Ramsay Project - Helium Testing Update
Testing results of up to 36.9% purity 1 for Helium recorded at the well
head/surface. Recent independent and in-house studies confirm
Helium purity levels, additional flow data, and the identification of
broad target zones for further drilling.
Highlights:
Gold Hydrogen continues to evaluate the chemistry, geotechnical data and flow rates
relating to the successful completion of the inaugural Ramsay Project drill program.
Results achieved to date confirm that the Ramsay Project has significant potential to be a
commercially attractive Natural Hydrogen and Helium producer.
CSIRO reporting and data confirms the highest Helium purities ever sampled in groundwater
in Australia by the CSIRO noble gas laboratory, ranging from purity levels of 20% to 25%1
(50,000 times the concentration in the atmosphere).
The Helium flow testing program has confirmed Helium to surface, with helium content
increasing as the hole stabilized (refer Figure 1). World-leading Helium purity levels sampled
up to 36.9%1 at the well head during testing.
Samples of Helium were successfully obtained for specialist composition and isotopic
analysis in specialist laboratories in Australia, London and Paris, with final results expected
shortly.
Drill analysis identified potential 180m thick and extremely high-purity Kulpara Dolomite
zone which featured positive Helium shows in the Stage 1 exploration well testing of
Ramsay 2.
2D seismic survey results indicate further optimal locations across a regional play for future
drilling in PEL 687, for both Natural Hydrogen and Helium. Current and historical evidence
confirms the presence of both Natural Hydrogen and Helium in numerous locations across
the permit (refer Figure 3).
The Company is preparing new drilling and exploration designs to optimize the extraction
of both Natural Hydrogen (1.3 billion Kg Best Estimate Prospective Resource) and Helium
(41 BcF Best Estimate Prospective Resource) for its next drilling campaign. Refer Tables 4
and 5 for full details of Prospective Resources.
1
All Helium sample results have been corrected for air contamination
CSIRO reporting and data confirmed the highest Helium purities ever sampled in
groundwater in Australia by the CSIRO noble gas laboratory ranging from 20% to 25%2 –
CSIRO reporting and data on samples taken during Stage 1 on groundwater samples of well
testing from March and April in the granitic basement at 1005m and Kulpara dolomite at 712m
depth consistently in a range from 20% to 25%2 that these are the highest purities of Helium
ever sampled in groundwater in Australia by the CSIRO noble gas laboratory.
Samples and analysis undertaken by revealed Helium purity levels sampled up to 36.9%2 at
the well head which is believed to be world leading - Testing and analysis received to date
for the exploration well testing of Ramsay 1 and Ramsay 2 showed up to 36.9% purity2 for
Helium recorded in the separator at the well head, on an air and nitrogen corrected basis.
This is in addition to other pressurized downhole samples reporting 20% to 25%2. These
results are believed to be currently the highest ever recorded purities for Helium in the world
on an air-corrected basis.
Exploration flow testing results – The testing program proved that Helium can be extracted
to the surface, and the graph in Figure 1 confirms the ongoing increase in purity during testing
as the well cleaned up. This location showed water ingress during testing but the analysis
indicated that Ramsay 1 could flow up to 100 MScf/day with water on an unconstrained basis.
Seismic survey results - Based on the review of the 575-line kilometer 2D seismic survey, the
Company has identified several locations which are higher up the structure, and hence more
suitable to test the flow potential of the prognosed Ramsay accumulations.
Isotopic analysis – Samples of Helium were successfully obtained for specialist composition
and isotopic analysis in world-leading laboratories in Australia, London and Paris. The
Company is expecting the final reports from the analysis of these samples shortly.
Testing and verification by Petrolab - The pressurised downhole samples have been tested
and analysed by Petrolab in Adelaide for consistency. Two of the results from Stage 1
exploration well testing (12.6%2 He, and 17.9%2 He) are in addition to the 17.5%2 He result
disclosed by the Company in its 6 and 19 December 2023 and 25 March 2024 ASX releases.
