AGM Presentation
Released
Released
Announcement PDF
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
AGM Presentation – 2026
Neil McDonald – Managing Director
2
Gold Hydrogen Limited
Important Notice & Disclaimer
This presentation is not a prospectus, disclosure document or offering document under Australian law or under any other law.
It is for informational purposes only. This document does not constitute, and should not be construed as, an offer to issue or
sell or a solicitation of an offer or invitation to subscribe for, buy or sell securities in Gold Hydrogen Limited ABN 74 647 468 899
(Gold Hydrogen).
Any material used in this presentation is only an overview and summary of certain data selected by the management of Gold
Hydrogen. The presentation does not purport to contain all the information that a prospective investor may require in
evaluating a possible investment in Gold Hydrogen nor does it contain all the information which would be required in a
disclosure document prepared in accordance with the requirements of the Corporations Act and should not be used in isolation
as a basis to invest in Gold Hydrogen. The information contained in this presentation is not investment or financial product
advice and has been prepared as general information only, without consideration for your particular investment objectives,
financial situation or particular needs. Recipients of this presentation must make their own independent investigations,
consideration, and evaluation of Gold Hydrogen. Gold Hydrogen recommends that potential investors consult their
professional advisor/s as an investment in Gold Hydrogen is considered to be speculative in nature.
Statements in this presentation are made only as of the date of this presentation unless otherwise stated and the information
in this presentation remains subject to change without notice. Reliance should not be placed on information or opinions
contained in this presentation.
To the maximum extent permitted by law, Gold Hydrogen disclaims any responsibility to inform any recipient of this
presentation on any matter that subsequently comes to its notice which may affect any of the information contained in this
document and presentation and undertakes no obligation to provide any additional or updated information whether as a result
of new information, future events or results or otherwise.
To the maximum extent permitted by law, no representation or warranty, express or implied, is made as to the fairness,
accuracy, completeness or correctness of the information, opinions or conclusions contained in or derived from this
presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in
the future to any person.
To the maximum extent permitted by law, neither Gold Hydrogen nor, any affiliates, related bodies corporate and their
respective officers, directors, employees, advisors and agents (Relevant Parties), nor any other person, accepts any liability as to
or in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising
out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral
information or opinions provided now or in the future to any person.
This presentation includes information regarding the past performance of Gold Hydrogen. Recipients of this presentation
should be aware that past performance should not be relied upon as being indicative of future performance.
This presentation contains statistics, data and other information pertaining to Gold Hydrogen’s business and operations.
Recipients of this presentation should note that industry and market data and statistics are
inherently predictive and subject to uncertainty and not necessarily reflective of actual industry or market conditions. There is
no assurance that any of the estimates or projections in this presentation will be achieved. Gold Hydrogen has not
independently verified, and cannot give any assurances to the accuracy or completeness of, this market and industry data or
the underlying assumptions used in generating this market and industry data.
This presentation contains “forward looking statements” concerning the financial condition, results of operations and business
of Gold Hydrogen. All statements other than statements of fact or aspirational statements, are or may be deemed to be
“forward looking statements”. Often, but not always, forward looking statements can generally be identified by the use of
forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, “outlook”, and
“guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of
management, future or anticipated production or construction commencement dates and expected costs, resources or
reserves, exploration results or production outputs. Forward looking statements are statements of future expectations that are
based on management’s current expectations and assumptions and known and unknown risks and uncertainties that could
cause the actual results, performance, or events to differ materially from those expressed or implied in these statements. These
risks include, but are not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results,
commercialization, reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal,
and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project
delay or advancement, approvals, and cost estimates. More detail on the risks relevant to Gold Hydrogen’s business and
operations is set out in Risks section of this presentation.
Prospective Resource Statements
The Prospective Resource Statements for Natural Hydrogen and for Helium have been included in presentation under the
approval of Mr Billy Hadi Subrata, Chief Engineer for Gold Hydrogen, who is a Qualified Petroleum Reserves and Resources
Evaluator. Mr Hadi Subrata confirms that, as at the date of this announcement, there is no change to information or additional
information, since the effective dates, that would materially change the estimates of prospective resources quoted.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this presentation is based on, and fairly represents, information
and supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of
30 September 2021, and which forms part of the Company’s Replacement Prospectus dated 29 November 2022. The
Prospective Resource Statement, together with all relevant notes, also appears in the Company’s ASX releases of 13 January
2023 and 30 October 2024.
