded exclusive application
areas support the presence of regionally extensive Natural Hydrogen and Helium
generation systems across Gold Hydrogen’s 77,292 km² tenement portfolio,
underpinning the strategic importance of the Ramsay tests.
Helium market conditions are highly supportive, with pricing strengthening sharply on
the back of sustained demand (AI, medical, defence and advanced manufacturing) and
major supply disruptions, with an estimated 35% of global supply currently offline due to
Middle East instability. Gold Hydrogen has a 96 Bcf Mean Prospective Resource of Helium
(refer Table 5 for full details) and successful flow testing will see the Company well placed
to potentially capitalize on this opportunity.
In parallel with the flow test program, the Company is working with Worley to assess early
development pathways, including the potential to fast-track a Helium development at
Ramsay to supply the Australian domestic market and enhance Australia’s sovereign
Helium capability.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 2
Gold Hydrogen Managing Director, Neil McDonald said: “We continue to deliver outstanding
results from our world leading Ramsay Natural Hydrogen and Helium Project on the Yorke
Peninsula. Recently completed geochemical sampling and fluid inclusion studies continue to
build on our strategy to develop a blueprint to ultimately deliver export-scale Natural Hydrogen
and Helium projects across our large portfolio. Furthermore, petrophysical interpretation of
wireline data from our recently drilled Ramsay 3 and Ramsay 4 wells has uncovered significant
upside in gross reservoir thickness by more than 200% – this revelation unlocks additional gross
reservoir for testing in our upcoming flow test program. We look forward to providing updates
on our flow test program as we near mobilisation of key equipment to site in the coming weeks
at a time where maturing domestic Hydrogen and Helium projects could not be more
important.”
The Directors of Gold Hydrogen Limited (Gold Hydrogen, ASX: GHY, the Company) are pleased to
provide an update on the Ramsay Project and other operational activities.
Geochemical Sampling Pilot Study at Ramsay
A total of 39 soil gas samples were collected and analysed in March across the Ramsay area and along
road reserves using a mobile sampling unit operated by CSI Australia Pty Ltd (see Figure 1 for map and
summary of results obtained). Each sample was obtained from a hand augured hole to a depth of up
to 1.2 m (or refusal) at 0.5 to 1 km intervals along road reserves, with a nylon tube inserted to collect
a grab sample of soil gas from the base of the hole, following which the hole was backfilled. The grab
sample was analyzed on the spot using a portable Gas Chromatograph (GC) providing real-time results,
with Natural Hydrogen and Helium both analyzed to a 10 ppm detection limit. The technique used is
designed to minimize the possibility of Hydrogen generation by mechanical means. It also can separate
noble gases from Hydrogen in the column, which is not possible with confidence using handheld field
meters.
Results from the pilot study are extremely encouraging, with a maximum value of 2,160 ppm Natural
Hydrogen (almost 4,000 times background) obtained, and 635 ppm Natural Hydrogen in an adjoining
sample (collected 1km to the south). Based on the published information available, the Company
considers its results to be among the highest reported in Australia using this method. Furthermore,
these abnormally high levels were not near any previously known Natural Hydrogen occurrence, and
demonstrate the potential for an extension of the Ramsay project area to the south of the existing
wells. Of the 39 samples collected, four samples exceeded 500 ppm Natural Hydrogen, including 1,100
ppm Natural Hydrogen at the Ramsay 1 well location. The fact that the technique detected the Ramsay
1 occurrence is considered significant as it provides confidence in the sampling methodology over a
confirmed Natural Hydrogen occurrence at depth. The Company will look at additional areas for follow-
up sampling as a method to mature and de-risk additional drilling targets across PEL 687.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 3
Figure 1: Location and results of 39 soil gas samples collected by CSI
Regional Fluid Inclusion Study
A total of 51 rock samples were collected from drill core and cuttings from historic wells located on the
Company’s Petroleum License Application Areas (PELA’s) including the northern Yorke Peninsula (PELA
688 and 792) and the Fleurieu Peninsula (PELA 688) (see Figure 2). The study targeted a wide range of
geological materials, including sedimentary rocks (sandstones and carbonates spanning the
Neoproterozoic to Tertiary), metamorphic rocks (metasediments, schists, and metasomatised units),
and basement lithologies such as granites, gneiss, amphibolites, and mafic intrusives. Particular
emphasis was placed on samples containing mineral features likely to host fluid inclusions, such as
veins, cemented fractures, and well-crystallised phases. Gas extraction and quantification processes
were carried out using the Fluid Inclusion Stratigraphy (FIS) technology by SLB, which releases gases
trapped in microscopic fluid inclusions through controlled crushing. The liberated gases are then
analysed to determine their composition, including the presence of Natural Hydrogen and / or Helium.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 4
Preliminary results from 51 analysed samples indicate a widespread occurrence of both Natural
Hydrogen and Helium across the studied regions, including within PELA 792. Natural Hydrogen
concentrations exceeded background thresholds in 23 samples, while Helium exceeded threshold
levels in 29 samples. Of these elevated samples, 13 samples showed Helium more than 10 times higher
than background thresholds (see Table 1).
