Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Quarterly Activities Report for the Period Ended 31 March 2024
GOLD HYDROGEN LTD (ASX:GHY)
HIGHLIGHTS FOR THE MARCH QUARTER
Shares on Issue
159.7 million
Mean estimate of 96 billion cubic feet (Bcf) of Helium
over approximately 25% of the Ramsay Project area
(PEL 687), which, if replicated across the tenement,
would potentially make this a world-class Helium
project. See Table 1 below for full details, including the
high, low and best estimates. The Company notes that
the estimated quantities of Helium that may
potentially be recovered by the application of a future
development project(s) relate to undiscovered
accumulations.
These estimates have both an
associated risk of discovery and a risk of development.
Further exploration, appraisal and evaluation is
required to determine the existence of a significant
quantity of potentially recoverable Helium.
Market Capitalisation
A$208m (at A$1.30 per share)
Directors
Rt Hon Alexander Downer (Chair)
Neil McDonald (Managing Director)
Roger Cressey (Executive Director)
Katherine Barnet (Non-Executive Director)
Company Secretary / CFO
Karl Schlobohm
Contact Details
Level 14, 110 Eagle Street
Brisbane QLD 4000
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
Matthew.doman@crestviewstrategy.com
+61 421 888 858
W: https://goldhydrogen.com.au/
E : info@goldhydrogen.com.au
LinkedIn: Gold Hydrogen Ltd
X:
@GHY_ASX
Exploration well testing operations, which are
pioneering for both Natural Hydrogen and Helium in a
non-petroleum system, commenced on 5 March 2024
at the site of the Company’s successful Ramsay 1 and
Ramsay 2 exploration wells.
The objectives of the exploration well tests are to
obtain more samples of both Natural Hydrogen and
Helium for further specialist isotopic and
compositional analysis in world-leading laboratories,
and to extract both Natural Hydrogen and Helium to
surface.
Initial results from the exploration well testing
program confirm an air-corrected Helium result of
17.5% taken from an MDT sample at a depth of 778m
in Ramsay 2. Details in body of report.
Stage 1 of the well testing operations have now been
completed on-site, with laboratory testing and
analysis of samples ongoing. A second stage of
extended well testing is currently in advanced
planning.
Gold Hydrogen Limited – Quarterly Activities Report
EXPLORATION AND TECHNICAL ACTIVITIES
`
General Background
Gold Hydrogen is focused on the discovery and development of world class Natural Hydrogen and
Helium gases in a potentially extensive and world class Natural Hydrogen and Helium province in
South Australia. The domestic and global demand for Hydrogen, combined with new Natural
Hydrogen exploration techniques and experienced personnel, provides Gold Hydrogen with an
extraordinary opportunity to define and ultimately develop a new Natural Hydrogen gas province.
Further to this, Helium is extremely rare and expensive, there is limited world-wide production and
almost nil production of Helium in Australia. Gold Hydrogen is well placed to potentially prosper from
this opportunity.
Figure 1 – Gold Hydrogen PEL 687 and areas under application located in South Australia.
The combined permit area of the Gold Hydrogen group which is prospective for Natural Hydrogen and
Helium is approximately 75,332km2. Gold Hydrogen holds one granted petroleum exploration license
(PEL 687) and its two 100% owned subsidiary companies (White Hydrogen Australia and Byrock
Resources) hold an additional seven (7) applications within South Australia (refer Figure 1).
Gold Hydrogen Limited – Quarterly Activities Report
p. 2
`
Gold Hydrogen is also the preferred applicant for four (4) gas storage exploration license applications
(GSELA) covering an additional 8,107km2 within the renewable energy zone of PEL 687 of the Yorke
Peninsula region of South Australia. A summary of the status of the group’s petroleum and storage
licence tenure as at the end of the Quarter is outlined in Appendix A.
Prospective Helium Resource Report
Gold Hydrogen engaged Teof Rodrigues and Associates (TRA) as independent certifiers to estimate
the Prospective Helium Resources within the Ramsay Project area on the Yorke Peninsula based on
the drilling results for the Ramsay 1 & 2 exploration wells, and other regional data points suggesting
a regional Helium source. Table 1 shows the results of application of the industry standard assessment
method (SPE-PRMS) to estimate the Helium resources.