QPRRE Statement - Helium
The Prospective Resource Statement for Helium in this announcement is based on, and fairly represents, information and
supporting documentation prepared by independent consultants “Teof Rodrigues & Associates” with an effective date of 21
February 2024, and which was announced by the Company on that date (as well as 30 October 2024) together with the
accompanying assumptions and notes.
goldhydrogen.com.au | ASX:GHY |
3
Gold Hydrogen Limited
goldhydrogen.com.au | ASX:GHY |
Gold Hydrogen – A Transformational Year of Achievement
1. FOUR SUCCESSFUL WELLS
Four exploration and appraisal wells successfully drilled and tested, establishing the
Ramsay Project's significant Helium and Natural Hydrogen potential.
2. WORLD-CLASS HELIUM DISCOVERY
Helium purities of up to 36.9%, among the highest reported globally. Appraisal
testing results indicate 37Mcf per well per day. Helium-3 at elevated levels.
3. HELIUM FLOWED, SEPARATED AND PURIFIED
Successfully flowed Helium to surface, separated, purified and bottled onsite –
demonstrating a critical step towards commercial production.
4. WORLD-LEADING NATURAL HYDROGEN RESULTS
Natural Hydrogen concentrations of up to 97%, on an air-corrected basis.
5. BREAKTHROUGH NATURAL HYDROGEN PRODUCTION POTENTIAL
Appraisal results support potential production exceeding 100 kg per day per well,
equivalent to more than 36 tonnes annually per well.
6. COMMERCIALISATION PATHWAYS ADVANCING
Accelerating commercial development planning for both Helium and Natural
Hydrogen, including the potential for large-scale green methanol production.
7. FURTHER EXPLORATION & APPRAISAL
Multiple future exploration targets identified for future drilling and resource
expansion. Ramsay 3 wellsite
4
Gold Hydrogen Limited
goldhydrogen.com.au | ASX:GHY |
Executive Summary – Natural Hydrogen and Helium Projects
Ramsay Project 100% owned
5,200 km2
plus a further 69,472 km2 under
exclusive application
Title over certified Prospective
Resources
1.3 billion kg of Natural Hydrogen1
41 Bcf of Helium1
(with a mean of 96 Bcf)
High purity gas sample levels2
Up to 97% Natural Hydrogen
Up to 36.9% Helium
Helium-3 Detected in 2024 and
2026 Samples
Engagements to date with leading
global experts and contractors
CSIRO, Schlumberger, Total Seismic,
Xcalibur, Savanna Energy Services,
Quantum Technology
Commercial and environmental
competitive advantages
Natural Hydrogen provides cost3 and
emission advantages over other
production sources
A number of global gas projects are
commercial with much lower
concentrations of Helium
(<1% Helium as a by-product)
1. Refer Prospective Resources Tables attached for full details.
2. Refer ASX Announcements of 27 May 2024, 2 August 2024, 17 & 30 October 2024, 4 December 2025 and 11 November 2026. Gas samples are air and nitrogen corrected.
3. Based on evidence from the Bourakebougou Field in Mali, which has been operating since 2012 – see also Slide 19.
5
Gold Hydrogen Limited
goldhydrogen.com.au | ASX:GHY |
Executive Summary – Project and Corporate Status
01
RESERVOIR APPRAISAL
2026 Helium testing completed at Ramsay 1–3; Kulpara Dolomite continuity demonstrated across ~2.2 km.
02
HIGH-GRADE HELIUM
Sustained air-corrected Helium ~19% (R1) and ~20% (R2); project-wide average ~15.2%. Appraisal testing results indicate 37Mcf per
well per day. Helium-3 at elevated levels.
03
HELIUM TO SURFACE
Helium flowed, separated, purified and bottled onsite; Ramsay 3 fluid rates reached ~14,000 bbl/day.
04
NATURAL HYDROGEN
Natural Hydrogen flowed at R2/R3; up to 97% air-corrected H₂ recorded while drilling; ~100 kg/day/well is modelled.