These detections span multiple lithologies and geological settings, suggesting that both gases are not
restricted to a single rock type or stratigraphic interval. The relatively frequent co-occurrence of
Natural Hydrogen and Helium indicates the potential for combined resource systems, with Helium
representing an additional high-value product. Overall, the results strongly support the Company’s
view that Natural Hydrogen occurrences and potential reservoirs could be widespread, and highlight
the potential of the Company’s exploration portfolio away from the world class Ramsay Project.
Additionally, Helium enrichment further enhances the exploration significance and opportunity for
new dual gas targets to be matured for future drilling. These findings justify continued, more detailed
investigation to better constrain gas origins, distribution, and economic potential within the PELA’s
exclusively held by the Company.
Figure 2: Location of selected boreholes and samples taken for Fluid Inclusion Stratigraphy analysis
It is important to note that field-based activities in these PELA areas cannot commence until the permit
areas are progressed to granted status. However, this ongoing process of preliminary desktop work is
extremely useful in identifying priority areas and potential target zones for future on-ground activities.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 5
Number of samples at or
below background
thresholds
Number of samples up to
10x above background
thresholds
Number of samples
greater than 10x above
background thresholds
Helium 28 16 13
Natural Hydrogen 28 23 0
Table 1: Fluid Inclusion Stratigraphy study results compared to background thresholds
Petrophysical Interpretation of Ramsay 3 and Ramsay 4 Wireline
The Company engaged ImageStrat Pty Ltd to conduct specialist processing of the STAR-UXPL borehole
image data which has improved both the resistivity and acoustic images acquired during wireline
logging of both Ramsay 3 and Ramsay 4, providing higher confidence in interpretation of the data.
Preliminary interpretation on the processed logs has uncovered additional fracture zones open to the
borehole wall and multiple additional porous intervals across both the Natural Hydrogen and Helium
bearing reservoirs. As a result, the gross reservoir thickness across the combined Parara, Kulpara and
Winulta formations in Ramsay 3 has increased by more than 200% and provided additional zones for
the near-term flow testing campaign (see Figure 3 and updated technical Table 2 and Table 3
appended).
Additional independent petrophysical QC, processing and interpretation continues across the full suite
of wireline logs acquired in Ramsay 3 and Ramsay 4. Interim results also confirm thicker gross reservoir
intervals than previously identified, and demonstrate that Ramsay 3 in particular appears to have
intersected enhanced porosity and permeability over the Kulpara Dolomite Formation which provides
further confidence of the presence of reservoir properties that could flow commercial quantities of
Helium.