Table 1 – Helium Prospective Resources within the Ramsay Project area and PEL 687
Gold Hydrogen Prospective Resources* of Helium in Bcf - Ramsay Project (PEL 687 Yorke Peninsula) 21 February 2024
PEL
Prospects
PEL 687
All
Prospects
PEL 687
PEL 687
Ramsay
Fault Block
South of
Ramsay
Fault Block
SPE
PRMS
Subclass
Prospect
Formation
1U
2U
3U
Low
Best
MEAN High
Estimate Estimate
Estimate
Pg
All Formations
Total
7
41
96
243
17% 60% 10%
Kulpara Formation
0.8
3.6
7.0
17.1
29% 60% 17%
Winulta Formation
0.1
0.6
1.6
4.0
12% 60% 7%
Fractured Basement 0.7
3.8
6.9
16.7
13% 60% 8%
Sub-Total
2
8
15
38
20% 60% 12%
Kulpara Formation
2.1
12.8
3 0.5
77.6
23% 60% 14%
Winulta Formation
0.3
2.4
7.7
19.8
8%
10.3
25.5
65.2
12% 60% 7%
7.7
17.0
42.7
12% 60% 7%
33
81
205
16% 60% 10%
Fractured Basement
1.6
Prospect Hilbata Suite
Fractured Basement
Yorke Peninsula
1.4
Heel
Sub-Total
5
Pd
Pc
60% 5%
*This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the
notes in the Company’s ASX release of 21 February 2024. The Company confirms that it is not aware
of any further new information or data that materially affects the estimates of Helium Prospective
Resources, and that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed.
These Helium Prospective Resources are estimated quantities of Helium that may potentially be
recovered by the application of a future development project(s) and relate to undiscovered
accumulations. These estimates have both an associated risk of discovery (Pg) and a risk of
development (Pd). Further exploration, appraisal and evaluation is required to determine the
existence of a significant quantity of potentially recoverable Helium.
Gold Hydrogen Limited – Quarterly Activities Report
p. 3
`
Figure 2 – Map outlining the on-shore location of the Prospective Resource Report for Helium
Potential for a “Green Helium” Project
Extracting Helium from an area that has no petroleum system is potentially ground-breaking, as
currently 95% of Helium is produced from petroleum and fossil fuel environments, making “green”
Helium (ie. not derived as a by-product of a hydrocarbon development) an emerging opportunity. 1
Helium Uses
Helium has many industrial, medical and technical uses, as outlined below:
1
“About Helium” www.noblehelium.com.au
Gold Hydrogen Limited – Quarterly Activities Report
p. 4
`
Ramsay 1 & 2 Well Testing Program – Operations & Objectives
Exploration well testing operations at the Ramsay 1 and Ramsay 2 well sites commenced on 5 March
2024. Well testing experts, SGS Australia supplied the flow back testing package including all pressure
and flow sensors and gas sampling equipment. Experienced gas contractors Well Pro and MPK
supplied the coil tubing unit, plus the nitrogen pumping and wireline operations for the work. During
the well testing phases, extensive gas sampling is being conducted by SGS together with Petro Lab and
CSIRO. Gas samples taken to date have been sent to various local and international laboratories to
have full gas composition and noble gas isotope tests conducted. It is expected that these technical
tests could take several months to fully complete. Well testing experts ERCE have been engaged to
provide an independent review of the testing program, utilising experts in Perth and London.
Figure 3 – Exploration Well Testing Equipment on Site at Ramsay 2
The Company considers this to be the start of an exciting journey, which is not dissimilar to that
undertaken by various world-renowned and ultimately successful oil and gas projects, like the early
days in the CSG and shale industries. For those particular resources, the exploration and completion
techniques were developed and optimised over time, improving project economics and ultimately
leading to major projects being developed.
There is very little data available for dedicated Hydrogen wells anywhere in the world due to the lack
of analogue wells. Accordingly, there is inherent uncertainty with regard to the expected outcomes
of the Ramsay 1 and Ramsay 2 exploration well testing program.