Potentially prolific 180m thick Kulpara Dolomite Helium zone – The Company has previously
reported that multiple and significant Helium spikes and readings were recorded from the
mud gas through the initial drilling phrase in the Kulpara Dolomite section. During the Stage
1 exploration well testing of Ramsay 2, the Company perforated five (5) individual sections in
the Kulpara Dolomite formation and obtained downhole pressurised water samples
confirming Helium concentrations in the separated gas of 12.6%2 at 642m, and 17.9%2 at
712m which is in addition to the Helium concentration of 17.5%2 found in the MDT sample
taken at 778m (Refer Figure 2 and Table 1 below).
2
All Helium sample results have been corrected for air contamination
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Permeable formations – The formations tested in the Ramsay 1 and Ramsay 2 wells have
resulted in both Natural Hydrogen and Helium being detected at surface after allowing a
period of shut-in at each well site. The results from the well testing program received to date
have demonstrated the permeability in the Natural Hydrogen and Helium reservoir sections,
which was one of the key objectives of the well testing program, and represented a significant
derisking milestone for the Company. The follow-up Stage 2 testing was conducted by
installing a downhole pump to clean up the water out of the formation, and at the same time
stripping the gas with separator at surface. A high productivity index up to 34 bbl/day/psi was
calculated from Ramsay 1 with average gas-water-ratio (GWR) of 3.05 scf/bbl. The Company
is now studying future development options to extract free Natural Hydrogen and Helium
from new wells to be drilled in up-dip locations, coupled with stripping the gas at surface from
water in a downdip location.
Gold Hydrogen Managing Director, Neil McDonald said: “The results that we continue to
receive are highly encouraging. As an overview of our achievements to date, we have
identified a potentially prolific 180m thick Helium-bearing section of the Kulpara Dolomite
formation, we have recorded Helium at surface in the separator at world-leading purities of
36.9% 3, in addition to the CSIRO dissolved gas in water results of 20% to 25%3 purity, as well
as three pressurised and verified samples of 17.9%3, 12.6%3 and 17.5%3 purity for Helium at
different depths ranging from 642m through to 778m during Stage 1 testing at Ramsay 2. As
there has been extremely limited exploration for Helium in a non-petroleum system
undertaken to date, it remains open as to where the final limits will eventually be. We have
very large prospective resources for both Natural Hydrogen and Helium, covering only a
portion of the Ramsay Project permit. We look forward to receiving further results of the
international isotopic analysis, and planning for future commercialisation of this rare and
potentially large world class Natural Hydrogen and Helium project.”
The Directors of Gold Hydrogen Limited (Gold Hydrogen, ASX: GHY, the Company) are pleased to provide
an operational update on the Company’s groundbreaking Ramsay Project on the Yorke Peninsula,
prospective for both Natural Hydrogen and Helium.
Overview of Exploration Well Testing Operations on the Ramsay 1 and Ramsay 2 Wells
The primary objective of the Ramsay 1 and Ramsay 2 well testing program was to obtain gas and fluid
samples for compositional and isotopic analysis. This has been achieved, and samples have been sent to
established local and international third-party laboratories in Australia, London and Paris.
Secondary objectives of the well testing program included the recovery of Natural Hydrogen and Helium
at surface from reservoir fluid and gas with pressure measurements. These objectives have also been
achieved, with additional recovered samples dispatched to the same international third-party laboratories.
3
All Helium samples have been corrected for air contamination
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
From the complete suite of well testing data being compiled, Gold Hydrogen will better understand the
characteristics of the sub-surface formations and the potential Natural Hydrogen and Helium reservoirs.
This data will assist the Company in gaining technical insights into how the Ramsay Project area could be
further explored and appraised, including optimising future well designs and testing strategies, as well as
providing input for a future pilot plant / proof-of-concept plant design.