Third party laboratory analysis of samples collected during the drilling of Ramsay 3 and Ramsay 4 is
ongoing and results will be integrated into petrophysical interpretations ahead of the upcoming
Ramsay flow test campaign.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 6
Figure 3: Ramsay 3 Kulpara Dolomite STAR-UXPL image log interpretation demonstrating excellent
reservoir quality
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 7
Ramsay Flow Testing Operational Update
Results from the Company’s drilling operations to date have demonstrated that Natural Hydrogen and
Helium are present in separate formations, with Natural Hydrogen in the shallower Parara Formation
and Helium in the deeper Kulpara Formation. As a result, zonal testing of these distinct separate
Natural Hydrogen and Helium zones will be conducted as part of a strategy to demonstrate commercial
flow potential for both gas streams.
Of note, the current Helium supply disruptions occurring in the Middle East along with unprecedented
demand growth in advanced manufacturing sectors such as semiconductors and Artificial Intelligence
(AI) data centers provide an opportunity for the Company to consider a fast-tracked Helium
development strategy at Ramsay, which can provide early infrastructure and cashflow for
reinvestment into a larger scale, mid-term Natural Hydrogen project on the Yorke Peninsula. As
previously disclosed, the Company has engaged Worley to provide conceptual development screening
in relation to this opportunity. The upcoming flow test program will allow the Company to assess the
commercial flow rate potential separately of both the Natural Hydrogen and Helium bearing reservoirs
at Ramsay.
Operations, Approvals and Planning
Engineering work is progressing on the integrated fluid management system for the upcoming flow
test program, while ongoing well engineering is being aligned with subsurface modelling inputs to
maximise reservoir deliverability. Fluid management during well testing will involve reinjection of
produced fluid (water) into the Ramsay 1 well. A temporary above ground pipeline will transfer fluid
from the well on test to the Ramsay 1 well for reinjection, and the installation of this and all other well
testing equipment can only commence following receipt of approvals.
The Company is working closely with the South Australian government and regulatory approvals for
the flow test program are progressing, with the mobilisation of test equipment planned to commence
immediately upon receiving approvals. Further updates will be provided once approvals are secured
and equipment mobilisation has commenced, with an estimated commencement of preliminary
testing activities expected by late June 2026.
Recent Field Activities
During Q1 2026, field activities included road verge geochemical sampling (discussed above), wellhead
monitoring, and a fluid injectivity test at Ramsay 1. Of note, the Ramsay 1 injectivity test was carried
out to provide an understanding of the well’s capacity to accept the planned injection of fluid from the
2026 well testing operations. The injectivity test was a short-term operation with results exceeding
the planed injection rate of up to 20,000 bbl/day for the upcoming flow tests.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 8
Corporate Update
Appointment of Executive Vice President - Operations
The Company is pleased to announce the appointment of Marshall Hood as Gold Hydrogen’s Executive
Vice President - Operations.
Marshall has more than 22 years of technical, operational and commercial experience in the upstream
energy sector. His previous roles have included various managerial and technical roles including for
Bangchak Corporation, Nido Petroleum and Ophir Energy. He has a successful exploration track record
with more than 500mmboe of discovered resources across multiple operated assets.
Marshall is a former Director of the Natural Hydrogen Association of Australia and has a BSc in
Exploration Geophysics (1st
Class Hons) from Curtin University of Technology, Western Australia.
The Company would like to advise that Frank Glass recently left Gold Hydrogen following the expiration
of his contracted term as its Geological Advisor. The Company’s Board and management would like to
sincerely thank him for his efforts during his tenure.
In addition, the Company is pleased to announce that Billy Hadi Subrata, Chief Technical Officer (CTO)
for Gold Hydrogen, has received his Fellow status from Engineers Australia (FIEAust), becoming the
first Fellow recipient in the Natural Hydrogen and Helium industry, considered to be a prestigious
honor and due recognition in the engineering and technical space in Australia.
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate to
the presence, recovery and potential volumes of both Natural Hydrogen and Helium, but also due to
the location of the gas systems within agricultural areas and the proximity to National Parks on both
Yorke Peninsula and Kangaroo Island, requiring significant landholder and community engagement.
The worldwide, Federal and South Australian Government and industry efforts to secure Hydrogen as
an alternative energy source provides confidence that any technical and social concerns may be
overcome.