Gold Hydrogen Limited – Quarterly Activities Report
p. 5
Ramsay 1 & 2 Well Testing Program – Stage 1 and Stage 2
`
The initial results from Stage 1 of the well testing program on the Ramsay 1 well confirmed the
Company’s interpretation that not only are Natural Hydrogen and Helium present in the different
reservoir units at the Ramsay 1 location (as per Ramsay 1 MDT results recorded and announced at
the time of drilling), but it also confirmed that both gases can be recovered at the top of the well bore
through natural fluid flow from a large bare foot completion.
As reported by the Company on 25 March 2024, analysis received for gas recovered at surface from
Ramsay 1 indicated levels of oxygen comparable with the composition of the lifting gas used to
evacuate the fluid from the well bore. This suggests no oxygen enrichment occurs from in-situ gas
from within the reservoirs, and this is supporting the view that no measurable free oxygen is present
in the fractures and pores space in the different reservoir units. Oxygen measured within the MDT
samples taken from Ramsay 1 and Ramsay 2 is therefore most likely to be air contamination, rather
than a true compositional measurement of the gas from the reservoir pore space.
As outlined in the Company’s ASX releases of 6 and 19 December 2023, the MDT sample recovered
from 778mMD during the drilling of Ramsay 2 recorded a raw Helium concentration of up to 6.8%
with significant amounts of oxygen present in the MDT sample. Based on the observations of the
Ramsay 1 well test, this MDT sample will require correction for the interpreted air contamination,
resulting in a most likely true concentration of Helium in the MDT sample recorded during the drilling
of Ramsay 2 of up to 17.5%. Refer Table 2 below for further technical information.
This is believed to be among the highest concentrations of Helium found in the world and which could
be attributed to its presence in a non-petroleum system setting. By comparison, a recent large
discovery reported by Pulsar Helium found a Helium concentration of 13.8% (prior to any required aircorrection) from Jetstream 1 well in Minnesota, USA2.
Well testing operations for Stage 1 of the testing program recently wrapped up on site, following the
discreet testing of eight (8) separate zones within the Ramsay 2 well. The Company will prepare a
market release on the conclusions and results from the Stage 1 well testing operations once it has
sufficient data (including laboratory results of gas and fluid samples) to provide a meaningful and
comprehensive summary of the technical outcomes. As the Company has been highly encouraged by
the insights gained from Stage 1 of the testing program, particularly including indications of the
permeability and porosity of the sub-surface structures, it has moved into advanced planning for a
Stage 2 extended well testing program to be undertaken in June, subject to equipment availability and
any required approvals.
The Stage 2 exploration well testing will involve the mobilisation of existing specialised equipment to
lift the water in the well bores. The method is standard in testing with a single completion via a pump
attached with the tubing for the water to flow, and an annulus to produce a free gas. At surface, the
gas from both systems will be recombined downstream of, a separator, with combined gas volume
and flow rate measurement.
With the data obtained from the Stage 1 and Stage 2 well tests, Gold Hydrogen will better understand
the characteristics of the Natural Hydrogen and Helium reservoirs. The data and its subsequent
analysis will assist the Company in gaining technical insights into how the Ramsay Project area could
be further explored and appraised, including future well designs and testing protocols, as well as
providing input for a future pilot plant / proof-of-concept plant design.
https://www.startribune.com/Helium-gas-drilling-iron-range-minnesota-pulsar-edelgas-duluthmetals/600351052/
2
Gold Hydrogen Limited – Quarterly Activities Report
p. 6
`
Table 2 – Listing Rule 5.30 Information – Ramsay 2 Well
Name:
Location (UTM zone 53
GDA2020)
X
747,761.61
Y
6149371.41
Permit
Entity holders
Resources
Formation
Gross thickness and net
pay thickness*
Geological rock type
Depth of the zones tested
Type of test and duration
Phase recovered
Other types of recovery
Flow rates, choke size,
volumes recovered
Fracture stimulation
Material non hydrocarbons
Ramsay 2
PEL687
Gold Hydrogen 100%
Helium
Kulpara Fm and Winulta Fm
246m Gross
Dolomites and Dolomitic Sandstones
778mMD
MDT
Water
N/A
N/A
None
Nitrogen
* Insufficient information is presently available to determine net pay thickness.