05
HELIUM-3 CONFIRMED
Oxford University detected ³He in all six R1/R2 samples, up to 1,220 ppt; commercial recovery to be proven.
06
COMMERCIAL PATHWAYS
Modular Helium pilot and resource assessment progressing; MGC Green Methanol MOU; A$7.9m placement incl. A$4m Sprott.
Source: GHY ASX releases of 29 June 2026, 29 July 2026, 25 August 2026, 20 October 2026, 2 November 2026 and 11 November 2026.
Illustrative development opportunities are not production forecasts; resource certification, further testing, engineering and economics remain outstanding.
6
Gold Hydrogen Limited
goldhydrogen.com.au | ASX:GHY |
Gold Hydrogen – Corporate Snapshot
Toyota Motor Corporation 7.1m shares 3.6%
Mitsubishi Gas Chemical 7.1m shares 3.6%
ENEOS Xplora 6.4m shares 3.2%
Sprott Family Office 9.1m shares 4.6%
29.8m shares 15.0%
Non-Executive Chair
Alexander Downer
Non-Executive Director
Katherine Barnet
Managing Director
Neil McDonald
Executive Director
Roger Cressey
Shares on Issue – 198.5m at 24 November 2026
Managing Director 24.0m shares 12.1%
Strategic Investors 29.8m shares 15.0%
Top 20 Shareholders 124.3m shares 62.6%
Strategic Investors
Tenure
1 Granted Petroleum Licence – PEL 687 Ramsay Project (in second term)
8 Petroleum Licence Application Areas
1 Granted Mineral Exploration Licence
4 Gas Storage Application Areas (within PEL 687)
Key Stats
Current shares on issue 198.5m
Market Cap 79.4m (at $0.40 per share)
Board of Directors
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
2025 / 26 Ramsay Drilling and Flow Testing Campaign
1
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Executive Summary – What We Did and What We Found
Three wells flow tested between June and October 2026 – Helium, Natural Hydrogen and Helium-3 were all recovered at surface
* Helium: arithmetic average of sustained air-corrected concentrations at Ramsay 1 (19%), Ramsay 2 (20%) and Ramsay 3 (~6.5%). Hydrogen: modelled ~112 kg/day case for a 500 m horizontal well, not demonstrated by
flow testing. Helium-3: argon-corrected, preliminary, six samples. Modelled rates are not reserves or resource estimates. Refer ASX announcements dated 20 October, 2 November and 11 November 2026.
HELIUM
~15.2%
project-wide average concentration*
• Flowed to surface at all three wells
• Purified and bottled onsite – the first in
Australia since 2023
• Modelled ~37 Mscf/day per well – above
the ~27 Mscf/day Worley case
NATURAL HYDROGEN
~100 kg/day
modelled potential per well*
• Up to 97% Hydrogen at Ramsay 3, air-
corrected mud gas samples
• Parara Limestone flow tested 13 to 16
October 2026 utilising ESP
• ~78% field-wide average Hydrogen
concentration
HELIUM-3
1,220 ppt
peak concentration, argon-corrected*
• Detected in all six samples analysed by
Oxford University
• About 165 times the atmospheric level of
7.3 ppt
• Ramsay 3 results pending – analysis is
ongoing
9
Gold Hydrogen Limited 1
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Ramsay Helium Flow Test Campaign Successfully Completed
Helium flowed to surface at all three wells – the dataset for independent Contingent Resources and a modular Helium development
3 of 3
wells flowed Helium to surface
~15.2%
project-wide average Helium
concentration*
~14,000
bbl/day peak fluid rate at Ramsay 3
~37
Mscf/day modelled Helium rate
potential per well*
PROJECT-WIDE RESULTS
• Helium to surface at every well – Ramsay 1, 2 and 3, across the
core Ramsay Project area
• Australian first – Helium purified and bottled onsite at Ramsay 1
• ~15.2% average Helium – commercial projects run as low as 1%
• Highest rates to date – Ramsay 3 up to ~14,000 bbl/day;
Productivity Index ~34–40 bbl/day/psi
• Above the Worley case – modelled ~37 Mscf/day per well against
~27 Mscf/day identified as potentially commercially viable
• Gas–water ratio – ~3 scf/bbl (downhole bailer), up to 6.4 scf/bbl
(surface)
* Arithmetic average of sustained air-corrected Helium concentrations from the Kulpara Dolomite at Ramsay 1 (19%), Ramsay 2 (20%) and Ramsay 3 (stabilised ~6.5%; samples up to 12.6%). Field measurements are
preliminary and subject to independent laboratory confirmation. Modelled rates assume fluid rates of up to ~20,000 bbl/day and have not been demonstrated by flow testing. Worley case as reported 20 May 2026. Refer
ASX announcement dated 20 October 2026.