Well Testing - Compositional Analysis Results - Helium
As previously reported, the Company recorded a concentration of Helium of up to 17.5% 4 , in the MDT
sample taken at 778m during the drilling of Ramsay 2. During the Stage 1 well testing program, the
Company obtained two (2) pressurised gas samples with Helium concentrations of 12.6%4 at 642m, and
17.9%4 at 712m and, during the Stage 2 well testing program, Ramsay 1 recorded gas to surface at the
separator of purities up to 36.9%4 on an air and nitrogen corrected basis (refer Figure 1 and Tables 1 and
2 below for full details). The recorded Helium concentrations showed a consistent increase during the
Stage 2 flow testing period of Ramsay 1, and did not appear to have reached a stable value at the end of
the testing period.
These Helium concentrations are currently believed to be the highest found in the world in a nonpetroleum system. By comparison, a recent large discovery reported by Pulsar Helium found a Helium
concentration of 13.8% (prior to any possible air-correction) from its Jetstream 1 well in Minnesota, USA 5.
Future Activities
Based on the integration of the drilling and testing results with the newly acquired Ramsay 2D data, Gold
Hydrogen in the process of planning a new drilling and data acquisition campaign to delineate the Ramsay
Natural Hydrogen and Helium accumulation.
This will involve a number of wells, specifically targeting the different pay zones within the identified
structure and using a modified well design to enable testing of the different zones with zonal specific
testing configurations. The data from these wells will constrain the pilot project area and design, with the
aim of demonstrating the commercial production potential of both Natural Hydrogen and Helium from the
Ramsay Project.
In parallel, an extensive 3D seismic survey is being considered over the Ramsay Project area, to illuminate
the stratigraphic and structural subsurface complexities, in order to facilitate detailed resource
assessments and to optimise drilling locations for future exploration and appraisal wells.
The Ramsay 2D regional seismic data has revealed several Natural Hydrogen and Helium prospects, some
of which will be tested with dedicated exploration wells. Selection and timing of these wells will be done
in conjunction with the delineation drilling activities, in order to take advantage of the presence of the
drilling rig and experienced crew.
All Helium sample results have been corrected for air contamination
https://www.startribune.com/Helium-gas-drilling-iron-range-minnesota-pulsar-edelgas-duluthmetals/600351052/
4
5
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Groundbreaking Exploration Testing for Both Natural Hydrogen and Helium
The Ramsay Project well testing program was the first dedicated Natural Hydrogen and Helium well test
operation conducted in Australia, and to the Company’s knowledge, it is likely one of only a few in the
world.
The Company considers this to represent the initial steps of an exciting journey, which is not dissimilar to
that undertaken by various world-renowned and ultimately successful oil and gas projects, such as the
early days in the CSG and shale industries. For those particular resources, the exploration and completion
techniques were developed and optimised over time, improving project economics and ultimately leading
to major projects being developed. The Company anticipates a similar path forward for its Natural
Hydrogen and Helium prospective resources, although the timeframe may be quicker as drilling and
completions technologies developed for other gas resources may be applicable to its Natural Hydrogen
and Helium projects.
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to appraise and develop over time
and with continued success.
There is very little data available for dedicated Natural Hydrogen and Helium wells anywhere in the world
due to the lack of analogue wells. To the Company’s knowledge, the only Natural Hydrogen field currently
in production is located in Mali, West Africa, where Natural Hydrogen production is used to power the
small town of Bourakebougou. It has been reported that the Natural Hydrogen wells in Mali do not have
any decline in production and are continually regenerating and producing at the same rate. 6
Helium is extremely valuable and indicatively, longer-term contracted bulk pricing is expected to
approximate USD450 or AUD$675 per Mcf (thousand cubic feet). 7
Natural Hydrogen has a high energy content, and extracting it even in small quantities may prove
commercial for localised applications. Furthermore, given that Helium was also found within both the
Ramsay 1 and Ramsay 2 wells, being able to extract and process both gases in small quantities may provide
potential short-term commercial and / or proof of concept opportunities to help progress the Ramsay
Project.