First Key Step on the Journey to Future Potential Development
The Company is of the view that the Ramsay Project contains significant prospective resources of both
Natural Hydrogen and Helium, with large scale potential that it is aiming to be potentially developed
over time.
There is very little data available for dedicated Natural Hydrogen wells anywhere in the world due to
the lack of analogue wells. Accordingly, there is inherent uncertainty with regard to the expected
outcomes of the Ramsay 1 and Ramsay 2 exploration well testing program. To the Company’s
knowledge, the only Natural Hydrogen field currently in production is located in Mali, West Africa,
where Natural Hydrogen production is used to power the small town of Bourakébougou. It has been
reported that the Natural Hydrogen wells in Mali do not have any decline in production and are
continually regenerating and producing at the same rate. 3
Helium is extremely valuable and indicatively, longer-term bulk pricing is expected to approximate
USD450 per Mcf (thousand cubic feet). 4
“Natural Hydrogen: a new source of carbon free and renewable energy that can compete with
hydrocarbons”, First Break Volume 40, October 2022 (available via www.goldhydrogen.com.au/technicalarticles/)
4
February 2024, www.noblehelium.com.au, quoting Konbluth Consulting.
3
Gold Hydrogen Limited – Quarterly Activities Report
p. 7
`
Important Risk Commentary
It is important to note that there remain both geological and potential development risks associated
with the Ramsay Project and the Company’s commercial and business objectives. These risks relate
to the presence, recovery, and potential volumes of Natural Hydrogen and Helium, but also due to the
location of the current and potential project sites within agricultural areas and proximal to National
Parks on both the Yorke Peninsula and Kangaroo Island, requiring significant landholder and
community engagement. The worldwide, Federal and South Australian Government and industry
efforts to secure Hydrogen as an alternative energy source provides confidence that any technical and
social concerns may be overcome.
Table 3 – Prospective Resource Statement for Natural Hydrogen
Gold Hydrogen’s Ramsay Project: Prospective Resources* of Hydrogen in ‘000 Tonnes – 30 Sept 2021
PEL
Prospects
PEL 687
All
Prospects
and Leads
SPE PRMS
Sub-class
1U
Low
Estimate
2U
Best
Estimate
Mean
3U
High
Estimate
Pg
Pd
Pc
207
1313
4187
8820
22%
48%
10%
Yorke
Peninsula
PEL 687
Ramsay FB
Prospect
124
931
2712
6989
22%
50%
11%
PEL 687
Ramsay Lst
Prospect
10
70
191
492
26%
50%
13%
PEL 687
Maitland
Lead
7
26
40
92
17%
35%
6%
PEL 687
Navigator
Lead
34
152
280
678
19%
40%
8%
PEL 687
Kanmantoo
Prospect
32
134
237
569
25%
40%
10%
Kangaroo
Island
*This estimate of Natural Hydrogen Prospective Resources must be read in conjunction with the
notes in the Company’s ASX release of 13 January 2023.
The Company confirms that it is not aware of any further new information or data that materially
affects the estimates of Natural Hydrogen Prospective Resources (as originally estimated on 30
September 2021), and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
It should be noted that the estimated quantities of Natural Hydrogen that may potentially be
recovered by the application of a future development project(s) relate to undiscovered
accumulations. These estimates have both an associated risk of discovery and a risk of development.
Further exploration, appraisal and evaluation is required to determine the existence of a significant
quantity of potentially recoverable Natural Hydrogen.
Gold Hydrogen Limited – Quarterly Activities Report
p. 8
`
CORPORATE ACTIVITIES
During the Quarter the Company received a $1.9m tax refund related to its R&D expenditure for the
period to 30 June 2023. This was based on the pioneering and experimental nature of the Company’s
work on the Ramsay Project, which is set to continue.