TECHNICAL & OPERATIONAL OBJECTIVES SUCCESSFULLY ACHIEVED
Scale up and maximise flow rates from Kulpara Dolomite
Demonstrate onsite separation and purification
Highlight reservoir continuity & quantify reservoir deliverability
Acquire zonal, pressure and reservoir data
Validate new well-bore designs
Manage and reinject produced water
Acquire samples for laboratory analysis
Safe operations – no lost time incidents
10
Gold Hydrogen Limited 1
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Helium-3 Confirmed in 2026 Flow Test Samples
Oxford University detected Helium-3 in all six Ramsay 1 and Ramsay 2 gas samples – results are preliminary and Ramsay 3 analysis is ongoing
6 of 6
samples with detectable Helium-3
1,220 ppt
peak argon-corrected Helium-3,
Ramsay 2 Hiltaba Basement*
~165x
atmospheric Helium-3 (7.3 ppt)*
~0.006
R/Ra isotopic ratio (0.0061–0.0068), in
line with 2024
PRELIMINARY ISOTOPIC RESULTS (ARGON-CORRECTED)
• Ramsay 1 – 504 and 534 ppt
• Ramsay 2 Kulpara Dolomite – 853 and 881 ppt
• Ramsay 2 Hiltaba Basement – 1,191 and 1,220 ppt
• Uncorrected range – 237 to 583 ppt across the six samples
• Tracks Helium-4 – the highest Helium-3 samples coincide with the
highest Helium-4 samples
• Sampling – collected during sustained ESP flow testing at higher
fluid rates than in 2024
* Argon was used to purge the flow test system, so results are corrected for that dilution and depend on the correction method; uncorrected values are also shown. Results are preliminary and based on a limited number of
samples. The 2024 maximum of 901 ppt was reported on an uncorrected basis and is not directly comparable. There is no certainty that Helium-3 can be recovered or sold. Refer ASX announcement dated 11 November 2026.
POTENTIAL ADDITIONAL VALUE STREAM – NOT YET ASSESSED
• Applications – quantum computing and cryogenics, neutron
detection, medical imaging and fusion research
• Not in any resource estimate – no assessment of recoverable
Helium-3 volume has been made
• Separation – Helium-3 from Helium-4 requires cryogenic
technology not yet demonstrated at Ramsay
• Next steps – Ramsay 3 results from Oxford, the CSIRO laboratory
program and a separation technology assessment with specialist
providers
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
Commercial Development Update
1
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Executive Summary – What’s Next: Scale Up
Four growth paths follow from the 2026 results – each is subject to further technical work, partners, approvals and funding
* Helium capacity figures are vendor design (nameplate) figures per train, accurate to ±25%, multiplied by the number of trains; they are not production targets. Additional trains are conceptual and unfunded. The green
methanol MOU is non-binding. Liquefaction and free-gas programs are plans, not commitments. Refer ASX announcements dated 2 November 2026 and 14 October 2026.
GREEN METHANOL
• Non-binding MOU with
Mitsubishi Gas Chemical
• Feasibility study targeted for
Q1 2027
• ~20,000 t/yr potential
suggested by modelling
HYDROGEN LIQUEFACTION
• Feasibility assessment of
liquid Hydrogen export from
Ramsay free gas
• Partner sought being
negotiated to lead technology
and offtake
• Free-gas discovery and scale
materially improve economics
FIVE-TRAIN HELIUM
• Initial train in final design and
procurement
• Two trains – ~11% of
Australian demand*
• Five trains – ~31.5 MMcf per
year, ~26% of demand*
• Liquefaction - 12 Trains can
provide all of Australias needs
and allow export.
