AEP Perth Conference Presentation
Released
Released
Announcement PDF
Ramsay 1 & 2 - Learnings from the First
Natural Hydrogen Exploration Wells in
Australia
AEP Conference – Perth May 2024
Dr. Josh Whitcombe - COO Gold Hydrogen
Gold Hydrogen Limited
May 2024
1
Important Notice & Disclaimer
This presentation is not a prospectus, disclosure document or offering document under Australian law or under any other law. It is
for informational purposes only. This document does not constitute, and should not be construed as, an offer to issue or sell or a
solicitation of an offer or invitation to subscribe for, buy or sell securities in Gold Hydrogen Limited ABN 74 647 468 899 (Gold
Hydrogen).
Any material used in this presentation is only an overview and summary of certain data selected by the management of Gold
Hydrogen. The presentation does not purport to contain all the information that a prospective investor may require in evaluating a
possible investment in Gold Hydrogen nor does it contain all the information which would be required in a disclosure document
prepared in accordance with the requirements of the Corporations Act and should not be used in isolation as a basis to invest in Gold
Hydrogen. The information contained in this presentation is not investment or financial product advice and has been prepared as
general information only, without consideration for your particular investment objectives, financial situation or particular needs.
Recipients of this presentation must make their own independent investigations, consideration, and evaluation of Gold Hydrogen.
Gold Hydrogen recommends that potential investors consult their professional advisor/s as an investment in Gold Hydrogen is
considered to be speculative in nature.
Statements in this presentation are made only as of the date of this presentation unless otherwise stated and the information in this
presentation remains subject to change without notice. Reliance should not be placed on information or opinions contained in this
presentation.
To the maximum extent permitted by law, Gold Hydrogen disclaims any responsibility to inform any recipient of this presentation on
any matter that subsequently comes to its notice which may affect any of the information contained in this document and
presentation and undertakes no obligation to provide any additional or updated information whether as a result of new information,
future events or results or otherwise.
To the maximum extent permitted by law, no representation or warranty, express or implied, is made as to the fairness, accuracy,
completeness or correctness of the information, opinions or conclusions contained in or derived from this presentation or any
omission from this presentation or of any other written or oral information or opinions provided now or in the future to any person.
To the maximum extent permitted by law, neither Gold Hydrogen nor, any affiliates, related bodies corporate and their respective
officers, directors, employees, advisors and agents (Relevant Parties), nor any other person, accepts any liability as to or in relation to
the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or
derived from this presentation or any omission from this presentation or of any other written or oral information or opinions
provided now or in the future to any person.
This presentation includes information regarding the past performance of Gold Hydrogen. Recipients of this presentation should be
aware that past performance should not be relied upon as being indicative of future performance.
Gold Hydrogen Limited
This presentation contains statistics, data and other information pertaining to Gold Hydrogen’s business and operations. Recipients
of this presentation should note that industry and market data and statistics are inherently predictive and subject to uncertainty and
not necessarily reflective of actual industry or market conditions. There is no assurance that any of the estimates or projections in
this presentation will be achieved. Gold Hydrogen has not independently verified, and cannot give any assurances to the accuracy or
completeness of, this market and industry data or the underlying assumptions used in generating this market and industry data.
This presentation contains “forward looking statements” concerning the financial condition, results of operations and business of
Gold Hydrogen. All statements other than statements of fact or aspirational statements, are or may be deemed to be “forward
looking statements”. Often, but not always, forward looking statements can generally be identified by the use of forward looking
words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, “outlook”, and “guidance”, or other
similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, future or
anticipated production or construction commencement dates and expected costs, resources or reserves, exploration results or
production outputs. Forward looking statements are statements of future expectations that are based on management’s current
expectations and assumptions and known and unknown risks and uncertainties that could cause the actual results, performance, or
events to differ materially from those expressed or implied in these statements. These risks include, but are not limited to price
fluctuations, actual demand, currency fluctuations, drilling and production results, commercialization, reserve estimates, loss of
market, industry competition, environmental risks, physical risks, legislative, fiscal, and regulatory developments, economic and
financial market conditions in various countries and regions, political risks, project delay or advancement, approvals, and cost
estimates. More detail on the risks relevant to Gold Hydrogen’s business and operations is set out in Risks section of this
presentation.