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class Natural Hydrogen and
Helium gases in a potentially extensive province in South Australia. This region had its Natural
Hydrogen and Helium potential confirmed by the Company via its maiden 2023 / 24 drilling and well
testing campaigns.
The domestic and global demand for Hydrogen and Helium, combined with new exploration
techniques and experienced personnel, provides Gold Hydrogen with an extraordinary opportunity to
define and ultimately develop a new Natural Hydrogen and Helium gas province.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 9
The combined Natural Hydrogen permit area of the Gold Hydrogen group is in excess of 75,000km2
.
Gold Hydrogen holds one granted petroleum exploration license (the Ramsay Project - PEL 687) and its
two 100% owned subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an
additional seven (7) applications for Natural Hydrogen and Helium exploration within South Australia.
The Company’s Prospective Resource Statements are appended as Tables 4 and 5.
Gold Hydrogen is also the preferred applicant for four (4) gas storage exploration licenses applications
(GSELA) covering an area of 8,107km2
within the Yorke Peninsula portion of PEL 687 in South Australia.
These storage licence applications are in addition to the granted exploration licence and application
licences. A 100% owned Gold Hydrogen subsidiary, Sustainable Minerals Group Pty Ltd, also holds a
mineral lease on the Yorke Peninsula potentially prospective for iron-oxide, copper and / or gold
mineralisation.
The group’s permit areas are characterised by low population densities, cooperative stakeholders and
aspects of the natural environment suited to the exploration and development of a future Natural
Hydrogen gas province. Gold Hydrogen places considerable importance on close liaison with
landholders, traditional owners and all other stakeholders, and this approach has led to the grant of
its key tenement PEL 687 in South Australia. The Company intends to continue to invest in these
efforts.
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be
found on the Company’s website (www.goldHydrogen.com.au) together with a copy of the Company’s
Replacement Prospectus of 29 November 2022.
Gold Hydrogen also has accounts on LinkedIn and Twitter (@GHY_ASX), and copies of market releases
will be emailed to all interested parties who register via info@goldHydrogen.com.au
*** - *** - ***
This announcement has been authorised for release by the Managing Director.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director Karl Schlobohm – Company Secretary / CFO
nmcdonald@goldHydrogen.com.au kschlobohm@goldHydrogen.com.au
+61 7 3521 8038 +61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewsrtrategy.com
+61 421 888 858
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 10
Table 2 – Updated Listing Rule 5.30 Information (Preliminary)
Name: Ramsay 3
Location (UTM zone 53
GDA2020)
X 749096 mE
Y 6151186 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation Parara, Kulpara, Winulta and Hiltaba basement
Gross thickness and net pay
thickness
Total Gross Thickness of 200m – 16m for Parara Limestone, 155m for
Kulpara Formation, 29m for Winulta Formation
Geological rock type Limestones, Dolomites, Dolomitic Sandstones and fractured Granites
Depth of the zones tested 148-870m
Type of test and duration Calibrated mud gas log data and Isotubes
Phase recovered Gas
Other types of recovery N/A
Flow rates, choke size, volumes
recovered
N/A
Fracture stimulation N/A
Material non hydrocarbons Hydrogen, Helium, Nitrogen, CO2
Insufficient information is presently available to determine net pay thickness.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 11
Table 3 – Updated Listing Rule 5.30 Information (Preliminary)
Name: Ramsay 4
Location (UTM zone 53
GDA2020)
X 747787 mE
Y 6149863 mN
Permit PEL 687
Entity holders(s) Gold Hydrogen 100%
Resources Hydrogen, Helium
Formation
Parara, Kulpara Limestone, Kulpara Dolomite, Winulta Sandstone,
Hiltaba Basement
Gross thickness and net pay
thickness
Total Gross Thickness 168m – 28m for Parara Formation, 112m for
Kulpara Limestone, 27m for Winulta Formation, 1m for Hiltaba
Basement
Geological rock type Limestones, Dolomites, Dolomitic Sandstones, Granite Basement