FREE GAS HYDROGEN
• About 25% PEL 687 sits
outside the 1.3Bn kg
prospective resource estimate
• Step-out and appraisal
program planned for 2027–28
• A free-gas discovery would
improve economics for both
gases
2
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Pathway to Value – Helium and Natural Hydrogen Development
Stacked reservoirs – Natural Hydrogen sits above Helium, with both produced through dual-perforated wells
2026 FLOW TESTING COMPLETE
Helium and Natural Hydrogen
recovered at surface
INDEPENDENT CONTINGENT
RESOURCES
Helium sign-off targeted for Nov /
Dec 2026
DUAL-PERFORATION
DEVELOPMENT
Helium plant first · Hydrogen to
onsite power
3
Gold HydrogenLimited
goldhydrogen.com.au | ASX:GHY |
Ramsay Pathway – Timeline & Key Milestones
JUL – OCT 2026 Nov / Dec 2026 2027 – 2028 2029+
RAMSAY FLOW TESTING
Ramsay 1, 2 & 3
~40 days testing · 6 flow tests
BOOK
CONTINGENT
RESOURCES
Nov / Dec 2026
KEY DECISION GATE
NATURAL HYDROGEN PILOT
12-24 mths · H₂ onsite gas-to-power
generation
HELIUM PILOT
12-24mths · purification & supply to
Australian market
LONG TERM
Helium scale up and
Hydrogen derivative
(36–48 mths) · for
export
Contingent Resource booking underpins near-term H₂ & He pilot decisions
IN PARALLEL – BUILDING SCALE
STEP OUT EXPLORATION · 0–24 MONTHS — G&G surveys · mature, rank & drill up to three wells · further H₂ and He discoveries grow each
resource base
Helium Balloon Demonstration
H2 Onsite Genset Demonstration
15
Gold Hydrogen Limited
Commercial Helium and Hydrogen – Sample Global Projects
HELIUM HYDROGEN
In production since 2023
Renergen — Virginia Gas Project
Free State, South Africa
He concentrations up to 12% from U/Th radioactive decay in Vredefort Crater basement. Gas dissolved in
formation water and trapped beneath dolerite cap rock. Significant water production requires dewatering. Phase 1
producing liquid Helium (350 kg/day). LNG co-production. (Renergen (ASX: RLT) corporate disclosures 2024/5)
In production
Shanxi Fengsheng Company
Shanxi Province, China
Ultra-high purity Helium (99.9999%, 6N grade) from coalbed methane using integrated rectification, membrane,
PSA, alloy dehydrogenation, and cryogenic purification. Extraction of dissolved/entrained gases from water-bearing
coal seam formations. Technology applicable to He/H₂ co-extraction. (Industry trade press 2023/4, eg. Gasworld)
Historic production
Kansas Basin / Central Kansas Uplift
Kansas, USA
Up to 10% Helium with ~90% nitrogen. Groundwater was oversaturated with He-N₂; depressurisation caused
exsolution into free-gas phase. Water-bearing zones required dewatering to produce. One of the earliest
commercial Helium sources globally (from 1903). Some fields now depleted.
In production / supergiant
Hetianhe Field — Tarim Basin
Xinjiang, China
China's first supergiant Helium field (~0.3% He). Neon concentrations tracking groundwater rise in step with
Helium, confirming Helium migrated dissolved in ancient groundwater before exsolving. Nitrogen acts as carrier
gas. Shallow, low-pressure traps in Carboniferous/Ordovician reservoirs. (Earth.com May 2026)
Commercial technology
Quantum Technology (Q18.1 He-PP)
Squamish, Canada / Blaine, USA / Léry, France
Proven commercial Helium production plant technology. Integrates membrane, PSA/VSA/TSA, and cryogenic
purification. 1–40 MMscfd feed gas, He purity 95–99.995%, 70–95% recovery. Plants deployed at inert gas,
hydrocarbon and water-bearing wells. BOO or SOE basis. (Quantum Technology Vendor Specification)
In production since 2012
Hydroma Inc. — Bourakébougou Field
Mali, West Africa
World's first and only operating natural H₂ project. 98% pure H₂ from dolomitic carbonate at ~100m. H₂ dissolved in
deep formation water degasses into shallow karstic voids at reduced pressure. Reservoir spontaneously recharges.