Prospective Resource Statements
The Prospective Resource Statements for Natural Hydrogen and for Helium have been included in presentation under the approval of
Mr Billy Hadi Subrata, Chief Engineer for Gold Hydrogen, who is a Qualified Petroleum Reserves and Resources Evaluator. Mr Hadi
Subrata confirms that, as at the date of this announcement, there is no change to information or additional information, since the
effective dates, that would materially change the estimates of prospective resources quoted.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this presentation is based on, and fairly represents, information and
supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of 30
September 2021, and which forms part of the Company’s Replacement Prospectus dated 29 November 2022. The Prospective
Resource Statement, together with all relevant notes, also appears in the Company’s ASX release of 13 January 2023.
QPRRE Statement - Helium
The Prospective Resource Statement for Helium in this announcement is based on, and fairly represents, information and supporting
documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of 21 February 2024, and
which was announced by the Company on that date together with the accompanying assumptions and notes.
2
Gold Hydrogen – Who are we?
Listed in Jan 2023
Share Price Performance (Previous 12 months)
• Moved quickly to build an in-house
team
• Worked with the SA Department of
Energy and Mines (DEM) to secure all
required approvals
• Spudded Ramsay 1, Australia’s first
dedicated natural hydrogen well on
11th October 2023
Gold Hydrogen Limited
3
What is Natural Hydrogen?
Hydrogen gas that is naturally formed in the earth and not
“manufactured”
Our Permit has:
•
Source & Generation – radiolysis and hydrolysis of
Proterozoic rocks. Area rich in iron-oxide-coppergold+uranium (IOCG) deposits
•
Seals & Traps – preservation time since deposition of
Cambrian over source rocks, which include tight micrites and
evaporites
•
Structure – located on major lithospheric boundary and bend
in the Tasman line of the Delamerian orogeny and within the
setting of the tectonically active horst-graben Adelaide
extensional rift
•
Reservoir – massive-fractured-basement (MFB) play that
extends >5-km in depth with discovered flows of up to 90%
natural hydrogen
Gold Hydrogen Limited
4
Potentially Lower Cost Natural Hydrogen Plus Helium
Certified Prospective Resource for natural
Title over natural hydrogen & hydrogen with an unrisked Best Estimate of 1.3
helium resource occurrences billion kilograms (see Slide 8) and unrisked Best
and prospective areas
Estimate of 41Bcf of helium with a mean
average of 96 Bcf (see Slide 9)
Flagship ‘Ramsay Project’,
exploration permit granted,
plus application permits
Ramsay Project 7,820 km2 (green on map) is
100% owned by Gold Hydrogen. Other locations
under exclusive application to Gold Hydrogen
are a further 67,512 km2
Ramsay 1 and Ramsay 2
exploration well results
indicate Hydrogen and
Helium
Preliminary gas sample analyses have yielded
high purity levels of up to 73% hydrogen plus
helium in high purity levels at up to 6.8% raw
gas
Enabling engagements with
leading global hydrogen
experts and contractors
Strategic engagements to date with CSIRO, SLB
(Schlumberger), Total Seismic, Xcalibur, Savanna
Energy Services
Significant commercial and
environmental competitive
advantage
Naturally occurring hydrogen offers significant
cost and emission advantages relative to other
sources of hydrogen production. Global helium
projects may be commercial from 1% purity or
less and is rare and extremely valuable
Gold Hydrogen Limited
Figure: Overview of Gold Hydrogen tenements
5
Global Hydrogen Forecast
Substantial investment laying the foundation for Hydrogen use
Global Hydrogen Demand by Sector, Net Zero Emissions
Target Scenario (Mt)
527
A$629B
A$184B
31
Projected annual
investment on
hydrogen projects in
2050
102
Projected annual
investment on
hydrogen projects in
2030
ESG push to decarbonise
industries and economies is
underpinning demand
for hydrogen
207
212
42
Natural hydrogen as a
carbon-neutral, low-cost
source presents a very
attractive opportunity to
facilitate decarbonisation
Source: Frost & Sullivan Report - Page 29 of Gold Hydrogen Prospectus
Gold Hydrogen Limited
52
87
25
36
187
93
51
2020
2030
Industry
Transport
2050
Electricity
Other
1
Source: International Energy Agency, Oct-2021
1. Other includes buildings, agriculture and refineries
6
Types of Hydrogen Production
Naturally occurring Hydrogen offers significant cost and / or carbon advantages relative
to other Hydrogen production (manufacturing) processes
Gold Hydrogen is exploring for ‘gold’ or ‘white’ (natural) Hydrogen
Energy source
Environmental impact
Gold / White
(natural)
Grey
Black/Brown
Blue
Green
Natural hydrogen
Natural gas
Coal
Natural gas /
coal
Renewables /
biomass
Low
High
Very High
Low
Low
$1.00
$5.60
$6.20-$6.40
$10.20-$10.30
P: $6.40-$25.50
A: $4.70-$23.20
No thermal process
Production cost (A$/kg)1,2
Cost comparable to existing
power generation3
Today, ~95% of all hydrogen produced
Source: Frost and Sullivan, Sep-2022 (Refer Gold Hydrogen Replacement Prospectus dated 29 November 2022)
1.