Ongoing 2024 Activities
To progress the current focus area of the Ramsay project, and to further explore the balance of PEL 687, a
large scale (circa 575km) regional 2D seismic project has been finalised, and is now in the process of being
interpreted and analysed alongside the Company’s other datasets. The objectives for the seismic program
were to assist in the delineation of the potential Natural Hydrogen and Helium accumulation(s), and to
support the identification of future drilling targets on the Yorke Peninsula.
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with hydrocarbons”,
First Break Volume 40, October 2022 (available via www.goldHydrogen.com.au/technical-articles/ )
7
February 2024, www.noblehelium.com.au , quoting Kornbluth Helium Consulting.
6
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Planning is also underway for further exploration activities which includes testing of additional prospective
structures, and the design of a potential 3D seismic survey over the larger Ramsay area.
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated with
the Ramsay Project and the Company’s commercial and business objectives. These risks relate to the
presence, recovery and potential volumes of both Hydrogen and Helium, but also due to the location of
the resource within agricultural areas and the proximity to National Parks on both Yorke Peninsula and
Kangaroo Island, requiring significant landholder and community engagement. The worldwide, Federal
and South Australian Government and industry efforts to secure Hydrogen as an alternative energy source
provides confidence that any technical and social concerns may be overcome.
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class Natural Hydrogen and Helium
gases in a potentially extensive province in South Australia. This region has recently had its Natural
Hydrogen and Helium potential confirmed by the Company via its maiden drilling campaign. The domestic
and global demand for Hydrogen and Helium, combined with new exploration techniques and experienced
personnel, provides Gold Hydrogen with an extraordinary opportunity to define and ultimately develop a
new Natural Hydrogen and Helium gas province.
The combined permit area of the Gold Hydrogen group is approximately 75,332km2. Gold Hydrogen holds
one granted exploration license (the Ramsay Project - PEL 687) and its two 100% owned subsidiary
companies (White Hydrogen Australia and Byrock Resources) hold an additional seven (7) applications for
Natural Hydrogen and Helium exploration within South Australia. Gold Hydrogen is also the preferred
applicant for four (4) gas storage exploration licenses applications (GSELA) covering an area of 8,107km2
within the Yorke Peninsula portion of PEL 687 in South Australia. These storage licence applications are in
addition to the granted exploration licence and application licences.
The group’s permit areas are characterised by low population densities, cooperative stakeholders and
aspects of the natural environment suited to the exploration and development of a future Natural
Hydrogen and Helium gas province. Gold Hydrogen places considerable importance on close liaison with
landholders, traditional owners and all other stakeholders, and this approach has led to the grant of its
key tenement PEL 687 in South Australia. The Company intends to continue to invest in these efforts.
Further Information
Further information on the Gold Hydrogen group, its projects, and its Board and Management can be
found on the Company’s website (www.goldhydrogen.com.au) together with a copy of the Company’s
Replacement Prospectus of 29 November 2022.
Gold Hydrogen also has accounts on LinkedIn and Twitter (@GHY_ASX), and copies of market releases will
be emailed to all interested parties who register via info@goldhydrogen.com.au
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
This announcement has been authorised for release by the Managing Director.
On behalf of the Board
Karl Schlobohm
Company Secretary
For Company Enquiries Contact:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
+61 7 3521 8038
Karl Schlobohm – Company Secretary / CFO
kschlobohm@goldhydrogen.com.au
+61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Prospective Resource Statements
The Prospective Resource Statements for Natural Hydrogen and for Helium have been included in this
announcement under the approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen,
who is a Qualified Petroleum Reserves and Resources Evaluator. Mr Hadi Subrata confirms that, as at the
date of this announcement, there is no change to information or additional information, since the effective
dates, that would materially change the estimates of prospective resources quoted.