Depth of the zones tested
Parara 160 – 450m, Kulpara Limestone 450 – 580m, Kulpara
Dolomite 580 – 760m.580-760, Winulta Sandstone 760 – 820m
Type of test and duration Calibrated mud gas log data, Isotubes, wireline log data
Phase recovered Gas/water
Other types of recovery N/A
Flow rates, choke size, volumes
recovered
N/A
Fracture stimulation N/A
Material non hydrocarbons Hydrogen, Helium, Nitrogen, CO2
Insufficient information is presently available to determine net pay thickness.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 12
Table 4 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept 2021
PEL Prospects
SPE
PRMS
Sub-
class
1U
Low
Estimate
2U
Best
Estimate
Mean
3U
High
Estimate
Pg Pd Pc
PEL 687
All
Prospects
and Leads
207 1,313 4,187 8,820 22% 48% 10%
Yorke
Peninsula
PEL 687 Ramsay FB Prospect 124 931 2,712 6,989 22% 50% 11%
PEL 687 Ramsay Lst Prospect 10 70 191 492 26% 50% 13%
PEL 687 Maitland Lead 7 26 40 92 17% 35% 6%
Kangaroo
Island
PEL 687 Navigator Lead 34 152 280 678 19% 40% 8%
PEL 687 Kanmantoo Prospect 32 134 237 569 25% 40% 10%
* This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the notes
below, and it should be noted that the estimated quantities of Natural Hydrogen that may potentially
be recovered by the application of a future development project(s) relate to undiscovered
accumulations. These estimates have both an associated risk of discovery and a risk of development.
Further exploration, appraisal and evaluation is required to determine the existence of a significant
quantity of potentially recoverable Natural Hydrogen.
Notes:
1. This reserves statement presents Gold Hydrogen’s Prospective Resources. Gold Hydrogen currently
has no Reserves and no Contingent Resources.
2. Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS
2018 with the understanding that naturally occurring Hydrogen may be considered a hydrocarbon
since it has energy content and can be used stand alone and/or blended with sales gas. “U” implies
Prospective Resources.
3. Per ASX Listing Rules 5.28.4 and 5.28.5 estimates are unrisked and aggregated arithmetically by
category, hence caution that the aggregate low estimate may be a very conservative estimate and the
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 13
aggregate high estimate may be a very optimistic estimate due to the portfolio effects of arithmetic
summation.
4. Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the “full
distribution” and has not been truncated by application of the MEPS (minimum economic pool size
concept).
5. The Reference Point is at the wellhead/edge of lease (i.e. wellhead facilities) so the estimates have
no deduction for flare, vent or fuel consumed in operations.
6. Pg (Chance of Geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality =
Pg x Pd) are calculated as a weight average of the P50’s of the H2 (‘000 Tonnes) of the prospects.
7. Pg incorporates Play Risk and Prospect Risk.
8. Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (i.e. not just economics).
9. Information in the table is rounded. Some totals in the tables may not add due to rounding.
10. This reserves statement:
a. is based on, and fairly represents, information and supporting documentation prepared by the
qualified petroleum reserves and resources evaluators listed in note 14 below. Details of each
qualified petroleum reserves and resources evaluator’s employment and professional
organisation membership are set out in note 14 below;
b. has been approved by Luke Titus, who is a qualified petroleum reserves and resources evaluator
and whose employment and professional organisation membership details are set out in note 14
of this reserves statement;
c. is issued with the prior written consent of Luke Titus and Teof Rodrigues & Associates (“TRA” -
involving Teof Rodrigues, Paul Strong, and Greg Horton, whose employment and professional
organisation membership details are set out in note 14 of this reserves statement) as to the form
and context in which the estimated Natural Hydrogen resources and the supporting information
are presented.
11. There is no change to information or additional information, since the effective date of 30 September
2021, that Gold Hydrogen and TRA are aware of that would materially change the estimates in this
reserves statement.