Powering village electricity since 2012. 25 wells drilled. (Rigollet & Prinzhofer (2022) Natural Hydrogen
article. Available on GHY website)
Proven discovery / Pre-dev
La Française de l'Énergie (FDE) / CNRS
Lorraine Basin, France
Discovered H₂ dissolved in deep aquifer water at 1,100–1,250m using gas probes in former coal basin. 14–208L H₂
measured in dissolved phase in groundwater. Estimated 6–250 Mt H₂. CNRS probe technology detects dissolved H₂
in rock formations to 1,500m. Advancing toward Europe's first natural H₂ production (target 2029). (GeoResources
Laboratory published estimates 2023/4. FDE corporate communications)
Commercial technology
Quantum Technology (Q16.4 QPure-H2)
Squamish, Canada / Blaine, USA / Léry, France
Proven commercial Hydrogen purification system. Produces saleable 99.7+% H₂ from green, grey, or blue sources.
Feed gas 100–3,000 SCFM, 1–40 bara feed pressure, 70–90% H₂ recovery. Removes N₂, O₂, H₂O, CO₂. Compact
modular skid with fast start-up/shutdown. 4–12 PSA vessels. ASME/CRN/NEC compliant. ATEX Zone II
rated. (Quantum Technology Vendor Specification)
KEY TAKEAWAY: Helium extraction from water-bearing systems is proven across
multiple geologies. Ramsay applies the same dissolved gas extraction process
used commercially in Japan for 70+ years with modern membrane and PSA
Helium / Natural Hydrogen extraction systems.
16
Gold Hydrogen Limited
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
Commercial Summary - Helium
17
Gold Hydrogen Limited
Australia’s Helium Supply Compromised
Iran strikes on Qatar's Ras Laffan complex have removed roughly a third of global Helium supply.
33%
of global Helium
produced at Qatar's Ras Laffan complex — struck and offline
since 2 March 2026
~5 yrs
below pre-war output
Qatari production could remain ~15% below pre-war levels for
at least five years
100%
Australian import-reliance
Darwin Helium plant closed Dec 2023; Australia & NZ produce
zero domestic Helium
WHY IT MATTERS
• Qatar + US supply ~80% of globally traded Helium — concentration leaves no easy substitute when Ras Laffan goes offline.
• Helium is a by-product of LNG: when LNG stops, Helium stops. Russia's Amur and US storage can replace only ~half of lost Qatari volumes.
• Helium spot prices have already doubled. ISO containers move through the Strait of Hormuz; logistics, not just production, are now constrained.
Refer 1. ASX announcements of 28 April and 20 May 2026 for further details
2. USGS Mineral Commodities Summary 2025
3. Kornbluth Helium Consulting market reports March-May 2026; AKAP Energy market commentary
18
Gold Hydrogen Limited
Worley has defined the typical gaseous Helium production process in the diagram below to produce a compressed gaseous product to 99.999% He purity. This
arrangement is based on typical requirements for gaseous Helium production and will require engagement with Vendors in future phases to confirm process specifics.
These equipment items were included in the development of the CAPEX, with key features noted.