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown
risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside
the control of the Company and which are subject to change without notice and could cause the actual
results, performance or achievements of the Company to be materially different from the future results,
performance or achievements expressed or implied by such statements. Past performance is not
necessarily a guide to future performance and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking statements or other forecast. Nothing contained
in this announcement, nor any information made available to you is, or and shall be relied upon as, a
promise, representation, warranty or guarantee as to the past, present or the future performance of Gold
Hydrogen Limited.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 1. Ramsay 1 He concentrations (air and nitrogen corrected) measured during the testing of the open
Helium zone. The concentrations consistently increase over the testing period, with wellhead sample
laboratory analysis confirming the separator measurement.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 2. Ramsay 2 logs over the Kulpara Dolomite section with bailer sample and MDT depths and air corrected
Helium concentrations
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Figure 3 – Various data points indicating the presence of Natural Hydrogen and Helium in PEL 687
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Table 1 – Sample Analysis Table – Ramsay 2 Well – Stage 1 Testing
Name:
Location (UTM zone 53
GDA2020)
X
Ramsay 2
747,761.61
Y
6149371.41
Permit
PEL687
Entity holder(s)
Gold Hydrogen 100%
Zones tested
1 (MDT)
2
3
Resources
Helium with minor
Hydrogen
Helium with minor
Hydrogen
Helium with minor
Hydrogen
Formation
Kulpara Dolomite
Kulpara Dolomite
Kulpara Dolomite
Gross thickness and net pay
thickness
180m Gross
180m Gross
180m Gross
Geological rock type
Dolomite
Dolomite
Dolomite
Depth of the zones tested
778mMD
712mMD
642mMD
Pressure test - commingled
zone test for few hours
follow by overnight build up
Pressure test - commingled
zone test for few hours
follow by overnight build up
Pressure test - commingled
zone test for few hours
follow by overnight build up
Phase recovered
Gas/Water
Gas/Water
Gas/Water
Corrected H2 and He
concentration in gas
recovered from downhole
sample
17.52% He
17.9% He
12.6% He
Flow rates, choke size,
volumes recovered
Refer to Stage 2 well test
Refer to Stage 2 well test
Refer to Stage 2 well test
Fracture stimulation
None
None
None
Nitrogen, Hydrogen
Nitrogen, Hydrogen
Nitrogen, Hydrogen
Type of test
Material non hydrocarbons
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Table 2 – Sample Analysis Table – Ramsay 1 Well – Stage 2
Name:
Location (UTM zone 53 GDA2020)
X
Ramsay 1
748,208.07
Y
6149545.7
Permit
PEL687
Entity holders
Gold Hydrogen 100%
Zones tested
Zone 2 and 3
Resources
Helium
Formation
Kulpara Dolomite
Gross thickness and net pay
thickness
180m Gross
Geological rock type
Dolomite
Depth of the zones tested
900 mMD
Type of test
Commingled pressure test
Phase recovered
Gas/Water
Corrected H2 and He concentration
in gas recovered from downhole
sample
36.9% He
Flow rates, choke size, volumes
recovered
Fracture stimulation
Material non hydrocarbons
1 Mscf/day gas constraint by pump capacity
and flow intermittently with water; choke size
20/64 inch; volumes recovered 0.55 Mscf
None
Nitrogen, Hydrogen
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Table 3 - Summary of Preliminary Results on Additional Samples (as released 2 August 2024)
Name:
Location (UTM zone 53 GDA2020)
X
Ramsay 2
747,707.85
Y
6149385.46
Permit
PEL687
Entity holders
Gold Hydrogen 100%
Zones tested
Zone 1
Zone 2 and 3
Zone 7 and 8
Resources
Helium
Helium
Hydrogen
Formation
Granite Basement
Kulpara Dolomite
Parara Limestone
>200m Gross
180m Gross
406m Gross
Geological rock type
Granite
Dolomite
Limestone
Depth of the zones tested