12. Gold Hydrogen engages independent experts TRA to evaluate reserves and resources.
13. Qualified Petroleum Reserves and Resources Evaluators are:
Name Employer* Professional organisation
Luke Titus Gold Hydrogen SPE
Teof Rodrigues Teof Rodrigues & Associates SPE, PESA
Paul Strong Teof Rodrigues & Associates GSL, AAPG, PESA
Greg Horton Teof Rodrigues & Associates SPE
* As at 30 September 2021
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 14
Table 5: Prospective Resource Statement for Helium
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL Prospects
SPE
PRMS
Sub-
class
Formation
1U
Low
Estimate
2U
Best
Estimate
Mean
3U
High
Estimate
Pg Pd Pc
PEL 687
All
Prospects
All Formations
Total
7 41 96 243 17% 60% 10%
PEL 687
Ramsay
Fault Block
Prospect
Kulpara Formation 0.8 3.6 7.0 17.1 29% 60% 17%
Winulta Formation 0.1 0.6 1.6 4.0 12% 60% 7%
Fractured Basement 0.7 3.8 6.9 16.7 13% 60% 8%
Total 2 8 15 38 20% 60% 12%
PEL 687
South of
Ramsay
Fault Block
Prospect
Kulpara Formation 2.1 12.8 30.5 77.6 23% 60% 14%
Winulta Formation 0.3 2.4 7.7 19.8 8% 60% 5%
Fractured Basement
Hilbata Suite
1.6 10.3 25.5 65.2 12% 60% 7%
Fractured Basement
Yorke Peninsula Heel
1.4 7.7 17.0 42.7 12% 60% 7%
Total 5 33 81 205 16% 60% 10%
* This estimate of Helium Prospective Resources must be read in conjunction with the notes below.
These Helium Prospective Resources are estimated quantities of Helium that may potentially be
recovered by the application of a future development project(s) relate to undiscovered accumulations.
These estimates have both an associated risk of discovery (Pg) and a risk of development (Pd). Further
exploration, appraisal and evaluation is required to determine the existence of a significant quantity of
potentially recoverable Helium.
Notes:
1. This table presents Gold Hydrogen's Prospective Resources for Helium in the Ramsay Field of Yorke
Peninsula only. Gold Hydrogen currently has no Reserves and no Contingent Resources.
2. Estimates are assessed to comply with the ASX Listing Rules for Prospective Resources and SPE-PRMS
2018. SPE have provided guidance regarding the Extension of PRMS Principles to Non-
Hydrocarbon/Non-Traditional Situations including Helium (and Hydrogen).
Refer: https://www.spe.org/en/industry/reserves/non-hydrocarbons/
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
| 15
3. Per ASX LRs 5.28.4&5 estimates are unrisked and aggregated arithmetically by category, hence
caution that the aggregate low estimate may be a very conservative estimate and the aggregate high
estimate may be a very optimistic estimate due to the portfolio effects of arithmetic summation.
4. Probabilistic methods are used to prepare the estimates. The distribution of the estimates is the "full
distribution" and has not been truncated by application of the MEPS (minimum economic pool size)
concept.
5. The Reference Point is at the wellhead/edge of lease (i.e. wellhead facilities) so the estimates have
no deduction for flare, vent or fuel consumed in operations.
6. Pg (Chance of geologic Discovery), Pd (Chance of Development) and Pc (Chance of Commerciality =
Pg x Pd) are calculated as a weight average of the P50's of the Helium Bcf (Billion Cubic Feet) of the
prospect formations.
7. Pg incorporates Play Risk and Prospect Risk.
8. Pd incorporates an assessment across all SPE-PRMS Commerciality Criteria (i.e. not just economics).
9. Information in the table and throughout the Report is rounded. Some totals in the tables may not add
due to rounding.
10. There is no change to information or additional information, since the effective date of 21 February
2024, that Gold Hydrogen and TRA are aware of that would materially change the estimates in this
reserves statement.
QPRRE Statement
The Prospective Resource Statement in this a
Share your feedback
Discover