FINANCIAL REPORTING
Exploration expenditures that were capitalised relate to the Company’s flagship Ramsay Project (PEL
687) over the Yorke Peninsula / Kangaroo Island.
Exploration Expenditures – Item 1.2(a) of Quarterly Cashflow Report
Nature of Expenditure
Airborne and seismic surveys and sub-surface studies
Environmental and permitting costs
Native Title, land access and licence fees
Drilling and related activities
Less R&D refund received from Australian Taxation Office
Total*
Amount
$135,841
$26,480
$75,922
$2,406,057
$(1,912,083)
$732,216
* The total gain in exploration & evaluation assets has been offset by the R&D refund amount received by the Company in
accordance with Australian Accounting Standards. Figures may be rounded to the nearest dollar.
Payments to Directors – Item 6.1 of Quarterly Cashflow Report
Payments consisted of fees paid for Executive Director and Non-Executive Director services, pursuant
to written agreements and employment contracts, totalling $210,190 for the March Quarter (although
some payments made during the Quarter related to prior periods).
Reporting Against IPO Use of Funds
The Company remains on track with regard to its forecast spending and activities as outlined in its 29
November 2022 Replacement Prospectus. The amount of funds expended on exploration expenditure
as originally forecast will be partially offset or supplemented via access to R&D offset funding.
Use of Funds
Figures Reported Net of GST
Prospectus
2-year period
FY23
Total
Sep-23
Quarter
Dec-23
Quarter
Mar-24
Quarter
Cumulative
Total
Native Title, Land Access and Licence Fees
$
1,490,223
$
78,702
$
90,901
$
85,589
$
75,922
$
331,114
Environmental and Permitting Costs
$
690,250
$
192,477
$
364,766
$
46,570
$
26,480
$
630,293
Airborne and Seismic Surveys and Sub-surface Studies
$
2,747,120
$ 1,678,066
$
69,695
$
462,440
$
135,841
$
2,346,041
Drilling and Related Activities
$ 10,303,493
$
538,164
$
128,837
$ 6,301,124
$
2,406,057
$
9,374,183
Less R&D Refund Received from Australian Taxation Office
$
$
-
$
-
$
$ (1,912,083)
$ (1,912,083)
Total Exploration, Field Development and Drilling Related
$ 15,231,086
$ 2,487,409
$
654,199
$ 6,895,724
$
732,216 (a)
$ 10,769,547
Corporate and Administrative Costs
$
3,523,500
$ 1,384,533
$
500,719
$ 1,364,379
$
(328,281) (b)
$
2,921,350
IPO Related Costs
$
1,351,129
$ 1,052,072
$
-
$
$
-
$
1,052,072
Total Use of Funds
$ 20,105,715
$ 4,924,013
$ 1,154,918
$
403,935
-
-
-
$ 8,260,103
$ 14,742,970
(a) The total gain in exploration & evaluation assets has been offset by the R&D refund amount received by the
Company in accordance with Australian Accounting Standards.
(b) Approximately $490,000 in corporate and administrative costs was offset by $297,500 in interest received on term
deposits, and approximately $521,000 in net GST on purchases made by the Company.
Gold Hydrogen Limited – Quarterly Activities Report
p. 9
`
This report has been authorised for release by the Board.
For Company Enquiries Contact:
Neil McDonald – Managing Director
nmcdonald@goldhydrogen.com.au
+61 7 3521 8038
Karl Schlobohm – Company Secretary / CFO
kschlobohm@goldhydrogen.com.au
+61 7 3521 8038
For Media Enquiries Contact:
Matthew Doman – Crestview Strategy
matthew.doman@crestviewstrategy.com
+61 421 888 858
Website:
LinkedIn:
Twitter:
Contact:
www.goldhydrogen.com.au
Gold Hydrogen Ltd
@GHY_ASX
info@goldhydrogen.com.au
QPRRE Statements
The Prospective Resource Statements for Natural Hydrogen and Helium have been included in this
report under the approval of Mr Billy Hadi Subrata, Chief Technical Officer for Gold Hydrogen, who is
a Qualified Petroleum Reserves and Resources Evaluator. Mr Hadi Subrata confirms that, as at the
date of this report, there are no changes to information or any additional information, since the
effective date of each prospective resource report (refer below), that would materially change the
estimates of prospective resources quoted.