• Prod. wells, water inj. wells
& flowlines – nominal 1 km
length, 1 flowline per well
(water and prod)
• Water injection pumps
• Inlet separator
• Gas compressor
(4 stage recip)
• Helium Tube
Trailers (1
week of
inventory)
Power connection
Base Case – 33 kV
transmission line,
33/11 kV
transformer
Utilities, NPI and Site Prep
• Utilities systems, electrical distribution
and control systems
• Buildings – control room, warehouse
• Site preparation, clearing etc
• Helium membrane
vendor supplied
skid equipment:
highlighted red
0.36 barg 45 barg 1.5 barg
Wellhead Inlet
separation &
compression
PSA Unit Storage
compression
Storage vessel
(Tube trailer)
Recycle
compression
PSA
compression
Vented gases
Membrane
separation
Water
reinjection
Process
Water
Vented gases
Catalytic oxidiser
8 barg 6.5 barg 3,500 barg
59 barg
99.999%
Helium
Worley Have Completed Commercial Models and Basis of Design
Commercial Summary - Natural Hydrogen
19
Gold Hydrogen Limited
Naturally occurring Hydrogen offers significant cost and / or carbon advantages relative to other Hydrogen production
(manufacturing) processes
Gold Hydrogen is exploring for ‘gold’ or
‘white’ (natural) Hydrogen
Types of Hydrogen Production
Gold / White
(natural)
Grey Black/Brown Blue Green
Energy source Natural hydrogen Natural gas Coal
Natural gas /
coal
Renewables /
biomass
Environmental impact Low High Very High Low Low
No thermal process
Production cost (A$/kg)1,2 $1.00 $5.60 $6.20-$6.40 $10.20-$10.30
P: $6.40-$25.50
A: $4.70-$23.20
Cost comparable to existing
power generation3
Today, ~95% of all hydrogen produced is
from natural gas
Source: Frost and Sullivan, Sep-2022 (Refer Gold Hydrogen Replacement Prospectus dated 29 November 2022)
1. Source: Christophe Rigollet1, Alain Prinzhofer2,3, Natural Hydrogen: A New Source of Carbon-Free and Renewable Energy That Can Compete With Hydrocarbons, First Break, Volume 40, Issue 10, Oct 2022, p. 78 – 84
DOI: https://doi.org/10.3997/1365-2397.fb2022087; “The Bourakébougou field, in Mali, represents the first Natural Hydrogen deposit studied both scientifically and industrially.
It gives us information on its renewability, on the natural flows involved and therefore on its sustainable exploitation. It is possible to estimate that the cost of operating hydrogen would be less than $1/kg, which is significantly cheaper than
any manufactured hydrogen, whether green, grey, or blue. Equivalent work is in progress in other continents, in order to be able to compare our knowledge of this Malian field with other fields in the world, which will make it possible to
better ensure the industrial and societal interest of R&D for this new field.”
2. P = Polymer electrolyte membrane electrolysis. A = Alkaline Electrolysis. Gold Hydrogen cost is an estimate
3. For industrial buyers, a hydrogen offtake price of €3 ($4.50) per kg would be required to incentivise hydrogen production over power generation
goldhydrogen.com.au | ASX:GHY |
20
Gold Hydrogen Limited
Not required with Natural Hydrogen
June 2026: non-binding MOU
executed with Mitsubishi Gas
Chemical for staged study of
potential Yorke Peninsula green
methanol production.
Progression to PFS / DFS / FEED is
conditional on results and project
viability.
A Diesel Replacement - Green Methanol Opportunity
Committed to Developing Naturally
Occurring Hydrogen and Helium in
Australia
Appendicies
22
Gold Hydrogen Limited
Technical Tables and Prospective Resource Tables
Ramsay 3 Drilling – November 2025
23
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
goldhydrogen.com.au | ASX:GHY |
Table 1 – Ramsay 3 Hydrogen Purity Results, 2025 Drilling Campaign (2 Dec 2025)
24
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
25
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
Table 5 – Ramsay 3 Helium Flow Test 2026 Phases 1 & 2 (20 October 2026) Table 6 – Ramsay 2 Sample Test Analysis – 2026 Flow Test (25 August 2026)
26
Gold Hydrogen Limited
Technical Tables – ASX Listing Rule 5.30
Table 7 – Preliminary Helium and Helium-3 Results Ramsay 1, 2026 Flow Test (11 November 2026) Table 8 – Preliminary Helium and Helium-3 Results Ramsay 2, 2026 Flow Test (11 Nov 2026)
27
Gold Hydrogen Limited
Helium Flow Test Summary Table (2026 Campaign)
Table 9 – Ramsay Project 2026 Flow Test – Helium Results by Well (20 October 2026)
28
Gold Hydrogen Limited
Gold Hydrogen Prospective Resources (Using PRMS guidelines)
Unrisked Prospective Hydrogen
Resources, PEL 687
SPE-PRMS Sub-Class Category Low Estimate
(kTonnes)
Best Estimate
(kTonnes)
High Estimate
(kTonnes)
Prospect 165 1,135 8,050
Lead 42 178 770
Total 207 1,313 8,820
Certified Prospective Hydrogen