1002mMD
712 mMD
197mMD and 289mMD
Type of test
Pressure test
Commingled pressure test
Commingled pressure
test
Phase recovered
Gas/Water
Gas/Water
Gas/Water
20% to 25% He
20% to 25% He
42% H2 (still increasing)
Gross thickness and net pay
thickness
Corrected H2 and He concentration
in gas recovered from downhole
sample
Flow rates, choke size, volumes
recovered
Fracture stimulation
Material non hydrocarbons
TBA
None
None
None
Nitrogen, Hydrogen
Nitrogen, Hydrogen
Nitrogen, Helium
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Table 4 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept
2021
SPE
2U
3U
1U
PRMS
Best
Mean
High
Pg
Pd
Pc
Low
PEL
Prospects
SubEstimate
Estimate Estimate
class
All
PEL 687
Prospects
207
1,313
4,187
8,820
22% 48% 10%
and Leads
Yorke
Peninsula
PEL 687
Ramsay FB
Prospect
124
931
2,712
6,989
22% 50% 11%
PEL 687
Ramsay Lst
Prospect
10
70
191
492
26% 50% 13%
PEL 687
Maitland
Lead
7
26
40
92
17% 35%
6%
Kangaroo
Island
PEL 687
Navigator
Lead
34
152
280
678
19% 40%
8%
PEL 687
Kanmantoo Prospect
32
134
237
569
25% 40% 10%
*This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the notes
in the Company’s ASX release of 13 January 2023.
It should be noted that the estimated quantities of Natural Hydrogen that may potentially be recovered
by the application of a future development project(s) relate to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further exploration,
appraisal and evaluation is required to determine the existence of a significant quantity of potentially
recoverable Natural Hydrogen.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this announcement is based on, and fairly
represents, information and supporting documentation prepared by independent consultants “Teof
Rodrigues & Associates” with an effective date of 30 September 2021, and which forms part of the
Company’s Replacement Prospectus dated 29 November 2022. The Prospective Resource Statement,
together with all relevant notes, also appears in the Company’s ASX release of 13 January 2023.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Table 5 – Prospective Resource Statement for Helium
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL
PEL
Prospects
687
PEL 687
PEL 687
SPE
PRMS
Subclass
Formation
1U
2U
3U
Low
Best
Mean High
Estimate Estimate
Estimate
Pg
All
Total
7
41
96
243
17% 60% 10%
Kulpara Formation
0.8
3.6
7.0
17.1
29% 60% 17%
Winulta Formation
0.1
0.6
1.6
4.0
12% 60% 7%
Fractured Basement
0.7
3.8
6.9
16.7
13% 60% 8%
Total
2
8
15
38
20% 60% 12%
Kulpara Formation
2.1
12.8
30.5
77.6
23% 60% 14%
Winulta Formation
0.3
2.4
7.7
19.8
8%
Fractured Basement
Prospect Hilbata Suite
1.6
10.3
25.5
65.2
12% 60% 7%
7.7
17.0
42.7
12% 60% 7%
33
81
205
16% 60% 10%
All
Prospects
Ramsay
Fault Block
South of
Ramsay
Fault Block
Prospect
Formations
Fractured Basement
1.4
Yorke Peninsula Heel
Total
5
Pd
60% 5%
*This estimate of Helium Prospective Resources must be read in conjunction with the notes in the
Company’s ASX release of 21 February 2024.
It should be noted that the estimated quantities of Helium that may potentially be recovered by the
application of a future development project(s) relate to undiscovered accumulations. These estimates
have both an associated risk of discovery and a risk of development. Further exploration, appraisal and
evaluation is required to determine the existence of a significant quantity of potentially recoverable
Helium.
QPRRE Statement - Helium
The Prospective Resource Statement for Helium in this announcement is based on, and fairly represents,
information and supporting documentation prepared by independent consultants “Teof Rodrigues &
Associates” with an effective date of 21 February 2024, and which was announced by the Company on
that date together with the accompanying assumptions and notes.
Gold Hydrogen Limited, Level 14, 110 Eagle Street (GPO Box 801) Brisbane, Qld 4000 | info@goldhydrogen.com.au | ABN 74 647 468 899
Pc
Share your feedback
Discover