QPRRE Statement – Natural Hydrogen
The Prospective Resource Statement for Natural Hydrogen in this report is based on, and fairly
represents, information and supporting documentation prepared by independent consultants “Teof
Rodrigues & Associates” with an effective date of 30 September 2021, and which forms part of the
Company’s Replacement Prospectus dated 29 November 2022. The Prospective Resource Statement,
together with all relevant notes, also appears in the Company’s ASX release of 13 January 2023.
QPRRE Statement – Helium
The Prospective Resource Statement for Helium in this report is based on, and fairly represents,
information and supporting documentation prepared by independent consultants “Teof Rodrigues &
Associates” with an effective date of 21 February 2024, and which was announced by the Company
on that date together with the accompanying assumptions and notes.
About Gold Hydrogen
Gold Hydrogen is focused on the discovery and development of world class Natural Hydrogen and
Helium gases in a potentially extensive and world class Natural Hydrogen and Helium province in
South Australia. The domestic and global demand for Hydrogen, combined with new Natural
Hydrogen exploration techniques and experienced personnel, provides Gold Hydrogen with an
extraordinary opportunity to define and ultimately develop a new Natural Hydrogen gas province.
Further to this, Helium is extremely rare and expensive, and there is limited world wide production
and almost nil production of Helium in Australia. Gold Hydrogen is well placed to potentially prosper
from this opportunity.
Gold Hydrogen Limited – Quarterly Activities Report
p. 10
`
The combined Natural Hydrogen permit area of the Gold Hydrogen group is approximately 75,332km2.
Gold Hydrogen holds one granted petroleum exploration license (PEL 687) and its two 100% owned
subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an additional seven (7)
applications for Natural Hydrogen exploration within South Australia. Gold Hydrogen also has four (4)
gas storage licence applications (GSLAs) within its granted PEL 687 covering an additional 8,107km2.
Forward Looking Statement / Future Performance
This announcement may contain certain forward-looking statements and opinion Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which
are outside the control of the Company and which are subject to change without notice and could
cause the actual results, performance or achievements of the Company to be materially different from
the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is
made as to the likelihood of achievement or reasonableness of any forward-looking statements or
other forecast. Nothing contained in this announcement, nor any information made available to you
is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past,
present or the future performance of Gold Hydrogen Limited.
Gold Hydrogen Limited – Quarterly Activities Report
p. 11
Appendix A
`
Overview of the Gold Hydrogen Group’s PEL, PELAs and GSELAs
The only granted tenement at 31 December 2023 was the 100% owned Ramsay Project tenement of PEL
687.
Gold Hydrogen Limited – Quarterly Activities Report
p. 12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Gold Hydrogen Limited
ABN
Quarter ended (“current quarter”)
74 647 468 899
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(2,644)
(10,194)
(b) development
-
-
(c) production
-
-
(d) staff costs
(412)
(1,009)
(e) administration and corporate costs*
(79)
(698)
-
-
298
352
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
1,912
1,912
1.8
Other (GST)
521
(181)
1.9
Net cash from / (used in) operating
activities
(404)
(9,818)
* Administration and corporate costs includes an amount of approximately $7,605 in share issue costs
related to an issue of equity from the previous quarter.
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(4)
(d) exploration & evaluation
-
-
(e) investments
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
(f)
Year to date
(9 months)
$A’000
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(4)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
14,034
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
14,034
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
20,889
16,272
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(404)
(9,818)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(4)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
14,034
2.2
other non-current assets
Current quarter
$A’000
Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period*
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
20,485
20,485
* Figures may differ slightly as numbers are rounded to the nearest thousand dollars each quarter.
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
5,055
13,459
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (term deposit(s))
15,000
7,000
5.4
Other (SA DEM security)
400
400
5.4
Other (bank guarantee)
30
30
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
20,485
20,889
* Figures may differ slightly as numbers are rounded to the nearest thousand dollars each quarter.
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
210
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.