Source: Christophe Rigollet1, Alain Prinzhofer2,3, Natural Hydrogen: A New Source of Carbon-Free and Renewable Energy That Can Compete With Hydrocarbons,
is from natural gas
First Break, Volume 40, Issue 10, Oct 2022, p. 78 – 84
DOI: https://doi.org/10.3997/1365-2397.fb2022087; “The Bourakébougou field, in Mali, represents the first natural hydrogen deposit studied both scientifically and industrially.
It gives us information on its renewability, on the natural flows involved and therefore on its sustainable exploitation. It is possible to estimate that the cost of operating hydrogen would be less than $1/kg, which is significantly cheaper than any
manufactured hydrogen, whether green, grey, or blue. Equivalent work is in progress in other continents, in order to be able to compare our knowledge of this Malian field with other fields in the world, which will make it possible to better ensure the industrial and societal interest of R&D for this new field.”
2.
P = Polymer electrolyte membrane electrolysis. A = Alkaline Electrolysis. Gold Hydrogen cost is an estimate
3.
For industrial buyers, a hydrogen offtake price of €3 ($4.50) per kg would be required to incentivise hydrogen production over power generation
Gold Hydrogen Limited
7
Gold Hydrogen Prospective Resources (Using PRMS Guidelines)
American Beach -1
Hydrogen Discovery
Flowed 70% H2 @ 290m
Ramsay Oil Bore-1
Hydrogen Discovery
Flowed 84% H2 @
508m
H
2
Certified Prospective Hydrogen Resources, existing discoveries and
drill ready hydrogen prospects (calculated volume not determined)
Unrisked Prospective Hydrogen Resources, PEL 687
SPE-PRMS Sub-Class Category
Low Estimate
(kTonnes)
Best Estimate
(kTonnes)
High Estimate
(kTonnes)
Prospect
165
1135
8050
Lead
42
178
770
Total
207
1313
8820
H
2
H
2
H
2
Diagrammatic Section
Gold Hydrogen Limited
NOTE - All estimates are unrisked and aggregated arithmetically by category,
hence caution that the aggregate low estimate maybe a conservative
estimate and the aggregate high estimate maybe very optimistic estimate
due to the portfolio effects of arithmetic summation. The estimated
quantities of hydrogen that may potentially be recovered by the application
of future development project(s) relate to undiscovered accumulations.
These estimates have both an associated risk of discovery (Pg), risk of
development (Pd) and risk of commercialization (Pc). Further exploration,
appraisal and evaluation is required to determine the existence of a
significant quantity of potentially recoverable Natural Hydrogen.
See ASX release of 13 January 2023 for full details and notes
8
Gold Hydrogen Prospective Resources (Using PRMS Guidelines)
Certified Prospective Helium Resources, Ramsay Field (PEL 687 Yorke
Peninsula)
Unrisked Prospective Helium Resources, PEL 687
SPE-PRMS Sub-Class Category
Low Estimate
(Bscf)
Best Estimate
(Bscf)
High Estimate
(Bscf)
Prospect Ramsay Fault Block
2
8
38
Prospect South of Ramsay Fault
Block
5
33
205
Total
7
41
243
NOTE - All estimates are unrisked and aggregated arithmetically by category,
hence caution that the aggregate low estimate maybe a conservative
estimate and the aggregate high estimate maybe very optimistic estimate
due to the portfolio effects of arithmetic summation. The estimated
quantities of helium that may potentially be recovered by the application of
future development project(s) relate to undiscovered accumulations. These
estimates have both an associated risk of discovery (Pg), risk of
development (Pd) and risk of commercialization (Pc). Further exploration,
appraisal and evaluation is required to determine the existence of a
significant quantity of potentially recoverable helium.
Yorke Peninsula has granites widely distributed in the subsurface
Gold Hydrogen Limited
See ASX release of 21 February 2024 for full details and notes
9
Why the Yorke Peninsula? Historical Discovery
Table 1 – Shallow discovered natural hydrogen & associated gas compositions, Yorke Peninsula
and Kangaroo, Island, SA
Bulletin No. 22, Department of Mines, Geological Survey of South Australia, The Search for Oil in South
Australia, by L. Keith Ward, Consultant Geologist, reported the following, Page(s) 14 and 15 (20)
Gold Hydrogen Limited
10
Ramsay Well on Existing Seismic Line Y82-A1
A
TWT (ms)
Seismic to well tie in progress and not accurate. Wells are projected onto the line
B
A
B
Multiple reprocessing iterations – velocities not initially correct
Gold Hydrogen Limited
11
Falcon AGG Survey
Completed mid 2023
Predicted depth to basements from
surface derived from magnetic data
Tilt angle attribute from terrain corrected
gravity.
Terrain corrected gravity measurement.
Total magnetic intensity reduced to the
pole
Lack of density contrast between limestones and basement reduces options to predict basement depth
Gold Hydrogen Limited
12
Drill Program Preparation – Well Location & Land Access
• Uncertainty on exact
historical bore location
• End of an old seismic
line
• Working with
landowner for minimal
disturbance
• Regulations – Petroleum
Act but a hydrogen well
• DEM in SA were
fantastic to work with
and enabled all
approvals to be
obtained on time
Gold Hydrogen Limited
13
Ramsay 1 and Ramsay 2 Wells Successfully Drilled Q4, 2023
• Excellent Contractors willing to work with us and
supported us in obtained approvals
Savanna Energy (Rig)
SLB (Cementing, Wireline, Mud Logging)
Petro Lab (Gas samples)
Coho Resources (Fluids)
Baker Hughes & Ulterra (Drill Bits)
• One crew with a break between wells
Learnings maintained
Great culture on site
• Stayed local and used local contractors where
possible
• Site visits
Government, locals and landowners
Gold Hydrogen Limited
14
Ramsay 1 and Ramsay 2 Wells: Technical Analysis
Ramsay 2
Ramsay 1
Ramsay Limestones
Unconformity?
Minlaton Fm
Cambrian
Parara Limestones
Mesoproterozoic
Paleo Bathymetry Infill
Erosional Unconformity
Gold Hydrogen Limited
Siltstones/Limestones/
Evaporites
Limestones
Kulpara Fm
(limestones)
Limestones
Kulpara Fm
(dolomites)
Dolomites
Winulta Fm
Siltstones/Sandstones
Basement
(weathered)
Basement
(Unweathered)
Granites
15
Ramsay 1 and Ramsay 2 Wells: Hydrogen and Helium
Ramsay 2
C
C
B
C
A
B
MDT
MDT
Spikes in the continuous hydrogen log from the mud gas in Parara
limestones, related to hydrogen bearing fractures. Independent mud
gas analysis confirms the hydrogen concentration measured by
continuous mud gas logs
Increased helium in mud gas related to an increase in vuggy
porosity in the base Kulpara Fm. Helium spike at 641mMD related
to open fracture. MDT sample confirms high helium concentrations
(17.5% in MDT from 778mMD)
Hydrogen and helium spike in basement related to a large open
basement fracture and suggests hydrogen and helium generation at
this location, with vertical migration the most likely model
Gas from MDT sample from 778 mMD reveals very high helium
concentrations
A
Gold Hydrogen Limited
16
What is Next…
•
Phase 1 well testing completed in April, significant learns and additional testing
being planned.
•
Hydrogen and Helium are different to oil and gas, well testing needed to be
adaptive
•
Excellent well testing contractors
Well Pro (CTU and Nitrogen)
SGS (Flow-back Package)
MPC Kinetic (Perforating and Wireline)
Petro Lab and CSIRO (Gas and Water Sampling)
•
DEM again very supportive in working through approvals to allow well testing
under the Petroleum Act
•
Regional seismic contracted for mid-year
•
Return to Ramsay 1 and 2 for an extended well test
•
Ramsay 3 and 4 later in the year
•
Progressing Proof of Concept Pilot to allow Natural Hydrogen and Helium to be
produced
Gold Hydrogen Limited
Initial Well Testing
17
New Regional 2D Seismic - June & July
Existing seismic data is
very sparse and only the
blue lines are available
for interpretation. The
red seismic lines are
poorly imaged paper
sections only.
Ramsay 2DSS is
planned for June 2024
and consists of 658km
of modern 2D data
covering the Ramsay
project area and the
potential exploration
opportunities. Details
of the program may
change.
A
Gold Hydrogen Limited
18